ALDOT contract 20260130025 bid tabulation
ROADWAY IMPROVEMENTS/ADDITIONAL LANES AND RESURFACING ON SR-53 FROM THE JUNCTION OF CR-19 (JEFF ROAD) TO THE INTERSECTION OF CR-108 (HARVEST ROAD) IN HARVEST. Let by Alabama DOT on January 30, 2026, Madison, 0102. 4 bids received; low bid $5,265,450 by Rogers Group, Inc..
- Owner
- Alabama DOT
- Letting
- 30 JAN 2026
- Pay items
- 130
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $5,265,450 | Low |
| 2 | Grayson Carter & Son Contracting, Inc. | $5,464,821 | +4.0% |
| 3 | Wiregrass Construction Company, Inc. | $6,317,745 | +20% |
| 4 | Bulls Construction Group, LLC | $8,257,977 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Grayson Carter & Son Contracting, Inc. | 3. Wiregrass Construction Company, Inc. | 4. Bulls Construction Group, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 0020 | Removing concrete slope paving (206C002) | SY | 16 | $37.00 | $74.06 | $60.00 | $100.00 |
| 0030 | Removing concrete driveway (206C010) | SY | 1,204 | $6.40 | $14.98 | $12.72 | $20.00 |
| 0040 | Removing pipe (206D000) | LF | 1,160 | $20.00 | $18.93 | $10.57 | $20.00 |
| 0050 | Removing guardrail (206D001) | LF | 245 | $6.00 | $5.62 | $3.62 | $6.35 |
| 0060 | Removing curb (206D002) | LF | 76 | $7.40 | $11.48 | $24.77 | $20.00 |
| 0070 | Removing curb and gutter (206D003) | LF | 160 | $7.00 | $10.91 | $22.63 | $20.00 |
| 0080 | Removing headwalls (206E000) | EACH | 31 | $290.00 | $173.93 | $245.69 | $1,000.00 |
| 0090 | Removing inlets (206E001) | EACH | 3 | $560.00 | $264.13 | $975.21 | $1,500.00 |
| 0100 | Removing guardrail end anchor (all type) (206E008) | EACH | 1 | $560.00 | $558.55 | $137.54 | $635.00 |
| 0110 | Unclassified excavation (210A000) | CY | 18,467 | $13.75 | $12.92 | $25.50 | $40.00 |
| 0120 | Borrow excavation (210D000) | CY | 12,535 | $23.00 | $15.21 | $32.00 | $40.00 |
| 0130 | Structure excavation (214A000) | CY | 4,945 | $9.00 | $10.71 | $11.53 | $40.00 |
| 0140 | Foundation backfill, commercial (214B001) | CY | 1,898 | $39.00 | $23.28 | $46.77 | $75.00 |
| 0150 | Roadbed stabilizing material, crushed aggregate base (231B005) | TON | 4,758 | $30.50 | $34.93 | $51.01 | $75.00 |
| 0160 | Cement mortar flowable backfill, mix 1 (260A000) | CY | 7 | $580.00 | $519.79 | $657.00 | $1,500.00 |
| 0170 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 20,175 | $9.70 | $10.01 | $12.46 | $25.00 |
| 0180 | Crushed aggregate, section 825, type B, for miscellaneous use (305B078) | TON | 395 | $31.00 | $38.43 | $30.53 | $75.00 |
| 0190 | Bituminous treatment A (401A000) | SY | 20,175 | $1.00 | $1.23 | $1.04 | $2.15 |
| 0200 | Tack coat (405A000) | GAL | 6,802 | $3.10 | $4.11 | $3.47 | $6.25 |
| 0210 | Micro-milling existing pavement (approximately 0.00" thru 1.00" thick) (408B000) | SY | 14,545 | $0.70 | $0.77 | $1.62 | $2.00 |
| 0220 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 11,920 | $1.50 | $0.33 | $2.55 | $3.75 |
| 0230 | Material remixing device (410H000) | EACH | 1 | $55,000 | $54,875 | $50,000 | $46,845 |
| 0240 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 3,040 | $88.00 | $107.71 | $107.00 | $105.50 |
| 0250 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B650) | TON | 1,876 | $82.00 | $107.50 | $99.00 | $102.50 |
| 0260 | Superpave bituminous concrete upper binder layer, leveling, 3/4" maximum aggregate size mix, esal range C/D (424B658) | TON | 3,204 | $78.00 | $103.60 | $97.00 | $102.75 |
| 0270 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 6,307 | $67.00 | $100.42 | $95.00 | $95.75 |
| 0280 | Superpave bituminous concrete lower binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B685) | TON | 150 | $150.00 | $232.10 | $190.00 | $173.25 |
| 0290 | Aggregate surfacing (1" down, crusher run) (430B043) | TON | 238 | $43.00 | $37.37 | $82.04 | $100.00 |
| 0300 | 18" roadway pipe (class 3 R.C.) (extension) (530A101) | LF | 9 | $160.00 | $122.49 | $218.29 | $200.00 |
| 0310 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 4,350 | $86.00 | $72.28 | $83.73 | $125.00 |
| 0320 | 24" storm sewer pipe (class 3 R.C.) (533A099) | LF | 2,171 | $110.00 | $89.66 | $95.61 | $135.00 |
| 0330 | 30" storm sewer pipe (class 3 R.C.) (533A100) | LF | 208 | $140.00 | $147.32 | $119.37 | $150.00 |
| 0340 | 36" storm sewer pipe (class 3 R.C.) (533A101) | LF | 50 | $200.00 | $177.38 | $153.58 | $175.00 |
| 0350 | 42" storm sewer pipe (class 3 R.C.) (533A102) | LF | 50 | $240.00 | $213.48 | $202.53 | $195.00 |
| 0360 | 18" storm sewer pipe (class 3 R.C.) (extension) (533A348) | LF | 2 | $280.00 | $402.67 | $314.42 | $750.00 |
| 0370 | 24" storm sewer pipe (class 3 R.C.) (extension) (533A349) | LF | 154 | $110.00 | $94.72 | $114.15 | $135.00 |
| 0380 | 18" side drain pipe (class 3 R.C.) (535A080) | LF | 385 | $75.00 | $74.43 | $77.72 | $125.00 |
| 0390 | 24" side drain pipe (class 3 R.C.) (535A085) | LF | 208 | $95.00 | $92.73 | $93.63 | $135.00 |
| 0400 | Mobilization (600A000) | LS | 1 | $432,415 | $522,601 | $387,900 | $319,085 |
| 0410 | Furnishing base, soil and structure laboratories (601A000) | EACH | 1 | $42,000 | $48,818 | $38,000 | $40,000 |
| 0420 | Right of way markers (602A000) | EACH | 4 | $1,300.00 | $775.95 | $1,776.71 | $1,000.00 |
| 0430 | Loose riprap, class 2 (610C001) | TON | 86 | $38.00 | $57.21 | $70.48 | $150.00 |
| 0440 | Filter blanket, geotextile (610D003) | SY | 718 | $6.30 | $3.76 | $2.64 | $8.00 |
| 0450 | Slope paving (614A000) | CY | 52 | $610.00 | $607.90 | $593.30 | $800.00 |
| 0460 | Concrete sidewalk, 4" thick (618A000) | SY | 1,708 | $65.00 | $75.16 | $73.35 | $110.00 |
| 0470 | Concrete driveway, 6" thick (618B002) | SY | 792 | $89.00 | $97.26 | $94.93 | $125.00 |
| 0480 | Detectable warning surface (618C001) | SF | 30 | $28.00 | $44.22 | $43.15 | $60.00 |
| 0490 | Curb ramp (618D000) | SY | 131 | $290.00 | $193.42 | $188.78 | $400.00 |
| 0500 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 3 | $1,400.00 | $939.48 | $916.91 | $1,500.00 |
| 0510 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 2 | $1,600.00 | $994.74 | $970.85 | $2,500.00 |
| 0520 | 30" roadway pipe end treatment, class 1 (619A004) | EACH | 2 | $1,800.00 | $1,050.00 | $1,024.79 | $3,000.00 |
| 0530 | 36" roadway pipe end treatment, class 1 (619A005) | EACH | 1 | $2,300.00 | $1,105.26 | $1,078.72 | $3,500.00 |
| 0540 | 42" roadway pipe end treatment, class 1 (619A006) | EACH | 1 | $2,900.00 | $1,160.52 | $1,132.66 | $4,500.00 |
| 0550 | 18" side drain pipe end treatment, class 1 (619A101) | EACH | 18 | $1,400.00 | $1,105.26 | $1,078.72 | $1,500.00 |
| 0560 | 24" side drain pipe end treatment, class 1 (619A102) | EACH | 8 | $1,600.00 | $1,215.79 | $1,186.59 | $2,500.00 |
| 0570 | Minor structure concrete (620A000) | CY | 3 | $1,100.00 | $1,657.90 | $1,618.08 | $1,500.00 |
| 0580 | Junction boxes, type 1 or 1P (621A011) | EACH | 10 | $4,700.00 | $3,868.42 | $3,775.53 | $6,500.00 |
| 0590 | Junction boxes, type partial (621A057) | EACH | 2 | $4,700.00 | $3,916.81 | $3,236.17 | $6,500.00 |
| 0600 | Junction box units, type 1 or 1P (621B011) | EACH | 14 | $690.00 | $1,326.32 | $1,294.47 | $1,000.00 |
| 0610 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 44 | $6,500.00 | $5,353.65 | $4,846.75 | $6,500.00 |
| 0620 | Inlets, type S1 or S3 (2 wing) (621C017) | EACH | 4 | $6,900.00 | $5,906.28 | $5,386.11 | $7,500.00 |
| 0630 | Inlets, type Y (621C020) | EACH | 1 | $9,100.00 | $5,724.32 | $5,414.85 | $7,500.00 |
| 0640 | Inlets, type C (621C027) | EACH | 1 | $7,200.00 | $5,000.87 | $4,683.26 | $7,500.00 |
| 0650 | Inlets, type S3 (1 wing) (modified) (621C071) | EACH | 5 | $6,900.00 | $7,232.60 | $6,680.58 | $7,500.00 |
| 0660 | Inlets, type PD (621C109) | EACH | 1 | $9,800.00 | $8,233.71 | $7,459.89 | $10,000 |
| 0670 | Inlet units, type S1 or S3 (621D015) | EACH | 33 | $720.00 | $1,105.16 | $1,078.72 | $800.00 |
| 0680 | Inlet units, type S3 (modified) (621D053) | EACH | 5 | $740.00 | $1,326.32 | $1,294.47 | $1,500.00 |
| 0690 | Stilling basins, type 1 (621I001) | EACH | 1 | $15,000 | $10,500 | $10,248 | $25,000 |
| 0700 | Concrete gutter (623A000) | LF | 1,943 | $37.00 | $48.09 | $93.85 | $60.00 |
| 0710 | Combination curb & gutter, type C (623C000) | LF | 7,782 | $25.00 | $24.05 | $38.29 | $30.00 |
| 0720 | Steel beam guardrail, class A, type 2 (630A001) | LF | 238 | $30.00 | $33.55 | $41.62 | $39.00 |
| 0730 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 1 | $4,000.00 | $4,247.25 | $3,101.32 | $4,900.00 |
| 0740 | Steel beam guardrail for culvert, class A, type 2, case 1 (630G001) | LF | 13 | $280.00 | $279.30 | $49.62 | $318.00 |
| 0750 | Topsoil (650A000) | CY | 2,557 | $32.00 | $25.38 | $34.00 | $50.00 |
| 0760 | Solid sodding (bermuda) (654A001) | SY | 23,404 | $7.00 | $5.76 | $6.67 | $20.50 |
| 0770 | Erosion control product, type C8 (659C007) | SY | 7,230 | $5.00 | $3.71 | $8.54 | $9.50 |
| 0780 | Temporary seeding (665A000) | ACRE | 10 | $1,700.00 | $1,089.11 | $1,548.50 | $1,016.00 |
| 0790 | Temporary mulching (665B001) | TON | 90 | $470.00 | $537.40 | $587.36 | $762.00 |
| 0800 | Temporary pipe (665C010) | LF | 200 | $82.00 | $59.20 | $64.49 | $125.00 |
| 0810 | Temporary pipe end treatment (665D001) | EACH | 2 | $1,600.00 | $1,262.14 | $1,647.97 | $2,500.00 |
| 0820 | Polyethylene (665E000) | SY | 500 | $3.00 | $6.58 | $10.68 | $5.00 |
| 0830 | Hay bales (665F000) | EACH | 250 | $11.00 | $15.70 | $12.82 | $15.25 |
| 0840 | Sand bags (665G000) | EACH | 730 | $6.00 | $11.38 | $16.02 | $7.75 |
| 0850 | Temporary riprap, class 2 (665I000) | TON | 60 | $42.00 | $55.54 | $94.34 | $150.00 |
| 0860 | Silt fence (665J002) | LF | 1,595 | $4.50 | $5.44 | $3.42 | $6.00 |
| 0870 | Drainage sump excavation (665K000) | CY | 80 | $36.00 | $14.38 | $110.20 | $200.00 |
| 0880 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 75 | $37.00 | $44.40 | $54.22 | $110.00 |
| 0890 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 20 | $43.00 | $37.41 | $127.45 | $125.00 |
| 0900 | Silt fence removal (665O001) | LF | 1,595 | $2.60 | $2.48 | $1.33 | $1.75 |
| 0910 | Inlet protection, stage 3 or 4 (665P005) | EACH | 20 | $630.00 | $322.73 | $213.59 | $700.00 |
| 0920 | Wattle (665Q002) | LF | 4,784 | $7.00 | $8.84 | $5.34 | $9.25 |
| 0930 | Temporary earth berms (665T000) | LF | 750 | $6.00 | $3.58 | $18.19 | $15.00 |
| 0940 | Pest control treatment (666A001) | ACRE | 10 | $280.00 | $63.27 | $533.97 | $254.00 |
| 0950 | Flocculant application, ditch check (672C100) | EACH | 15 | $33.00 | $375.64 | $320.38 | $26.00 |
| 0960 | Flocculant application, temporary slope drain (672C101) | EACH | 3 | $280.00 | $607.51 | $320.38 | $26.00 |
| 0970 | Construction safety fence (674A000) | LF | 1,000 | $4.50 | $3.29 | $5.34 | $5.00 |
| 0980 | Geometric controls (680A001) | LS | 1 | $60,000 | $41,866 | $160,000 | $152,642 |
| 0990 | Construction fuel (maximum bid limited to $ 283,000.00) (698A000) | LS | 1 | $0.00 | $0.01 | $0.00 | $0.00 |
| 1000 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 3 | $4,200.00 | $4,579.79 | $4,422.76 | $5,207.00 |
| 1010 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 3 | $4,400.00 | $4,579.26 | $4,422.76 | $5,207.00 |
| 1020 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 2 | $2,500.00 | $2,373.69 | $2,292.29 | $2,700.00 |
| 1030 | Broken yellow, class 2, type A traffic stripe (5" wide) (701A244) | MI | 2 | $2,500.00 | $2,373.69 | $2,292.29 | $2,700.00 |
| 1040 | Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063) | LF | 1,250 | $3.50 | $3.36 | $3.24 | $4.00 |
| 1050 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 293 | $1.70 | $1.69 | $1.62 | $2.00 |
| 1060 | Broken temporary traffic stripe (701C000) | MI | 7 | $1,000.00 | $1,005.32 | $970.85 | $1,143.00 |
| 1070 | Solid temporary traffic stripe (701C001) | MI | 18 | $1,000.00 | $1,005.32 | $1,024.79 | $1,206.00 |
| 1080 | Dotted temporary traffic stripe (701F000) | LF | 1,661 | $0.20 | $0.21 | $0.19 | $0.25 |
| 1090 | Dotted temporary traffic stripe (lane drop) (701F010) | LF | 2,500 | $0.20 | $0.21 | $0.19 | $0.25 |
| 1100 | Traffic control markings, class 2, type A (703A002) | SF | 1,966 | $5.50 | $5.59 | $5.39 | $6.50 |
| 1110 | Traffic control legends, class 2, type A (703B002) | SF | 269 | $6.50 | $6.70 | $6.47 | $7.75 |
| 1120 | Temporary traffic control markings (703D001) | SF | 3,932 | $2.00 | $2.24 | $2.16 | $2.55 |
| 1130 | Pavement markers, class C, type 1- A (705A011) | EACH | 379 | $5.50 | $5.59 | $5.39 | $6.35 |
| 1140 | Pavement markers, class C, type 1- B (705A012) | EACH | 285 | $5.50 | $5.59 | $5.39 | $6.35 |
| 1150 | Pavement markers, class C, type 2- C (705A022) | EACH | 48 | $5.25 | $5.59 | $5.39 | $6.35 |
| 1160 | Pavement markers, class C, type 2- D (705A023) | EACH | 262 | $5.50 | $5.59 | $5.39 | $6.35 |
| 1170 | Pavement markers, class C, type 2- E (705A024) | EACH | 45 | $5.00 | $5.59 | $5.39 | $6.35 |
| 1180 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 270 | $6.00 | $5.59 | $5.39 | $6.35 |
| 1190 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 234 | $6.00 | $5.59 | $5.39 | $6.35 |
| 1200 | Milepost, type B (709A001) | EACH | 1 | $170.00 | $165.90 | $400.48 | $500.00 |
| 1210 | Milepost reset (709B000) | EACH | 1 | $56.00 | $55.28 | $160.19 | $250.00 |
| 1220 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 22 | $22.00 | $22.11 | $26.16 | $25.50 |
| 1230 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 56 | $21.00 | $21.00 | $19.76 | $24.25 |
| 1240 | Construction signs (740B000) | SF | 990 | $6.20 | $6.67 | $6.41 | $7.75 |
| 1250 | Channelizing drums (740D000) | EACH | 370 | $28.00 | $28.88 | $51.26 | $50.00 |
| 1260 | Cones (36 inches high) (740E000) | EACH | 50 | $12.00 | $44.29 | $10.15 | $50.00 |
| 1270 | Barricades, type III (740F002) | EACH | 7 | $240.00 | $237.83 | $213.59 | $275.00 |
| 1280 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $3,500.00 | $3,596.25 | $2,669.84 | $4,128.00 |
| 1290 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $8,600.00 | $8,678.25 | $4,645.52 | $9,970.00 |
| 1300 | Trainee hours at 80 cents per hour (999 000) | HR | 1,240 | $0.80 | $0.80 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of January 30, 2026. Compiled by Mirage Metrics.