ALDOT contract 20250131026 bid tabulation

MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-24 FROM THE LAWRENCE COUNTY LINE TO THE INTERSECTION OF SR- 67 SOUTHWEST OF DECATUR. Let by Alabama DOT on January 31, 2025, Morgan, 0204. 4 bids received; low bid $2,693,367 by Grayson Carter & Son Contracting, Inc..

Owner
Alabama DOT
Letting
31 JAN 2025
Pay items
40
Data through
28 AUG 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Grayson Carter & Son Contracting, Inc.$2,693,367Low
2Rogers Group, Inc.$2,737,915+2.0%
3Wiregrass Construction Company, Inc.$2,852,446+6.0%
4Apac-Alabama, Inc.$3,644,657+35%
ALDOT contract 20250131026: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Grayson Carter & Son Contracting, Inc.2. Rogers Group, Inc.3. Wiregrass Construction Company, Inc.4. Apac-Alabama, Inc.
0010Removing guardrail end anchor (all type) (206E008)EACH2$526.35$530.00$530.68$597.66
0020Tack coat (405A000)GAL22,301$3.71$3.00$2.75$4.89
0030Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001)SY223,008$0.50$0.45$1.05$1.46
0040Material remixing device (410H000)EACH1$36,967$100,000$20,000$38,019
0050Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360)TON16,724$79.10$73.10$73.00$103.11
0060Superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range C/D (424A369)TON1,675$93.96$97.00$88.17$159.56
0070Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655)TON1,000$89.41$102.00$74.27$133.55
0080Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424B657)TON500$78.01$89.00$115.96$102.93
0090Aggregate surfacing (crushed aggregate base, type A) (430B042)TON240$36.75$42.00$87.73$74.02
0100High density mineral bond (432A000)SY88,788$4.89$4.45$4.67$5.50
0110Mobilization (600A000)LS1$27,256$165,419$206,524$46,900
0120Guardrail end anchor, type 13 (MASH) (630C079)EACH1$4,000.00$3,800.00$4,033.12$4,542.19
0130Guardrail end anchor, type 20 series (MASH) (630C080)EACH1$3,790.00$3,600.00$3,820.85$4,303.14
0140Guardrail reset (631C010)LF112$21.10$20.00$21.23$23.91
0150Guardrail end anchor, type 8, reset (631E001)EACH1$1,579.00$1,500.00$1,592.02$1,792.98
0160Construction fuel (maximum bid limited to $ 168,000.00) (698A000)LS1$0.01$0.00$0.00$0.01
0170Solid white, class 2, type A traffic stripe (5" wide) (701A227)MI12$4,500.00$4,275.00$4,537.27$5,080.09
0180Solid yellow, class 2, type A traffic stripe (5" wide) (701A230)MI11$4,500.00$4,275.00$4,537.27$5,080.09
0190Broken white, class 2, type A traffic stripe (5" wide) (701A239)MI11$2,100.00$1,995.00$2,117.39$3,167.58
0200Dotted, class 2, type A traffic stripe (5" wide) (701B207)LF12,901$2.00$2.00$2.02$2.39
0210Broken temporary traffic stripe (701C000)MI22$1,250.00$1,200.00$1,260.35$1,225.20
0220Solid temporary traffic stripe (701C001)MI45$1,250.00$1,200.00$1,260.35$1,284.96
0230Broken white, class W, type A traffic stripe (5" wide) (701G142)LF945$4.00$4.00$4.03$3.59
0240Solid white, class W, type A traffic stripe (5"wide) (701G146)LF630$8.00$8.00$8.07$5.98
0250Solid yellow, class W, type A traffic stripe (5" wide) (701G154)LF630$8.00$8.00$8.07$5.98
0260Solid traffic stripe removed (tape) (701H002)LF1,260$2.00$2.00$2.02$1.20
0270Broken traffic stripe removed (tape) (701H007)LF945$2.00$2.00$2.02$1.20
0280Traffic control markings, class 2, type A (703A002)SF5,122$6.25$6.00$6.30$6.57
0290Traffic control legends, class 2, type A (703B002)SF762$6.25$6.00$6.30$7.17
0300Temporary traffic control markings (703D001)SF2,696$3.00$3.00$3.02$3.59
0310Pavement markers, class A-H, type 2-C (705A030)EACH880$6.25$6.00$6.30$6.57
0320Loop wire (730H001)LF6,500$2.75$2.55$2.71$3.05
0330Loop detector lead-in-cable (730I001)LF3,500$2.00$2.00$2.12$2.39
0340Traffic signal junction box type S1 (730K001)EACH4$450.00$450.00$477.61$537.89
03502", non-metallic, conduit (730L005)LF3,500$5.00$5.00$5.31$5.98
0360Miscellaneous equipment, backplate for existing vehicular signal head, 3 (730Q020)EACH18$450.00$425.00$424.54$478.13
0370Construction signs (740B000)SF1,694$6.40$6.00$6.37$7.17
0380Channelizing drums (740D000)EACH100$12.25$11.50$58.37$97.72
0390Cones (36 inches high) (740E000)EACH300$0.01$1.00$8.68$32.57
0400Portable sequential arrow and chevron sign unit (741C010)EACH2$665.00$400.00$663.35$390.87
ALDOT contract 20250131026: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

Every contract let that day: ALDOT letting of January 31, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy