ALDOT letting results, January 31, 2025

29 contracts let by Alabama DOT on January 31, 2025, $246,079,903 in low bids, a median of 3 bidders per contract.

Owner
Alabama DOT
Contracts
29
Low bids, total
$246,079,903
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20250131001GRADE, DRAIN, PAVE, BRIDGE REMOVAL, AND BRIDGE REPLACEMENT ON I-65 FROM A POINT 0.560 MILE SOUTH OF BUCK CREEK TO A POINT 1.000 MILE NORTH OF THE SR-3 (US-31) I03052McInnis Construction, LLC$66,962,022$81,356,110+21%ALDOT
20250131018CONCRETE REPAIR, RESURFACING, AND ADDITIONAL LANES ON SR-38 (US-280) FROM THE JUNCTION OF ROSEDALE DRIVE IN HOMEWOOD TO THE CAHABA RIVER BRIDGE03013Apac-Alabama, Inc.$52,693,167$53,100,000+1.0%ALDOT
20250131006BRIDGE REHABILITATION AND CORROSION MITIGATION ON SR-193 (DAUPHIN ISLAND BRIDGE) FROM THE NORTHERN END OF THE BRIDGE TO THE SOUTHERN END09013Southern Road & Bridge, LLC$33,659,866$36,621,220+9.0%ALDOT
20250131009REPAIR AND REPLACEMENT OF ENTRANCE AND EXIT RAMPS ON I-20/I-59 AT MCASHAN DRIVE (EXIT 104) AND THE NORTHBOUND AND SOUTHBOUND RAMPS SOUTHWEST OF MCCALLA03012Carcel & G. Construction, LLC$17,795,261$19,500,000+10%ALDOT
20250131005BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, & RETAINING WALL) ON SR-63 OVER SUGAR CREEK IN ALEXANDER CITY04012CB&A Construction, LLC.$9,958,285$10,084,683+1.0%ALDOT
20250131004BRIDGE REPLACEMENT ON SR-6 (US-82) OVER BIG CREEK IN COKER05022Ikaros, LLC$9,900,000$11,983,641+21%ALDOT
20250131029MICRO-MILLING, RESURFACING (HIGH FRICTION SURFACE), & STRIPE ON SR-1 (US-431) FROM THE NORTH END OF THE TENNESSEE RIVER BRIDGE TO THE JUNCTION OF CATHEDRAL CAVE01044Vulcan Materials Asphalt and Construction,$6,833,919$6,841,6980.0%ALDOT
20250131032RESURFACE, TRAFFIC SIGNALS, WIM STATION, AND TRAFFIC STRIPE ON SR-5 FROM THE JEFFERSON COUNTY LINE TO A POINT 0.250 MILE WEST OF THE JUNCTION OF ROCKY RIDGE ROA10083Wiregrass Construction Company, Inc.$6,196,065$6,475,378+5.0%ALDOT
20250131040PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE PINEY CREEK WOODS BRIDGE TO A POINT 0.500 MILE SOUTH OF THE JUNCTION OF JULIAN TOWN ROAD06043Wiregrass Construction Company, Inc.$4,283,872$4,347,788+1.0%ALDOT
20250131044RESURFACING, TRAFFIC SIGNAL UPGRADES, AND TRAFFIC STRIPE ON SR-188 FROM A POINT NORTH OF THE JUNCTION OF FIELDS LANE (MP 8.364) TO THE JUNCTION OF SR-19309013H. O. Weaver & Sons, Inc.$3,929,737$3,958,578+1.0%ALDOT
20250131019MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-38 (US-280) FROM THE INTERSECTION OF CR-55 TO THE JUNCTION OF CR-6203053Apac-Alabama, Inc.$3,334,592$3,447,859+3.0%ALDOT
20250131003BRIDGE PAINTING ON SR-3 (US-31) AND THE I-20/I-59 INTERCHANGE AT VARIOUS LOCATIONS IN BIRMINGHAM AS INDICATED IN THE PLANS03019Seminole Equipment, Inc.$3,014,103$3,185,000+6.0%ALDOT
20250131014RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM LITTLE ESCAMBIA CREEK TO A POINT 0.500 MILE SOUTH OF THE JUNCTION OF CR-39 SOUTHWES09032H. O. Weaver & Sons, Inc.$2,950,940$3,019,739+2.0%ALDOT
20250131026MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-24 FROM THE LAWRENCE COUNTY LINE TO THE INTERSECTION OF SR- 67 SOUTHWEST OF DECATUR02044Grayson Carter & Son Contracting, Inc.$2,693,367$2,737,915+2.0%ALDOT
20250131027PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-53 (US-231) FROM THE HOUSTON COUNTY LINE TO THE INTERSECTION OF CR-63 NORTHWEST OF MIDLAND CITY07043Wiregrass Construction Company, Inc.$2,626,699$2,700,820+3.0%ALDOT
20250131028MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-255 FROM THE SR-2 (US-72) INTERCHANGE TO A POINT 0.680 MILE NORTH OF THE JUNCTION OF SR-5301024Rogers Group, Inc.$2,596,600$3,033,439+17%ALDOT
20250131022RESURFACING (SCRUB SEAL), HORIZONTAL DRAINS, AND STRIPE ON SR-74 (US-278) FROM THE JUNCTION OF JONES ROAD TO THE JUNCTION OF CR-36 IN SNEAD03023Vulcan Materials Asphalt and Construction,$2,183,566$2,206,540+1.0%ALDOT
20250131015INTERSECTION AND ROADWAY IMPROVEMENTS ON SR-8 (US-80) AT SR-1 (US-280) IN PHENIX CITY06061McElhenney Construction Co., LLC$2,079,591ALDOT
20250131033MICRO-MILL, RESURFACE, STEEL BLOCKOUT REPLACEMENT, & STRIPE ON SR-13 (US-43) FROM THE MOBILE COUNTY LINE TO BILBO CREEK BRIDGE SOUTHEAST OF MCINTOSH08043Mobile Asphalt Company, LLC$2,045,454$2,335,468+14%ALDOT
20250131048RESURFACING, TRAFFIC SIGNAL UPGRADES, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM NEWPORT AVENUE TO INVERNESS DRIVE AND ON SR-145 FROM SR-3 (US-31) TO 1ST STREET05042Wiregrass Construction Company, Inc.$2,043,800$2,272,749+11%ALDOT
20250131017MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-20 FROM THE JUNCTION OF SR-33 IN COURTLAND TO A POINT 0.230 MILE WEST OF THE JUNCTION OF KIRBY ROAD IN HILL02024Grayson Carter & Son Contracting, Inc.$1,949,873$1,985,830+2.0%ALDOT
20250131037MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-59 FROM THE JUNCTION OF SR-287 TO THE JUNCTION OF MCMILLAN ROAD NORTHEAST OF STOCKTON09023Mobile Asphalt Company, LLC$1,711,992$1,875,433+10%ALDOT
20250131020TUNNEL LIGHTING REPLACEMENTS ON SR-42 (US-98) IN THE BANKHEAD TUNNEL IN MOBILE09011Bill Smith Electric, Inc.$1,187,480ALDOT
20250131054RESURFACING AND TRAFFIC STRIPE ON CR-514 FROM SR-87 TO SR-12 (US-84) (SITE 1) AND ON CR-515 FROM CR-514 TO SR-302 (SITE 2)07023Wiregrass Construction Company, Inc.$904,819$1,039,483+15%ALDOT
20250131010SAFETY IMPROVEMENTS (TRAFFIC SIGN REPLACEMENT) ON I-65 FROM 0.810 MILE SOUTH OF THE CULLMAN COUNTY LINE TO 0.631 MILE SOUTH OF THE TENNESSEE STATE LINE0201, 02042Superior Traffic Control, LLC$792,448$843,695+6.0%ALDOT
20250131036INTERSECTION IMPROVEMENTS AND TRAFFIC SIGNAL INSTALLATION ON SR-14 AT THE 17 SPRINGS ENTRANCE IN MILLBROOK06014Wiregrass Construction Company, Inc.$596,807$612,631+3.0%ALDOT
20250131051RESURFACING AND TRAFFIC STRIPE ON CR-23 (LIGHTWOOD ROAD) FROM THE JUNCTION OF SR-111 TO THE JUNCTION OF LAKE HAVEN DRIVE06013Asphalt Contractors, Inc.$521,134$624,999+20%ALDOT
20250131057ROADWAY IMPROVEMENTS (TURN LANE ADDITIONS) ON SR-9 AT THE PROPOSED ENTRANCE TO THE INDUSTRIAL PARK IN ASHLAND04044Gary Ingram Grading & Paving, Inc.$340,827$414,152+22%ALDOT
20250131012ROADWAY SAFETY IMPROVEMENTS (SCORING AND GUARDRAIL) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS05041Alabama Guardrail, Inc.$293,617ALDOT
ALDOT contracts let on January 31, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy