ALDOT letting results, August 28, 2026
13 contracts let by Alabama DOT on August 28, 2026, $33,671,530 in low bids, a median of 3 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 13
- Low bids, total
- $33,671,530
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20260828004 | BRIDGE REHAB (HYDROBLAST, BRIDGE PAINTING, SUBSTRUCTURE PATCHING, STEEL REPAIRS, NAV LIGHT REPLACEMENT, AND GUARDRAIL) ON I-20/I-59 OVER THE BLACK WARRIOR RIVER | 0502 | 6 | Ivs Hydro, Inc. | $10,393,036 | $10,787,716 | +4.0% | ALDOT |
| 20260828023 | PLANING, MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-65 FROM THE MONTGOMERY COUNTY LINE TO A POINT NEAR THE SR-14 INTERCHANGE (M | 0601 | 2 | Apac-Alabama, Inc. | $8,398,370 | $8,987,680 | +7.0% | ALDOT |
| 20260828021 | RESURFACING, GUARDRAIL INSTALL (GUARDRAIL, GUARDRAIL END ANCHORS, AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT), AND STRIPE ON I-22 FROM A POINT 0.800 MILE EAST OF | 1008 | 3 | Dunn Construction Company, Inc. | $8,271,788 | $8,430,263 | +2.0% | ALDOT |
| 20260828011 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE TO INTERSECTION IMPROVEMENTS (LEFT AND RIGHT TURN LANES) ON CR 109 FROM SR-202 TO MORRISVILLE ROAD TO INCLUDE VAR | 0402 | 4 | Vulcan Materials Asphalt and Construction, | $2,274,716 | $2,346,073 | +3.0% | ALDOT |
| 20260828030 | ROADWAY IMPROVEMENTS/REALIGNMENT (GRADING, DRAINING, PAVEMENT, TRAFFIC SIGNS, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-3 (US-31) AT SPARKMAN STREET AND LANE R | 0202 | 8 | Rogers Group, Inc. | $1,167,500 | $1,228,953 | +5.0% | ALDOT |
| 20260828005 | BRIDGE PAINTING ON I-20/I-59 OVER JONES CREEK AND FACTORY CREEK NORTHEAST OF EPES | 0506 | 11 | S & D Industrial Painting, Inc. | $1,116,540 | $1,146,020 | +3.0% | ALDOT |
| 20260828018 | ROADWAY SAFETY IMPROVEMENTS (SLOPE FLATTENING TO INCLUDE CLEARING AND GRUBBING) ON CR-1101 AT THE CONECUH RIVER (SITE 1) AND OLUSTEE CREEK (SITE 2) | 0705 | 6 | Grady Ralls & Sons, Inc. | $582,413 | $599,107 | +3.0% | ALDOT |
| 20260828008 | ROADWAY SAFETY IMPROVEMENTS (HIGHWAY LIGHTING UPGRADES) ON I-20/I-59 RAMPS AT THE INTERCHANGE OF MERCEDES DRIVE AND ACCESS ROAD (EXIT 89) IN VANCE | 0502 | 6 | Inline, LLC | $449,978 | $513,386 | +14% | ALDOT |
| 20260828026 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON NORTH BROADWAY STREET FROM THE JUNCTION OF SR-12 (US-84) TO THE JUNCTION OF MAIN STREET IN ASHFORD | 0701 | 3 | Lewis Incorporated.. | $367,883 | $442,117 | +20% | ALDOT |
| 20260828027 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON WEBB ROAD FROM THE INTERSECTION OF NORTH RANGE STREET TO THE INTERSECTION OF SR-210 (US-431) IN DOTHAN | 0701 | 3 | Lewis Incorporated.. | $364,381 | $403,506 | +11% | ALDOT |
| 20260828017 | ROADWAY SAFETY IMPROVMENTS (GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATION) ON CR-81 OVER FLAT ROCK CREEK; ON CR-30 OVER UNNAMED CREEK; AND ON CR-88 OVER JONES | 0103 | 1 | Alabama Guardrail, Inc. | $164,200 | ALDOT | ||
| 20260828014 | ROADWAY SAFETY IMPROVEMENTS (GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATIONS) ON CR-65 0.410 MI NW OF CAHABA HILL RD; ON CR-44 0.110 MI SOUTH OF YEAGER RD; AND | 0504 | 2 | Alabama Guardrail, Inc. | $60,768 | $62,737 | +3.0% | ALDOT |
| 20260828015 | ROADWAY SAFETY IMPROVEMENTS (GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATION) ON CR-54 OVER BRANCH OF DRY CREEK (SITE 1) AND ON CR-54 AT THE CURVE 0.250 MILE SO | 0504 | 2 | Alabama Guardrail, Inc. | $59,958 | $66,081 | +10% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.