Southern Road & Bridge, LLC: ALDOT bid record

Southern Road & Bridge, LLC submitted 16 bids on Alabama DOT contracts in the data, from 24 JUN 2022 to 28 AUG 2026, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +75% above the low bid.

Owner
Alabama DOT
Low bid volume
$41,252,881
Latest bid
28 AUG 2026
Data through
28 AUG 2026
16Bids
2Low bids
13Win rate, percent
+75%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
2022200%
2023400%
2024300%
20254250%
2026300%
Southern Road & Bridge, LLC, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
09013267%
0502200%
0601100%
1009100%
0702, 0704,100%
0204100%
0105100%
0504100%
0803100%
0301100%
0104100%
1003100%
Southern Road & Bridge, LLC, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Truck mounted impact attenuator unit728A000EACH84 (50%)$15,000$17,316
Channelizing drums740D000EACH143 (21%)$33.00$33.00
Portable sequential arrow and chevron sign unit741C010EACH142 (14%)$5,250.00$1,597.10
Cones (36 inches high)740E000EACH102 (20%)$23.50$20.47
Construction signs740B000SF151 (7%)$10.00$7.00
Portable changeable message sign, type 2742A001EACH111 (9%)$11,200$4,210.53
Ballast for cone740M001EACH61 (17%)$15.00$9.00
Southern Road & Bridge, LLC, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Cekra, Inc87 of 8
M & J Construction Company of Pinellas86 of 8
Seminole Equipment, Inc.77 of 7
Omega Coatings & Construction, LLC66 of 6
Olympus Painting Contractors, Inc.65 of 6
Gulf Coast Contracting, LLC66 of 6
International Rigging Group, LLC55 of 5
S & D Industrial Painting, Inc.44 of 4
Southern Coatings of Tarpon Springs, LLC33 of 3
Monoko, LLC32 of 3
Southern Road & Bridge, LLC, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 AUG 2026202608280040502BRIDGE REHAB (HYDROBLAST, BRIDGE PAINTING, SUBSTRUCTURE PATCHING, STEEL REPAIRS, NAV LIGHT REPLACEMENT, AND GUARDRAIL) ON I-20/I-59 OVER THE6 of 6$19,464,733+87%
28 AUG 2026202608280050506BRIDGE PAINTING ON I-20/I-59 OVER JONES CREEK AND FACTORY CREEK NORTHEAST OF EPES11 of 11$2,491,108+123%
30 JAN 2026202601300021003BRIDGE DECK REHABILITATION (HYDRODEMOLITION) ON I-20/I-59 (SOUTHBOUND ROADWAY) FROM THE SUMTER COUNTY LINE TO THE CR-80 OVERPASS3 of 3$7,965,221+14%
05 DEC 2025202512050010104BRIDGE PAINTING TO INCLUDE BRIDGE JOINT REPAIR (NBR ONLY) ON SR-1 (US-431) OVER THE TENNESSEE RIVER TO INCLUDE BRIDGE JOINT REPAIR ON THE NO10 of 11$10,768,235+61%
07 NOV 2025202511070020901BIRDGE REPAIR (CABLE CONNECTION REPAIRS) ON SR-16 (US-90) ON THE COCHRANE/AFRICATOWN BRIDGE OVER THE MOBILE RIVER IN MOBILE.1 of 1$7,593,015Low
31 JAN 2025202501310030301BRIDGE PAINTING ON SR-3 (US-31) AND THE I-20/I-59 INTERCHANGE AT VARIOUS LOCATIONS IN BIRMINGHAM AS INDICATED IN THE PLANS9 of 9$6,810,076+126%
31 JAN 2025202501310060901BRIDGE REHABILITATION AND CORROSION MITIGATION ON SR-193 (DAUPHIN ISLAND BRIDGE) FROM THE NORTHERN END OF THE BRIDGE TO THE SOUTHERN END1 of 3$33,659,866Low, 9.0% under the second
26 JUL 2024202407260020504BRIDGE PAINTING AND BRIDGE REHABILITATION ON SR-22 OVER THE COOSA RIVER NORTHEAST OF VERBENA3 of 3$5,569,572+67%
26 JUL 2024202407260290803MAINTENANCE BRIDGE PAINTING ON SR-21 OVER THE SCENIC TRAIL SOUTHWEST OF BEATRICE AND OVER FLAT CREEK NORTHEAST OF BEATRICE4 of 4$503,746+79%
29 MAR 2024202403290540502MAINTENANCE BRIDGE PAINTING ON SR-215 OVER THE ALABAMA GREAT SOUTHERN RAILROAD (SITE 1) AND ON I-20/I-59 AT THE 3RD AVE EAST OVERPASS (SITE 4 of 4$921,005+46%
29 SEP 2023202309290220204BRIDGE REPAIRS, BRIDGE PAINTING, BRIDGE GUARDRAIL RETROFIT ON I-65 BRIDGES OVER THE TENNESSEE RIVER2 of 2$35,256,480+49%
29 SEP 2023202309290520105MAINTENANCE BRIDGE PAINTING ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN GADSDEN AS INDICATED IN THE PLANS6 of 6$2,793,390+169%
25 AUG 2023202308250320702, 0704,MAINTENANCE BRIDGE PAINTING ON SR-54 OVER FLAT CREEK; ON SR-12 (US-84) WBR AND EBR OVER CLAYBANK CREEK; AND ON SR-10 OVER THE PEA RIVER7 of 7$1,550,644+149%
28 APR 2023202304280391009MAINTENANCE BRIDGE PAINTING ON SR-171 OVER DOUGAN CREEK; ON SR-171 OVER THE BUTTAHATCHEE RIVER RELIEF BRIDGE; AND ON SR-118 OVER THE NEW RIV2 of 3$785,640+59%
29 JUL 2022202207290020901BRIDGE PAINTING ON I-65 AT VARIOUS LOCATION AS INDICATED IN THE PLANS8 of 8$4,479,770+171%
24 JUN 2022202206240010601BRIDGE REHABILITATION AND BRIDGE PAINTING ON SR-14 OVER THE TALLAPOOSA RIVER IN TALLASSEE5 of 9$6,010,495+72%
Southern Road & Bridge, LLC: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way