Alabama Grading & Excavation, LLC.: ALDOT bid record

Alabama Grading & Excavation, LLC. submitted 34 bids on Alabama DOT contracts in the data, from 04 NOV 2022 to 31 JUL 2026, and was the low bidder on 9 of them (26%). When it was not low, its total sat a median +26% above the low bid.

Owner
Alabama DOT
Low bid volume
$16,331,636
Latest bid
31 JUL 2026
Data through
28 AUG 2026
34Bids
9Low bids
26Win rate, percent
+26%Median gap to the low bid when not low, 25 bids

By year

YearBidsLow bidsWin rate
20222150%
20233133%
20248338%
2025600%
202615427%
Alabama Grading & Excavation, LLC., ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
010510330%
0103700%
03026233%
040244100%
0404300%
0104200%
0301100%
0401100%
Alabama Grading & Excavation, LLC., ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Dotted, class 2, type A traffic stripe (5" wide)701B207LF2616 (62%)$2.05$2.15
Traffic control markings, class 2, type A703A002SF3213 (41%)$6.25$6.00
Solid white, class 2, type A traffic stripe (5" wide)701A227MI2712 (44%)$4,870.00$4,427.98
Solid yellow, class 2, type A traffic stripe (5" wide)701A230MI2612 (46%)$4,687.25$4,432.31
Broken yellow, class 2, type A traffic stripe (5" wide)701A244MI1611 (69%)$1,630.65$2,421.00
Traffic control legends, class 2, type A703B002SF2610 (38%)$7.57$6.53
Broken white, class 2, type A traffic stripe (5" wide)701A239MI1210 (83%)$1,801.25$2,537.02
Pavement markers, class A-H, type 2-D705A037EACH319 (29%)$7.24$6.05
Construction signs740B000SF347 (21%)$7.54$7.00
Channelizing drums740D000EACH297 (24%)$42.28$33.00
Micro-milling existing pavement (approximately 1.10" thru 2.00" thick)408B001SY217 (33%)$2.50$2.07
Crushed aggregate base course, type B, plant mixed, 6" compacted thickness301A012SY117 (64%)$18.00$21.77
Alabama Grading & Excavation, LLC., ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Alabama Grading & Excavation, LLC., ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 2026202607310110105SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE CALHOUN COUNTY LINE TO THE INTERSECTION OF BANKS S2 of 3$6,692,040+17%
31 JUL 2026202607310170402ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION 1 of 4$8,240,555Low, 8.0% under the second
31 JUL 2026202607310220105ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET3 of 5$2,341,981+9.0%
26 JUN 2026202606260110103MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-35 FROM THE INTERSECTION OF MEDICAL CENTER DRIVE TO THE INTERSE3 of 3$4,169,428+30%
26 JUN 2026202606260160103MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-68 FROM THE NORTHWEST CITY LIMITS OF COLLINSVILLE (MP 17.610) T3 of 4$1,237,226+25%
29 MAY 2026202605290190402MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF MAXWELLBORN ROAD TO THE JUNCTION OF MEMORIAL DRIVE1 of 3$1,314,282Low, 6.0% under the second
29 MAY 2026202605290310103MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-168 FROM THE MARSHALL COUNTY LINE (MP 15.110) TO THE JUNCTION OF SR-68 EAST OF ALBERTVI3 of 5$748,418+42%
29 MAY 2026202605290370402RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON OLD GADSDEN HIGHWAY FROM THE JUNCTION OF SR-1 (US-431) TO THE INTERSECTION OF SHAW STREET IN 1 of 3$736,037Low, 2.0% under the second
24 APR 2026202604240200105MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-283 FROM THE JUNCTION OF SR-25 (US-411) TO THE JUNCTION OF SR-9 IN CENTRE3 of 3$951,109+31%
24 APR 2026202604240230302RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-25 (US-411) FROM THE JUNCTION OF MADDOX FARM ROAD IN ODENVILLE TO4 of 5$3,322,361+26%
24 APR 2026202604240270302SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-25 (US-231) FROM THE JUNCTION OF THE US-231/US-431 ROUNDA3 of 4$2,216,023+25%
27 MAR 2026202603270210103MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-75 FROM A POINT 0.470 MILE SOUTH OF THE JUNCTION OF CR-326/CR- 41 TO THE JUNCTION OF 7T4 of 4$1,779,952+30%
27 MAR 2026202603270230103MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-117 FROM THE INTERSECTION OF SR-75 IN IDER TO THE INTERSECTION OF SR-71 IN FLAT ROCK3 of 3$2,089,602+26%
27 MAR 2026202603270280404MICRO-MILLING, RESURFACE, GUARDRAIL, LANE REDUCTION, TURN LANE, AND STRIPE, TO INCLUDE GRADING, DRAINAGE, AND PAVEMENT ON SR-46 FROM THE JUN2 of 3$4,427,163+12%
30 JAN 2026202601300640105RESURFACING, SIDEWALK IMPROVEMENTS, AND TRAFFIC STRIPE ON WALNUT STREET FROM SOUTH 8TH STREET TO SOUTH 5TH STREET IN GADSDEN.1 of 7$852,496Low, 40% under the second
25 APR 2025202504250120103MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-35 FROM THE INTERSECTION OF STAR ROAD TO THE JUNCTION OF DEERMAN AVENUE IN R3 of 3$3,305,202+28%
28 FEB 2025202502280180404RESURFACING (SCRUB SEAL), END ANCHOR INSTALL, AND STRIPE ON SR-1 (US-431) FROM SOUTH OF BUFORD ADAMSON ROAD AND ON SR-48 FROM CR-1 TO SR-1 (3 of 3$3,941,184+27%
28 FEB 2025202502280400105WIDENING, RESURFACING, AND TRAFFIC STRIPE ON BLACK CREEK PARKWAY FROM THE JUNCTION OF WILLIS CREEK ROAD TO THE JUNCTION OF 11TH STREET IN GA2 of 3$933,061+15%
28 FEB 2025202502280440105RESURFACING AND TRAFFIC SIGNAL INSTALLATIONS ON CHURCH STREET FROM THE JUNCTION OF SR-77 TO THE JUNCTION OF SR- 25 (US-411) AND AT VARIOUS L3 of 3$1,390,336+29%
31 JAN 2025202501310050401BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, & RETAINING WALL) ON SR-63 OVER SUGAR CREEK IN ALEXANDER CITY2 of 2$10,084,683+1.0%
31 JAN 2025202501310570404ROADWAY IMPROVEMENTS (TURN LANE ADDITIONS) ON SR-9 AT THE PROPOSED ENTRANCE TO THE INDUSTRIAL PARK IN ASHLAND2 of 4$414,152+22%
06 DEC 2024202412060070301BRIDGE REPLACEMENT ON SR-23 AT A BRANCH OF LITTLE CANOE CREEK SOUTHEAST OF SPRINGVILLE2 of 4$4,159,477+5.0%
06 DEC 2024202412060620104INTERSECTION IMPROVEMENTS AND TRAFFIC SIGNAL UPGRADES ON SR-3 (US-31) AT SR-91 IN HANCEVILLE5 of 6$943,498+26%
06 DEC 2024202412060630104ACCESS MANAGEMENT, SIGNAL UPGRADES, & TURN LANE ADDITION ON SR-69 AT SUNSET DRIVE IN GUNTERSVILLE5 of 6$874,773+31%
08 NOV 2024202411080470105MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-291 FROM THE JUNCTION OF SR-759 TO THE INTERSECTION OF SR-1 (US-431)1 of 3$1,095,490Low, 2.0% under the second
Alabama Grading & Excavation, LLC.: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy