Gibson & Associates, Inc.: ALDOT bid record
Gibson & Associates, Inc. submitted 10 bids on Alabama DOT contracts in the data, from 30 SEP 2022 to 28 AUG 2026, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $6,656,211
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 1 | 100% |
| 2023 | 3 | 1 | 33% |
| 2024 | 3 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0502 | 3 | 0 | 0% |
| 0701 | 2 | 1 | 50% |
| 0704 | 2 | 0 | 0% |
| 0706 | 1 | 1 | 100% |
| 0504 | 1 | 0 | 0% |
| 1003 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bridge deck repair with formwork | 544B000 | SY | 9 | 6 (67%) | $100.00 | $550.20 |
| Portable changeable message sign, type 2 | 742A001 | EACH | 9 | 5 (56%) | $5,890.50 | $4,210.53 |
| Construction signs | 740B000 | SF | 10 | 4 (40%) | $7.56 | $7.00 |
| Channelizing drums | 740D000 | EACH | 9 | 3 (33%) | $33.00 | $33.00 |
| Hydroblasting | 544A000 | SY | 9 | 2 (22%) | $160.25 | $157.50 |
| Placing and finishing concrete overlay | 544C000 | SY | 9 | 2 (22%) | $115.75 | $120.12 |
| Concrete for overlay | 544D000 | CY | 9 | 2 (22%) | $1,475.00 | $1,500.00 |
| Sand bags | 665G000 | EACH | 6 | 2 (33%) | $9.62 | $10.00 |
| Barricades, type III | 740F002 | EACH | 6 | 2 (33%) | $219.88 | $252.14 |
| Portable sequential arrow and chevron sign unit | 741C010 | EACH | 8 | 1 (13%) | $3,107.50 | $1,597.10 |
| Tack coat | 405A000 | GAL | 5 | 1 (20%) | $6.05 | $4.55 |
| Portable concrete safety barriers, type 6 | 726A000 | LF | 5 | 1 (20%) | $57.59 | $61.09 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| American Contracting & Services, Inc. | 9 | 6 of 9 |
| Comanche Construction of Georgia, LLC | 6 | 3 of 6 |
| Cekra, Inc | 5 | 2 of 5 |
| Southern Road & Bridge, LLC | 2 | 0 of 2 |
| Omega Coatings & Construction, LLC | 2 | 0 of 2 |
| M & J Construction Company of Pinellas | 1 | 0 of 1 |
| Key, LLC | 1 | 0 of 1 |
| F&W Construction Company, Inc. | 1 | 1 of 1 |
| Ivs Hydro, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828004 | 0502 | BRIDGE REHAB (HYDROBLAST, BRIDGE PAINTING, SUBSTRUCTURE PATCHING, STEEL REPAIRS, NAV LIGHT REPLACEMENT, AND GUARDRAIL) ON I-20/I-59 OVER THE | 3 of 6 | $10,816,691 | +4.0% |
| 24 APR 2026 | 20260424001 | 0704 | FOR CONSTRUCTING THE BRIDGE DECK REHABILITATION (HYDROBLASTING) AND TRAFFIC STRIPE ON SR-53 (US-231) OVER THE CHOCTAWHATCHEE RIVER IN NEWTON | 3 of 4 | $2,220,646 | +31% |
| 25 JUL 2025 | 20250725004 | 0704 | BRIDGE DECK REHABILITATION (HYDRO DEMO) AND PAINTING ON SR-12 (US-84) (EASTBOUND ROADWAY) OVER THE CHOCTAWHATCHEE RIVER SOUTHEAST OF DALEVIL | 3 of 4 | $1,095,422 | +22% |
| 27 SEP 2024 | 20240927002 | 1003 | BRIDGE DECK REHABILITATION (HYDROBLASTING) ON I-20/I-59 (NORTHBOUND ROADWAY) FROM THE SUMTER COUNTY LINE TO THE CR-80 UNDERPASS NORTHWEST OF | 2 of 3 | $8,947,249 | +24% |
| 26 JUL 2024 | 20240726002 | 0504 | BRIDGE PAINTING AND BRIDGE REHABILITATION ON SR-22 OVER THE COOSA RIVER NORTHEAST OF VERBENA | 2 of 3 | $4,139,061 | +24% |
| 29 MAR 2024 | 20240329005 | 0502 | BRIDGE DECK REHABILITATION (HYDROBLASTING) ON I-20/I-59 (NORTHBOUND AND SOUTHBOUND ROADWAYS) FROM MP 64.770 TO MP 71.160 SOUTHWEST OF TUSCAL | 3 of 5 | $9,375,604 | +32% |
| 25 AUG 2023 | 20230825001 | 0701 | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-52 OVER THE CHATTAHOOCHEE RIVER | 2 of 2 | $1,314,827 | 0.0% |
| 07 APR 2023 | 20230407001 | 0706 | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-6 (US-82) OVER THE CHATTAHOOCHEE RIVER | 1 of 3 | $4,157,598 | Low, 11% under the second |
| 24 FEB 2023 | 20230224008 | 0502 | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHAB) ON I-20/I-59 (NORTHBOUND ROADWAY) FROM MP 63.721 TO MP 72.064 | 3 of 3 | $5,830,041 | +27% |
| 30 SEP 2022 | 20220930001 | 0701 | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-12 (US-84) OVER THE CHATTAHOOCHEE RIVER (MP 231.490 TO MP 231.670) SOUTHWES | 1 of 5 | $2,498,613 | Low, 10% under the second |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.