ALDOT contract 20260828005 bid tabulation

BRIDGE PAINTING ON I-20/I-59 OVER JONES CREEK AND FACTORY CREEK NORTHEAST OF EPES. Let by Alabama DOT on August 28, 2026, Sumter, 0506. 11 bids received; low bid $1,116,540 by S & D Industrial Painting, Inc..

Owner
Alabama DOT
Letting
28 AUG 2026
Pay items
11
Data through
28 AUG 2026

Bidders

RankBidderTotal bidAgainst the low bid
1S & D Industrial Painting, Inc.$1,116,540Low
2International Rigging Group, LLC$1,146,020+3.0%
3Seminole Equipment, Inc.$1,193,884+7.0%
4Omega Coatings & Construction, LLC$1,348,343+21%
5Cekra, Inc$1,362,624+22%
6Gulf Coast Contracting, LLC$1,547,128+39%
7Elite Industrial Painting, Inc.$1,628,743+46%
8Kalymnos Bridge Painting, LLC$1,913,668+71%
9Olympus Painting Contractors, Inc.$2,267,300+103%
10Monoko, LLC$2,454,329+120%
11Southern Road & Bridge, LLC$2,491,108+123%
ALDOT contract 20260828005: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. S & D Industrial Painting, Inc.2. International Rigging Group, LLC3. Seminole Equipment, Inc.4. Omega Coatings & Construction, LLC5. Cekra, Inc6. Gulf Coast Contracting, LLC
0010Coating existing bridge at MP 25.084 (southbound lane) (521B000)LS1$270,000$289,768$300,000$322,000$265,000$380,000
0020Coating existing bridge at MP 25.084 (northbound lane) (521B001)LS1$270,000$289,768$300,000$322,000$265,000$380,000
0030Coating existing bridge at MP 26.447 (southbound lane) (521B002)LS1$250,000$258,160$265,000$297,000$265,000$350,000
0040Coating existing bridge at MP 26.459 (northbound lane) (521B003)LS1$240,000$241,456$250,000$279,000$265,000$342,000
0050Mobilization (600A000)LS1$70,000$25,000$50,000$100,000$160,000$40,000
0060Construction fuel (maximum bid limited to $ 98,000.00) (698A000)LS1$2,000.00$0.00$0.00$1,000.00$42,000$50,000
0070Truck mounted impact attenuator unit (728A000)EACH2$2,500.00$5,000.00$10,000$4,000.00$25,000$1,000.00
0080Construction signs (740B000)SF1,328$5.00$6.00$3.00$6.00$8.00$1.00
0090Channelizing drums (740D000)EACH300$3.00$25.00$3.00$0.25$40.00$1.00
0100Portable sequential arrow and chevron sign unit (741C010)EACH2$500.00$2,650.00$1,000.00$100.00$6,000.00$250.00
0110Portable changeable message sign, type 2 (742A001)EACH2$500.00$5,550.00$1,000.00$5,550.00$8,000.00$500.00
ALDOT contract 20260828005: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

Every contract let that day: ALDOT letting of August 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy