Rogers Group, Inc.: ALDOT bid record

Rogers Group, Inc. submitted 141 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 28 AUG 2026, and was the low bidder on 75 of them (53%). When it was not low, its total sat a median +5.0% above the low bid.

Owner
Alabama DOT
Low bid volume
$228,493,921
Latest bid
28 AUG 2026
Data through
28 AUG 2026
141Bids
75Low bids
53Win rate, percent
+5.0%Median gap to the low bid when not low, 66 bids

By year

YearBidsLow bidsWin rate
2022231148%
2023251560%
2024311858%
2025361850%
2026261350%
Rogers Group, Inc., ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
0201261454%
020423939%
0202221359%
0102201680%
0103191053%
010412650%
100911436%
03024125%
0103, 0105100%
0201, 020411100%
010511100%
1001100%
Rogers Group, Inc., ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Tack coat405A000GAL134110 (82%)$3.40$4.55
Micro-milling existing pavement (approximately 1.10" thru 2.00" thick)408B001SY12278 (64%)$1.00$2.07
Traffic control markings, class 2, type A703A002SF13377 (58%)$6.00$6.00
Construction signs740B000SF14176 (54%)$6.30$7.00
Solid temporary traffic stripe701C001MI12571 (57%)$1,150.00$1,064.57
Temporary traffic control markings703D001SF11869 (58%)$2.50$2.35
Channelizing drums740D000EACH12667 (53%)$25.00$33.00
Solid white, class 2, type A traffic stripe (5" wide)701A227MI12167 (55%)$4,275.00$4,427.98
Solid yellow, class 2, type A traffic stripe (5" wide)701A230MI11965 (55%)$4,225.00$4,432.31
Broken temporary traffic stripe701C000MI11765 (56%)$1,050.00$1,000.00
Pavement markers, class A-H, type 2-C705A030EACH11565 (57%)$6.00$6.00
Cones (36 inches high)740E000EACH10365 (63%)$6.05$20.47
Rogers Group, Inc., ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Rogers Group, Inc., ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 AUG 2026202608280300202ROADWAY IMPROVEMENTS/REALIGNMENT (GRADING, DRAINING, PAVEMENT, TRAFFIC SIGNS, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-3 (US-31) AT SPARKM1 of 8$1,167,500Low, 5.0% under the second
31 JUL 2026202607310030202RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-84 (FOREST SERVICE ROAD 265) FROM THE JUNCTION OF CR-76 TO THE JUNCTION OF CR-1 of 3$819,000Low, 10% under the second
26 JUN 2026202606260110103MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-35 FROM THE INTERSECTION OF MEDICAL CENTER DRIVE TO THE INTERSE2 of 3$3,792,650+19%
26 JUN 2026202606260160103MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-68 FROM THE NORTHWEST CITY LIMITS OF COLLINSVILLE (MP 17.610) T2 of 4$1,053,000+6.0%
26 JUN 2026202606260170204MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-127 FROM THE INTERSECTION OF SR-99 IN ATHENS TO THE JUNCTION OF MAPLES CIRCLE (MP 4.5902 of 3$1,013,398+3.0%
26 JUN 2026202606260200302MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE I-652 of 4$3,269,000+2.0%
29 MAY 2026202605290210204MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL IMPROVEMENTS (INSTALL AND BLOCKOUT REPLACEMENT), AND STRIPE ON SR-3 (US-31) FROM1 of 3$2,869,950Low, 2.0% under the second
29 MAY 2026202605290310103MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-168 FROM THE MARSHALL COUNTY LINE (MP 15.110) TO THE JUNCTION OF SR-68 EAST OF ALBERTVI2 of 5$559,950+6.0%
24 APR 2026202604240120204MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-67 FROM THE JUNCTION OF THE SR-24 INTERCHANGE TO THE JUNCTION O1 of 3$1,010,000Low, 17% under the second
24 APR 2026202604240291009MICRO-MILLING, RESURFACE (SCRUB SEAL), TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENTS AND SIGNAL DETECTION), AND STRIPE ON SR-171 FROM THE 2 of 2$2,653,965+8.0%
24 APR 2026202604240410204ROADWAY IMPROVEMENTS (RECONSTRUCTION) ON CHURCH STREET FROM THE JUNCTION OF SR-3 (US-31/6TH AVENUE) TO THE INTERSECTION OF SOMERVILLE ROAD I1 of 3$669,215Low, 24% under the second
27 MAR 2026202603270080102MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF COUNTRY CLUB AVENUE NORTHWEST T2 of 4$2,035,000+3.0%
27 MAR 2026202603270110204MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-67 FROM THE INTERSECTION OF INDIAN HILLS ROAD TO THE INTERSECTION OF SR-3 (US-31) IN DE2 of 3$1,353,970+5.0%
27 MAR 2026202603270140302MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-53 (US-231) FROM THE JUNCTION OF SR-79 TO THE JUNC2 of 4$2,302,000+11%
27 MAR 2026202603270210103MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-75 FROM A POINT 0.470 MILE SOUTH OF THE JUNCTION OF CR-326/CR- 41 TO THE JUNCTION OF 7T1 of 4$1,371,700Low, 1.0% under the second
27 MAR 2026202603270230103MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-117 FROM THE INTERSECTION OF SR-75 IN IDER TO THE INTERSECTION OF SR-71 IN FLAT ROCK1 of 3$1,656,000Low, 6.0% under the second
27 FEB 2026202602270210202MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-24 FROM THE INTERSECTION OF CR-83 EAST OF RUSSELLVILLE TO THE L1 of 2$2,937,211Low, 5.0% under the second
27 FEB 2026202602270300104MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-75 FROM THE JUNCTION OF GARY ROAD TO THE INTERSECTION OF CR-1982 of 4$1,449,650+8.0%
30 JAN 2026202601300010105BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE G1 of 6$4,881,200Low, 13% under the second
30 JAN 2026202601300220104MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF MILLER ROAD IN ALBERTVILLE TO T1 of 4$2,967,000Low, 23% under the second
30 JAN 2026202601300230201PLANING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) FROM A POINT 0.470 MILE EAST OF CANE CREEK (MP 16.240) TO THE JUNCTI1 of 3$1,423,000Low, 8.0% under the second
30 JAN 2026202601300250102ROADWAY IMPROVEMENTS/ADDITIONAL LANES AND RESURFACING ON SR-53 FROM THE JUNCTION OF CR-19 (JEFF ROAD) TO THE INTERSECTION OF CR-108 (HARVEST1 of 4$5,265,450Low, 4.0% under the second
30 JAN 2026202601300260204MICRO-MILL, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-67 FROM A POINT 0.380 MILE SOUTH OF THE JUNCTION OF PINES ROAD TO THE INTE2 of 3$1,054,000+5.0%
30 JAN 2026202601300330102SAFETY WIDENING, MICRO-MILLING, RESURFACE, AND STRIPE ON SR-2 (US-72) FROM THE I-565 INTERCHANGE (MP 100.284) TO THE INTERSECTION OF MOORES 1 of 4$942,750Low, 14% under the second
30 JAN 2026202601300490201RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-64 FROM THE INTERSECTION OF SR-101 IN LEXINGTON TO THE JUNCTION OF SR-2072 of 3$1,667,527+17%
Rogers Group, Inc.: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy