Cekra, Inc: ALDOT bid record

Cekra, Inc submitted 12 bids on Alabama DOT contracts in the data, from 24 JUN 2022 to 28 AUG 2026, and was the low bidder on 4 of them (33%). When it was not low, its total sat a median +28% above the low bid.

Owner
Alabama DOT
Low bid volume
$34,128,926
Latest bid
28 AUG 2026
Data through
28 AUG 2026
12Bids
4Low bids
33Win rate, percent
+28%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
2022200%
202311100%
20243133%
20254250%
2026200%
Cekra, Inc, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
0502200%
0601100%
0701100%
020411100%
050411100%
1003100%
0301100%
0901100%
0102, 010511100%
010411100%
0506100%
Cekra, Inc, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Cones (36 inches high)740E000EACH64 (67%)$24.50$20.47
Channelizing drums740D000EACH123 (25%)$46.00$33.00
Portable changeable message sign, type 2742A001EACH112 (18%)$8,000.00$4,210.53
Broken traffic stripe removed (tape)701H007LF52 (40%)$0.55$1.10
Construction signs740B000SF121 (8%)$9.00$7.00
Portable sequential arrow and chevron sign unit741C010EACH111 (9%)$4,200.00$1,597.10
Pavement markers, class A-H, type 2-C705A030EACH61 (17%)$8.12$6.00
Solid white, class W, type A traffic stripe (5"wide)701G146LF51 (20%)$6.30$6.57
Solid traffic stripe removed (tape)701H002LF51 (20%)$1.10$1.11
Removing raised pavement markers206E043EACH51 (20%)$8.00$3.58
Bridge deck repair with formwork544B000SY51 (20%)$750.00$550.20
Cekra, Inc, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Southern Road & Bridge, LLC81 of 8
Omega Coatings & Construction, LLC52 of 5
Olympus Painting Contractors, Inc.50 of 5
Gibson & Associates, Inc.53 of 5
International Rigging Group, LLC41 of 4
Seminole Equipment, Inc.42 of 4
M & J Construction Company of Pinellas40 of 4
American Contracting & Services, Inc.43 of 4
S & D Industrial Painting, Inc.31 of 3
Gulf Coast Contracting, LLC30 of 3
Cekra, Inc, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 AUG 2026202608280040502BRIDGE REHAB (HYDROBLAST, BRIDGE PAINTING, SUBSTRUCTURE PATCHING, STEEL REPAIRS, NAV LIGHT REPLACEMENT, AND GUARDRAIL) ON I-20/I-59 OVER THE2 of 6$10,787,716+4.0%
28 AUG 2026202608280050506BRIDGE PAINTING ON I-20/I-59 OVER JONES CREEK AND FACTORY CREEK NORTHEAST OF EPES5 of 11$1,362,624+22%
05 DEC 2025202512050010104BRIDGE PAINTING TO INCLUDE BRIDGE JOINT REPAIR (NBR ONLY) ON SR-1 (US-431) OVER THE TENNESSEE RIVER TO INCLUDE BRIDGE JOINT REPAIR ON THE NO1 of 11$6,692,309Low, 16% under the second
29 AUG 2025202508290250102, 0105MAINTENANCE BRIDGE PAINTING ON SR-53 (US-231) AT MP 315.314 IN HUNTSVILLE AND ON I-759 (MP 1.005) AT THE EASTSIDE DRIVE OVERPASS IN GADSDEN.1 of 7$420,000Low, 35% under the second
31 JAN 2025202501310030301BRIDGE PAINTING ON SR-3 (US-31) AND THE I-20/I-59 INTERCHANGE AT VARIOUS LOCATIONS IN BIRMINGHAM AS INDICATED IN THE PLANS2 of 9$3,185,000+6.0%
31 JAN 2025202501310060901BRIDGE REHABILITATION AND CORROSION MITIGATION ON SR-193 (DAUPHIN ISLAND BRIDGE) FROM THE NORTHERN END OF THE BRIDGE TO THE SOUTHERN END2 of 3$36,621,220+9.0%
27 SEP 2024202409270021003BRIDGE DECK REHABILITATION (HYDROBLASTING) ON I-20/I-59 (NORTHBOUND ROADWAY) FROM THE SUMTER COUNTY LINE TO THE CR-80 UNDERPASS NORTHWEST OF3 of 3$9,616,286+34%
26 JUL 2024202407260020504BRIDGE PAINTING AND BRIDGE REHABILITATION ON SR-22 OVER THE COOSA RIVER NORTHEAST OF VERBENA1 of 3$3,339,656Low, 24% under the second
29 MAR 2024202403290050502BRIDGE DECK REHABILITATION (HYDROBLASTING) ON I-20/I-59 (NORTHBOUND AND SOUTHBOUND ROADWAYS) FROM MP 64.770 TO MP 71.160 SOUTHWEST OF TUSCAL5 of 5$12,648,823+78%
29 SEP 2023202309290220204BRIDGE REPAIRS, BRIDGE PAINTING, BRIDGE GUARDRAIL RETROFIT ON I-65 BRIDGES OVER THE TENNESSEE RIVER1 of 2$23,676,961Low, 49% under the second
30 SEP 2022202209300010701BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-12 (US-84) OVER THE CHATTAHOOCHEE RIVER (MP 231.490 TO MP 231.670) SOUTHWES4 of 5$3,759,458+50%
24 JUN 2022202206240010601BRIDGE REHABILITATION AND BRIDGE PAINTING ON SR-14 OVER THE TALLAPOOSA RIVER IN TALLASSEE2 of 9$4,690,755+34%
Cekra, Inc: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy