ALDOT contract 20260828021 bid tabulation

RESURFACING, GUARDRAIL INSTALL (GUARDRAIL, GUARDRAIL END ANCHORS, AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT), AND STRIPE ON I-22 FROM A POINT 0.800 MILE EAST OF THE EXIT 65 INTERCHANGE TO THE CR-61 OVERPASS. Let by Alabama DOT on August 28, 2026, Walker, 1008. 3 bids received; low bid $8,271,788 by Dunn Construction Company, Inc..

Owner
Alabama DOT
Letting
28 AUG 2026
Pay items
62
Data through
28 AUG 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Dunn Construction Company, Inc.$8,271,788Low
2Wiregrass Construction Company, Inc.$8,430,263+2.0%
3Apac-Alabama, Inc.$9,143,634+11%
ALDOT contract 20260828021: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Dunn Construction Company, Inc.2. Wiregrass Construction Company, Inc.3. Apac-Alabama, Inc.
0010Removing guardrail (206D001)LF100$11.86$11.82$12.04
0020Removing guardrail end anchor (all type) (206E008)EACH28$355.78$354.51$361.21
0030Machine grading shoulders (212A000)STA82$796.73$517.01$348.93
0040Crushed aggregate, section 825, for miscellaneous use (305B077)TON500$104.36$169.20$88.74
0050Tack coat (405A000)GAL16,506$4.35$3.56$4.67
0060Planing existing pavement (approximately 5.10" thru 6.0" thick) (408A056)SY14,237$4.33$7.59$9.03
0070Micro-milling existing pavement (approximately 0.00" thru 1.00" thick) (408B000)SY36,003$1.99$1.61$3.00
0080Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001)SY58,133$2.03$1.88$3.52
0090Micro-fine milling existing pavement (approximately 1.01" thru 1.25" thick) (408C004)SY368,273$1.04$1.38$1.89
0100Material remixing device (410H000)EACH1$55,376$30,000$137,542
0110Polymer modified open graded friction course (420A015)TON16,808$180.62$175.69$173.21
0120Open graded friction course tack coat (420B000)GAL67,224$6.02$4.60$8.09
0130Stone matrix asphalt wearing layer, 1/2" maximum aggregate size (423A003)TON956$240.17$166.92$163.67
0140Stone matrix asphalt binder layer, 3/4" maximum aggregate size (423B002)TON1,309$154.33$156.51$169.24
0150Superpave bituminous concrete wearing surface layer, patching, 1/2" maximum aggregate size mix, esal range E (424A283)TON750$221.10$246.60$190.33
0160Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360)TON6,522$132.29$138.43$145.26
0170Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range E (424B581)TON2,480$107.75$107.92$127.51
0180Aggregate surfacing (1" down, crusher run) (430B043)TON757$157.49$146.01$88.38
0190High density mineral bond (432A000)SY168,925$4.20$4.94$3.85
0200Mobilization (600A000)LS1$196,000$265,129$479,415
0210Steel beam guardrail, class A, type 2 (630A001)LF100$34.39$34.27$34.92
0220Guardrail end anchor, type 8 (630C001)EACH4$1,601.02$1,595.31$1,625.44
0230Guardrail end anchor, type 13 (MASH) (630C079)EACH2$4,743.75$4,726.85$4,816.13
0240Guardrail end anchor, type 20 series (MASH) (630C080)EACH22$4,032.19$4,017.82$4,093.71
0250Guardrail reset (631C010)LF3,721$7.71$7.68$7.83
0260Wattle, 20 inch (665Q020)LF100$17.79$11.23$13.30
0270Construction fuel (maximum bid limited to $ 390,500.00) (698A000)LS1$0.00$0.00$0.00
0280Solid white, class 2, type A traffic stripe (5" wide) (701A227)MI21$4,714.10$4,697.31$4,786.03
0290Solid yellow, class 2, type A traffic stripe (5" wide) (701A230)MI23$4,714.10$4,697.31$4,786.03
0300Broken white, class 2, type A traffic stripe (5" wide) (701A239)MI31$2,164.34$2,156.63$2,197.36
0310Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063)LF665$3.26$3.25$3.31
0320Dotted, class 2, type A traffic stripe (5" wide) (701B207)LF14,698$1.19$1.18$1.20
0330Dotted white with contrast black border, class W, type A traffic stripe (5" wide) (701B500)LF770$5.04$5.02$5.12
0340Broken temporary traffic stripe (701C000)MI61$948.75$945.37$963.23
0350Solid temporary traffic stripe (701C001)MI86$1,008.05$1,004.46$1,023.43
0360Dotted temporary traffic stripe (701F000)LF25,921$0.19$0.19$0.19
0370Broken white, class W, type A traffic stripe (5" wide) (701G142)LF6,709$3.85$3.84$3.91
0380Broken black, class W, type B traffic stripe (5" wide) (701G161)LF6,709$3.85$3.84$3.91
0390Solid white, class 2, type A traffic stripe (5" wide) (rumble strip) (701G252)LF300$8.30$8.27$8.43
0400Solid white with contrast black border, class W, type A traffic stripe (5" wide) (701G500)LF4,615$8.60$8.57$8.73
0410Solid yellow with contrast black border, class W, type A traffic stripe (5" wide) (701G520)LF4,502$8.60$8.57$8.73
0420Solid traffic stripe removed (tape) (701H002)LF9,117$0.59$0.59$0.60
0430Broken traffic stripe removed (tape) (701H007)LF13,417$0.59$0.59$0.60
0440Dotted traffic stripe removed (tape) (701H012)LF770$0.59$0.59$0.60
0450Traffic control markings, class 2, type A (703A002)SF40,688$4.74$4.73$4.82
0460Traffic control markings, class W, type A (703A011)SF1,202$29.65$29.54$30.10
0470Traffic control legends, class 2, type A (703B002)SF897$6.52$6.50$6.62
0480Traffic control legends, class W, type A (703B011)SF45$35.58$35.45$36.12
0490Removal of existing traffic control markings or legends (tape) (703C003)SF1,247$3.56$3.55$3.61
0500Temporary traffic control markings (703D001)SF81,376$0.59$0.59$0.60
0510Pavement markers, class A-H, type 2-C (705A030)EACH9,149$4.74$4.73$4.82
0520Pavement markers, class A-H, type 1-A (705A031)EACH640$4.74$4.73$4.82
0530Pavement markers, class A-H, type 1-B (705A032)EACH421$4.74$4.73$4.82
0540Pavement markers, class A-H, type 2-D (705A037)EACH255$4.74$4.73$4.82
0550Pavement markers, class A-H, type 2-E (705A038)EACH331$4.74$4.73$4.82
0560Truck mounted impact attenuator unit (728A000)EACH2$11,859$7,681.13$17,316
0570Pole for mounting traffic detection equipment (731B000)EACH2$12,452$27,326$12,642
0580Construction signs (740B000)SF5,179$6.52$6.79$6.32
0590Special construction signs (740C000)SF108$7.71$7.09$6.32
0600Channelizing drums (740D000)EACH800$21.94$27.18$62.61
0610Portable sequential arrow and chevron sign unit (741C010)EACH4$1,120.71$1,914.37$1,806.05
0620Portable changeable message sign, type 2 (742A001)EACH6$1,956.80$4,041.46$5,418.14
ALDOT contract 20260828021: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

Every contract let that day: ALDOT letting of August 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy