ALDOT letting results, July 31, 2026

11 contracts let by Alabama DOT on July 31, 2026, $29,490,540 in low bids, a median of 3 bidders per contract.

Owner
Alabama DOT
Contracts
11
Low bids, total
$29,490,540
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20260731017ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION OF NISBET LAKE ROAD 04024Alabama Grading & Excavation, LLC.$8,240,555$8,877,476+8.0%ALDOT
20260731005MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-20/I-59 FROM 1.860 MILES SOUTH OF MCCAINVILLE ROAD UNDERPASS TO THE TOMBIGBEE RIVER 05061S. T. Bunn Construction Company, Inc.$7,080,865ALDOT
20260731011SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE CALHOUN COUNTY LINE TO THE INTERSECTION OF BANKS STREET IN GADSEN.01053Vulcan Materials Asphalt and Construction,$5,715,319$6,692,040+17%ALDOT
20260731022ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET FROM A POINT NEAR T01055Lambert Contracting, LLC$2,148,030$2,329,764+8.0%ALDOT
20260731001ROADWAY AND DRAINAGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT (RESURFACING), AND TRAFFIC STRIPE) ON CR-337 (MCCALLA ROAD) FROM THE JUNCTION OF CR-18 (EASTERN V03016Ikaros, LLC$1,678,000$1,689,855+1.0%ALDOT
20260731004SAFETY IMPROVEMENTS (TRAFFIC SIGN REPLACEMENT) ON I-65 FROM THE BLOUNT COUNTY LINE TO THE MORGAN COUNTY LINE01042Superior Traffic Control, LLC$1,175,186$1,495,504+27%ALDOT
20260731025INTERSECTION IMPROVEMENTS (ADDITIONAL TURN LANES AND TRAFFIC SIGNAL UPGRADES) ON SR-42 (US-98) AT CR-87 EAST OF FOLEY09026Arrington Curb & Excavation, Inc.$861,338$907,155+5.0%ALDOT
20260731003RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-84 (FOREST SERVICE ROAD 265) FROM THE JUNCTION OF CR-76 TO THE JUNCTION OF CR-81 SOUTHEAST OF MOUL02023Rogers Group, Inc.$819,000$904,414+10%ALDOT
20260731021RESURFACING AND TRAFFIC STRIPE ON CR-203 FROM HADDEN RD TO THE LIMESTONE CREEK BRIDGE AND ON COUNTRY GARDEN RD FROM WEBB TO KINSEY RD TO THE HENRY LINE0701, 07053Apac-Alabama, Inc.$805,144$833,751+4.0%ALDOT
20260731014ROADWAY SAFETY IMPROVEMENTS (PIPE REHABILITATION AND DRAINAGE STRUCTURE CORRECTIONS) ON I-59 FROM 0.950 MILE NORTH OF THE SR-1 (US-431) INTERCHANGE TO 0.400 MIL0103, 01052Proshot Concrete, Inc.$749,205$923,420+23%ALDOT
20260731008ROADWAY SAFETY IMPROVEMENTS (GUARDRAIL INSTALLATION AND GUARDRAIL END ANCHORS) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS08024PL Russell LLC$217,898$243,953+12%ALDOT
ALDOT contracts let on July 31, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way