ALDOT contract 20260828005 bid tabulation
BRIDGE PAINTING ON I-20/I-59 OVER JONES CREEK AND FACTORY CREEK NORTHEAST OF EPES. Let by Alabama DOT on August 28, 2026, Sumter, 0506. 11 bids received; low bid $1,116,540 by S & D Industrial Painting, Inc..
- Owner
- Alabama DOT
- Letting
- 28 AUG 2026
- Pay items
- 11
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S & D Industrial Painting, Inc. | $1,116,540 | Low |
| 2 | International Rigging Group, LLC | $1,146,020 | +3.0% |
| 3 | Seminole Equipment, Inc. | $1,193,884 | +7.0% |
| 4 | Omega Coatings & Construction, LLC | $1,348,343 | +21% |
| 5 | Cekra, Inc | $1,362,624 | +22% |
| 6 | Gulf Coast Contracting, LLC | $1,547,128 | +39% |
| 7 | Elite Industrial Painting, Inc. | $1,628,743 | +46% |
| 8 | Kalymnos Bridge Painting, LLC | $1,913,668 | +71% |
| 9 | Olympus Painting Contractors, Inc. | $2,267,300 | +103% |
| 10 | Monoko, LLC | $2,454,329 | +120% |
| 11 | Southern Road & Bridge, LLC | $2,491,108 | +123% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S & D Industrial Painting, Inc. | 2. International Rigging Group, LLC | 3. Seminole Equipment, Inc. | 4. Omega Coatings & Construction, LLC | 5. Cekra, Inc | 6. Gulf Coast Contracting, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Coating existing bridge at MP 25.084 (southbound lane) (521B000) | LS | 1 | $270,000 | $289,768 | $300,000 | $322,000 | $265,000 | $380,000 |
| 0020 | Coating existing bridge at MP 25.084 (northbound lane) (521B001) | LS | 1 | $270,000 | $289,768 | $300,000 | $322,000 | $265,000 | $380,000 |
| 0030 | Coating existing bridge at MP 26.447 (southbound lane) (521B002) | LS | 1 | $250,000 | $258,160 | $265,000 | $297,000 | $265,000 | $350,000 |
| 0040 | Coating existing bridge at MP 26.459 (northbound lane) (521B003) | LS | 1 | $240,000 | $241,456 | $250,000 | $279,000 | $265,000 | $342,000 |
| 0050 | Mobilization (600A000) | LS | 1 | $70,000 | $25,000 | $50,000 | $100,000 | $160,000 | $40,000 |
| 0060 | Construction fuel (maximum bid limited to $ 98,000.00) (698A000) | LS | 1 | $2,000.00 | $0.00 | $0.00 | $1,000.00 | $42,000 | $50,000 |
| 0070 | Truck mounted impact attenuator unit (728A000) | EACH | 2 | $2,500.00 | $5,000.00 | $10,000 | $4,000.00 | $25,000 | $1,000.00 |
| 0080 | Construction signs (740B000) | SF | 1,328 | $5.00 | $6.00 | $3.00 | $6.00 | $8.00 | $1.00 |
| 0090 | Channelizing drums (740D000) | EACH | 300 | $3.00 | $25.00 | $3.00 | $0.25 | $40.00 | $1.00 |
| 0100 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $500.00 | $2,650.00 | $1,000.00 | $100.00 | $6,000.00 | $250.00 |
| 0110 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $500.00 | $5,550.00 | $1,000.00 | $5,550.00 | $8,000.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of August 28, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.