Rogers Group, Inc.: ALDOT bid record
Rogers Group, Inc. submitted 141 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 28 AUG 2026, and was the low bidder on 75 of them (53%). When it was not low, its total sat a median +5.0% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $228,493,921
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 23 | 11 | 48% |
| 2023 | 25 | 15 | 60% |
| 2024 | 31 | 18 | 58% |
| 2025 | 36 | 18 | 50% |
| 2026 | 26 | 13 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0201 | 26 | 14 | 54% |
| 0204 | 23 | 9 | 39% |
| 0202 | 22 | 13 | 59% |
| 0102 | 20 | 16 | 80% |
| 0103 | 19 | 10 | 53% |
| 0104 | 12 | 6 | 50% |
| 1009 | 11 | 4 | 36% |
| 0302 | 4 | 1 | 25% |
| 0103, 0105 | 1 | 0 | 0% |
| 0201, 0204 | 1 | 1 | 100% |
| 0105 | 1 | 1 | 100% |
| 1001 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Tack coat | 405A000 | GAL | 134 | 110 (82%) | $3.40 | $4.55 |
| Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) | 408B001 | SY | 122 | 78 (64%) | $1.00 | $2.07 |
| Traffic control markings, class 2, type A | 703A002 | SF | 133 | 77 (58%) | $6.00 | $6.00 |
| Construction signs | 740B000 | SF | 141 | 76 (54%) | $6.30 | $7.00 |
| Solid temporary traffic stripe | 701C001 | MI | 125 | 71 (57%) | $1,150.00 | $1,064.57 |
| Temporary traffic control markings | 703D001 | SF | 118 | 69 (58%) | $2.50 | $2.35 |
| Channelizing drums | 740D000 | EACH | 126 | 67 (53%) | $25.00 | $33.00 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 121 | 67 (55%) | $4,275.00 | $4,427.98 |
| Solid yellow, class 2, type A traffic stripe (5" wide) | 701A230 | MI | 119 | 65 (55%) | $4,225.00 | $4,432.31 |
| Broken temporary traffic stripe | 701C000 | MI | 117 | 65 (56%) | $1,050.00 | $1,000.00 |
| Pavement markers, class A-H, type 2-C | 705A030 | EACH | 115 | 65 (57%) | $6.00 | $6.00 |
| Cones (36 inches high) | 740E000 | EACH | 103 | 65 (63%) | $6.05 | $20.47 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 97 | 20 of 97 |
| Grayson Carter & Son Contracting, Inc. | 74 | 26 of 74 |
| Apac-Alabama, Inc. | 35 | 1 of 35 |
| Midsouth Paving, Inc. | 23 | 6 of 23 |
| Vulcan Materials Asphalt and Construction, | 23 | 4 of 23 |
| Whitaker Contracting Corporation | 14 | 7 of 14 |
| S J & L General Contractor, LLC | 9 | 3 of 9 |
| MLMD, LLC | 8 | 1 of 8 |
| Gillespie Construction, LLC | 8 | 1 of 8 |
| Alabama Grading & Excavation, LLC. | 8 | 0 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828030 | 0202 | ROADWAY IMPROVEMENTS/REALIGNMENT (GRADING, DRAINING, PAVEMENT, TRAFFIC SIGNS, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-3 (US-31) AT SPARKM | 1 of 8 | $1,167,500 | Low, 5.0% under the second |
| 31 JUL 2026 | 20260731003 | 0202 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-84 (FOREST SERVICE ROAD 265) FROM THE JUNCTION OF CR-76 TO THE JUNCTION OF CR- | 1 of 3 | $819,000 | Low, 10% under the second |
| 26 JUN 2026 | 20260626011 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-35 FROM THE INTERSECTION OF MEDICAL CENTER DRIVE TO THE INTERSE | 2 of 3 | $3,792,650 | +19% |
| 26 JUN 2026 | 20260626016 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-68 FROM THE NORTHWEST CITY LIMITS OF COLLINSVILLE (MP 17.610) T | 2 of 4 | $1,053,000 | +6.0% |
| 26 JUN 2026 | 20260626017 | 0204 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-127 FROM THE INTERSECTION OF SR-99 IN ATHENS TO THE JUNCTION OF MAPLES CIRCLE (MP 4.590 | 2 of 3 | $1,013,398 | +3.0% |
| 26 JUN 2026 | 20260626020 | 0302 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE I-65 | 2 of 4 | $3,269,000 | +2.0% |
| 29 MAY 2026 | 20260529021 | 0204 | MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL IMPROVEMENTS (INSTALL AND BLOCKOUT REPLACEMENT), AND STRIPE ON SR-3 (US-31) FROM | 1 of 3 | $2,869,950 | Low, 2.0% under the second |
| 29 MAY 2026 | 20260529031 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-168 FROM THE MARSHALL COUNTY LINE (MP 15.110) TO THE JUNCTION OF SR-68 EAST OF ALBERTVI | 2 of 5 | $559,950 | +6.0% |
| 24 APR 2026 | 20260424012 | 0204 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-67 FROM THE JUNCTION OF THE SR-24 INTERCHANGE TO THE JUNCTION O | 1 of 3 | $1,010,000 | Low, 17% under the second |
| 24 APR 2026 | 20260424029 | 1009 | MICRO-MILLING, RESURFACE (SCRUB SEAL), TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENTS AND SIGNAL DETECTION), AND STRIPE ON SR-171 FROM THE | 2 of 2 | $2,653,965 | +8.0% |
| 24 APR 2026 | 20260424041 | 0204 | ROADWAY IMPROVEMENTS (RECONSTRUCTION) ON CHURCH STREET FROM THE JUNCTION OF SR-3 (US-31/6TH AVENUE) TO THE INTERSECTION OF SOMERVILLE ROAD I | 1 of 3 | $669,215 | Low, 24% under the second |
| 27 MAR 2026 | 20260327008 | 0102 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF COUNTRY CLUB AVENUE NORTHWEST T | 2 of 4 | $2,035,000 | +3.0% |
| 27 MAR 2026 | 20260327011 | 0204 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-67 FROM THE INTERSECTION OF INDIAN HILLS ROAD TO THE INTERSECTION OF SR-3 (US-31) IN DE | 2 of 3 | $1,353,970 | +5.0% |
| 27 MAR 2026 | 20260327014 | 0302 | MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-53 (US-231) FROM THE JUNCTION OF SR-79 TO THE JUNC | 2 of 4 | $2,302,000 | +11% |
| 27 MAR 2026 | 20260327021 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-75 FROM A POINT 0.470 MILE SOUTH OF THE JUNCTION OF CR-326/CR- 41 TO THE JUNCTION OF 7T | 1 of 4 | $1,371,700 | Low, 1.0% under the second |
| 27 MAR 2026 | 20260327023 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-117 FROM THE INTERSECTION OF SR-75 IN IDER TO THE INTERSECTION OF SR-71 IN FLAT ROCK | 1 of 3 | $1,656,000 | Low, 6.0% under the second |
| 27 FEB 2026 | 20260227021 | 0202 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-24 FROM THE INTERSECTION OF CR-83 EAST OF RUSSELLVILLE TO THE L | 1 of 2 | $2,937,211 | Low, 5.0% under the second |
| 27 FEB 2026 | 20260227030 | 0104 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-75 FROM THE JUNCTION OF GARY ROAD TO THE INTERSECTION OF CR-198 | 2 of 4 | $1,449,650 | +8.0% |
| 30 JAN 2026 | 20260130001 | 0105 | BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE G | 1 of 6 | $4,881,200 | Low, 13% under the second |
| 30 JAN 2026 | 20260130022 | 0104 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF MILLER ROAD IN ALBERTVILLE TO T | 1 of 4 | $2,967,000 | Low, 23% under the second |
| 30 JAN 2026 | 20260130023 | 0201 | PLANING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) FROM A POINT 0.470 MILE EAST OF CANE CREEK (MP 16.240) TO THE JUNCTI | 1 of 3 | $1,423,000 | Low, 8.0% under the second |
| 30 JAN 2026 | 20260130025 | 0102 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES AND RESURFACING ON SR-53 FROM THE JUNCTION OF CR-19 (JEFF ROAD) TO THE INTERSECTION OF CR-108 (HARVEST | 1 of 4 | $5,265,450 | Low, 4.0% under the second |
| 30 JAN 2026 | 20260130026 | 0204 | MICRO-MILL, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-67 FROM A POINT 0.380 MILE SOUTH OF THE JUNCTION OF PINES ROAD TO THE INTE | 2 of 3 | $1,054,000 | +5.0% |
| 30 JAN 2026 | 20260130033 | 0102 | SAFETY WIDENING, MICRO-MILLING, RESURFACE, AND STRIPE ON SR-2 (US-72) FROM THE I-565 INTERCHANGE (MP 100.284) TO THE INTERSECTION OF MOORES | 1 of 4 | $942,750 | Low, 14% under the second |
| 30 JAN 2026 | 20260130049 | 0201 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-64 FROM THE INTERSECTION OF SR-101 IN LEXINGTON TO THE JUNCTION OF SR-207 | 2 of 3 | $1,667,527 | +17% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.