Alabama Grading & Excavation, LLC.: ALDOT bid record
Alabama Grading & Excavation, LLC. submitted 34 bids on Alabama DOT contracts in the data, from 04 NOV 2022 to 31 JUL 2026, and was the low bidder on 9 of them (26%). When it was not low, its total sat a median +26% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $16,331,636
- Latest bid
- 31 JUL 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 1 | 50% |
| 2023 | 3 | 1 | 33% |
| 2024 | 8 | 3 | 38% |
| 2025 | 6 | 0 | 0% |
| 2026 | 15 | 4 | 27% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0105 | 10 | 3 | 30% |
| 0103 | 7 | 0 | 0% |
| 0302 | 6 | 2 | 33% |
| 0402 | 4 | 4 | 100% |
| 0404 | 3 | 0 | 0% |
| 0104 | 2 | 0 | 0% |
| 0301 | 1 | 0 | 0% |
| 0401 | 1 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vulcan Materials Asphalt and Construction, | 27 | 13 of 27 |
| Wiregrass Construction Company, Inc. | 24 | 14 of 24 |
| Rogers Group, Inc. | 8 | 8 of 8 |
| Apac-Alabama, Inc. | 7 | 3 of 7 |
| McElhenney Construction Co., LLC | 6 | 0 of 6 |
| Whitaker Contracting Corporation | 3 | 3 of 3 |
| Dunn Construction Company, Inc. | 3 | 0 of 3 |
| CB&A Construction, LLC. | 3 | 1 of 3 |
| Grayson Carter & Son Contracting, Inc. | 3 | 3 of 3 |
| Gillespie Construction, LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 20260731011 | 0105 | SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE CALHOUN COUNTY LINE TO THE INTERSECTION OF BANKS S | 2 of 3 | $6,692,040 | +17% |
| 31 JUL 2026 | 20260731017 | 0402 | ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION | 1 of 4 | $8,240,555 | Low, 8.0% under the second |
| 31 JUL 2026 | 20260731022 | 0105 | ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET | 3 of 5 | $2,341,981 | +9.0% |
| 26 JUN 2026 | 20260626011 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-35 FROM THE INTERSECTION OF MEDICAL CENTER DRIVE TO THE INTERSE | 3 of 3 | $4,169,428 | +30% |
| 26 JUN 2026 | 20260626016 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-68 FROM THE NORTHWEST CITY LIMITS OF COLLINSVILLE (MP 17.610) T | 3 of 4 | $1,237,226 | +25% |
| 29 MAY 2026 | 20260529019 | 0402 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF MAXWELLBORN ROAD TO THE JUNCTION OF MEMORIAL DRIVE | 1 of 3 | $1,314,282 | Low, 6.0% under the second |
| 29 MAY 2026 | 20260529031 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-168 FROM THE MARSHALL COUNTY LINE (MP 15.110) TO THE JUNCTION OF SR-68 EAST OF ALBERTVI | 3 of 5 | $748,418 | +42% |
| 29 MAY 2026 | 20260529037 | 0402 | RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON OLD GADSDEN HIGHWAY FROM THE JUNCTION OF SR-1 (US-431) TO THE INTERSECTION OF SHAW STREET IN | 1 of 3 | $736,037 | Low, 2.0% under the second |
| 24 APR 2026 | 20260424020 | 0105 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-283 FROM THE JUNCTION OF SR-25 (US-411) TO THE JUNCTION OF SR-9 IN CENTRE | 3 of 3 | $951,109 | +31% |
| 24 APR 2026 | 20260424023 | 0302 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-25 (US-411) FROM THE JUNCTION OF MADDOX FARM ROAD IN ODENVILLE TO | 4 of 5 | $3,322,361 | +26% |
| 24 APR 2026 | 20260424027 | 0302 | SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-25 (US-231) FROM THE JUNCTION OF THE US-231/US-431 ROUNDA | 3 of 4 | $2,216,023 | +25% |
| 27 MAR 2026 | 20260327021 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-75 FROM A POINT 0.470 MILE SOUTH OF THE JUNCTION OF CR-326/CR- 41 TO THE JUNCTION OF 7T | 4 of 4 | $1,779,952 | +30% |
| 27 MAR 2026 | 20260327023 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-117 FROM THE INTERSECTION OF SR-75 IN IDER TO THE INTERSECTION OF SR-71 IN FLAT ROCK | 3 of 3 | $2,089,602 | +26% |
| 27 MAR 2026 | 20260327028 | 0404 | MICRO-MILLING, RESURFACE, GUARDRAIL, LANE REDUCTION, TURN LANE, AND STRIPE, TO INCLUDE GRADING, DRAINAGE, AND PAVEMENT ON SR-46 FROM THE JUN | 2 of 3 | $4,427,163 | +12% |
| 30 JAN 2026 | 20260130064 | 0105 | RESURFACING, SIDEWALK IMPROVEMENTS, AND TRAFFIC STRIPE ON WALNUT STREET FROM SOUTH 8TH STREET TO SOUTH 5TH STREET IN GADSDEN. | 1 of 7 | $852,496 | Low, 40% under the second |
| 25 APR 2025 | 20250425012 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-35 FROM THE INTERSECTION OF STAR ROAD TO THE JUNCTION OF DEERMAN AVENUE IN R | 3 of 3 | $3,305,202 | +28% |
| 28 FEB 2025 | 20250228018 | 0404 | RESURFACING (SCRUB SEAL), END ANCHOR INSTALL, AND STRIPE ON SR-1 (US-431) FROM SOUTH OF BUFORD ADAMSON ROAD AND ON SR-48 FROM CR-1 TO SR-1 ( | 3 of 3 | $3,941,184 | +27% |
| 28 FEB 2025 | 20250228040 | 0105 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON BLACK CREEK PARKWAY FROM THE JUNCTION OF WILLIS CREEK ROAD TO THE JUNCTION OF 11TH STREET IN GA | 2 of 3 | $933,061 | +15% |
| 28 FEB 2025 | 20250228044 | 0105 | RESURFACING AND TRAFFIC SIGNAL INSTALLATIONS ON CHURCH STREET FROM THE JUNCTION OF SR-77 TO THE JUNCTION OF SR- 25 (US-411) AND AT VARIOUS L | 3 of 3 | $1,390,336 | +29% |
| 31 JAN 2025 | 20250131005 | 0401 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, & RETAINING WALL) ON SR-63 OVER SUGAR CREEK IN ALEXANDER CITY | 2 of 2 | $10,084,683 | +1.0% |
| 31 JAN 2025 | 20250131057 | 0404 | ROADWAY IMPROVEMENTS (TURN LANE ADDITIONS) ON SR-9 AT THE PROPOSED ENTRANCE TO THE INDUSTRIAL PARK IN ASHLAND | 2 of 4 | $414,152 | +22% |
| 06 DEC 2024 | 20241206007 | 0301 | BRIDGE REPLACEMENT ON SR-23 AT A BRANCH OF LITTLE CANOE CREEK SOUTHEAST OF SPRINGVILLE | 2 of 4 | $4,159,477 | +5.0% |
| 06 DEC 2024 | 20241206062 | 0104 | INTERSECTION IMPROVEMENTS AND TRAFFIC SIGNAL UPGRADES ON SR-3 (US-31) AT SR-91 IN HANCEVILLE | 5 of 6 | $943,498 | +26% |
| 06 DEC 2024 | 20241206063 | 0104 | ACCESS MANAGEMENT, SIGNAL UPGRADES, & TURN LANE ADDITION ON SR-69 AT SUNSET DRIVE IN GUNTERSVILLE | 5 of 6 | $874,773 | +31% |
| 08 NOV 2024 | 20241108047 | 0105 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-291 FROM THE JUNCTION OF SR-759 TO THE INTERSECTION OF SR-1 (US-431) | 1 of 3 | $1,095,490 | Low, 2.0% under the second |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.