S. T. Bunn Construction Company, Inc.: ALDOT bid record
S. T. Bunn Construction Company, Inc. submitted 75 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 31 JUL 2026, and was the low bidder on 58 of them (77%). When it was not low, its total sat a median +5.0% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $272,806,487
- Latest bid
- 31 JUL 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 20 | 14 | 70% |
| 2023 | 14 | 11 | 79% |
| 2024 | 16 | 13 | 81% |
| 2025 | 14 | 11 | 79% |
| 2026 | 11 | 9 | 82% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0502 | 19 | 11 | 58% |
| 1003 | 13 | 12 | 92% |
| 1001 | 10 | 10 | 100% |
| 1009 | 9 | 6 | 67% |
| 0506 | 9 | 9 | 100% |
| 0802 | 8 | 5 | 63% |
| 0505 | 3 | 2 | 67% |
| 0802, 0901 | 1 | 0 | 0% |
| 1001, 1009 | 1 | 1 | 100% |
| 0502, 1003 | 1 | 1 | 100% |
| 0804 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Material remixing device | 410H000 | EACH | 35 | 32 (91%) | $23,465 | $34,670 |
| Scoring bituminous pavement surface | 428A001 | MI | 31 | 28 (90%) | $284.76 | $486.51 |
| Tack coat | 405A000 | GAL | 40 | 21 (53%) | $4.28 | $4.55 |
| Pilot car | 740O000 | EACH | 26 | 20 (77%) | $16,795 | $8,427.51 |
| Cones (36 inches high) | 740E000 | EACH | 22 | 16 (73%) | $13.83 | $20.47 |
| Crushed aggregate, section 825, for miscellaneous use | 305B077 | TON | 20 | 16 (80%) | $58.25 | $70.30 |
| Temporary traffic control markings | 703D001 | SF | 34 | 14 (41%) | $2.24 | $2.35 |
| Channelizing drums | 740D000 | EACH | 31 | 14 (45%) | $34.80 | $33.00 |
| Construction signs | 740B000 | SF | 41 | 13 (32%) | $6.76 | $7.00 |
| Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D | 424A360 | TON | 22 | 13 (59%) | $113.77 | $120.00 |
| Solid temporary traffic stripe | 701C001 | MI | 39 | 12 (31%) | $983.48 | $1,064.57 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 39 | 12 (31%) | $4,194.64 | $4,427.98 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Apac-Alabama, Inc. | 18 | 6 of 18 |
| Midsouth Paving, Inc. | 10 | 4 of 10 |
| Rogers Group, Inc. | 6 | 3 of 6 |
| H. O. Weaver & Sons, Inc. | 5 | 3 of 5 |
| Mobile Asphalt Company, LLC | 4 | 2 of 4 |
| Central Alabama Asphalt & Construction Co., | 2 | 1 of 2 |
| Wiregrass Construction Company, Inc. | 2 | 1 of 2 |
| Asphalt Contractors, Inc. | 1 | 0 of 1 |
| Bulls Construction Group, LLC | 1 | 0 of 1 |
| Gillespie Construction, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 20260731005 | 0506 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-20/I-59 FROM 1.860 MILES SOUTH OF MCCAINVILLE ROAD UNDERPASS TO | 1 of 1 | $7,080,865 | Low |
| 26 JUN 2026 | 20260626005 | 0502 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-20/I-59 FROM THE SR-300 (EXIT 62) INTERCHANGE TO THE MALLISHAM PARKWAY | 2 of 2 | $6,284,843 | +5.0% |
| 29 MAY 2026 | 20260529015 | 0505 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND TRAFFIC STRIPE) ON CR-50 FROM ELLIOT'S CREEK BRIDGE (0.160 MILE EAST OF THE JUNCTION OF SAN | 1 of 2 | $387,730 | Low, 19% under the second |
| 24 APR 2026 | 20260424018 | 0506 | THIN LIFT OVERLAY, SCRUB SEAL, AND TRAFFIC STRIPE ON SR-116 FROM THE JUNCTION OF SR-17 TO THE JUNCTION OF SR-39 IN GAINESVILLE | 1 of 1 | $2,263,217 | Low |
| 24 APR 2026 | 20260424029 | 1009 | MICRO-MILLING, RESURFACE (SCRUB SEAL), TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENTS AND SIGNAL DETECTION), AND STRIPE ON SR-171 FROM THE | 1 of 2 | $2,462,010 | Low, 8.0% under the second |
| 27 MAR 2026 | 20260327037 | 0505 | PLANING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-61 FROM THE JUNCTION OF CR-48 TO THE INTERSECTION OF SR- | 2 of 2 | $2,644,856 | +1.0% |
| 27 FEB 2026 | 20260227025 | 0506 | SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-13 (US- 43) FROM A POINT 1.860 MI | 1 of 1 | $5,059,255 | Low |
| 27 FEB 2026 | 20260227049 | 1009 | PAVEMENT PRESERVATION TO ROADWAY APPROACHES ON CR-13, CR-55, CR-74, CR-68, AND CR-63 AT VARIOUS SITES AS INDICATED IN THE PLANS | 1 of 1 | $1,335,891 | Low |
| 30 JAN 2026 | 20260130037 | 0502 | MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE LAKE TUSCALOOSA BRIDGE TO A PO | 1 of 2 | $2,727,854 | Low, 1.0% under the second |
| 30 JAN 2026 | 20260130052 | 1001 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-102 FROM THE INTERSECTION OF SR-13 TO THE WALKER COUNTY LINE | 1 of 1 | $3,451,802 | Low |
| 30 JAN 2026 | 20260130057 | 0502 | SAFETY WIDEN, RESURFACE, BRIDGE GUARDRAIL RETRO, AND STRIPE ON SR-69 FROM A POINT 0.600 MILE SOUTH OF THE JUNCTION OF NORTHSIDE ROAD TO THE | 1 of 2 | $4,875,227 | Low, 4.0% under the second |
| 05 DEC 2025 | 20251205047 | 1009 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-118 (US-43) FROM THE INTERSECTION OF SR-171 TO A POINT 0.430 MILE EAST OF | 1 of 2 | $2,766,269 | Low, 17% under the second |
| 05 DEC 2025 | 20251205048 | 0802 | PLANING, RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND STRIPE ON SR-17 FROM THE JUNCTION OF DESOTO ROAD IN BUTLER TO THE SUMTER COUNTY LINE | 1 of 2 | $4,730,609 | Low, 12% under the second |
| 05 DEC 2025 | 20251205049 | 0502 | RESURFACE, TRAFFIC SIGNAL UPGRADES, GUARDRAIL, AND STRIPE ON SR-215 (GREENSBORO AVENUE) FROM THE INTERSECTION OF SR-7 (US-11/SKYLAND BOLUVAR | 2 of 2 | $1,184,197 | +10% |
| 05 DEC 2025 | 20251205051 | 1003 | SAFETY WIDEN, MICRO-MILL, RESURFACE (SCRUB SEAL), AND STRIPE ON SR-14 FROM THE JUNCTION OF CR-119 TO THE JUNCTION OF SR-39 NORTHWEST OF EUTA | 1 of 1 | $3,048,000 | Low |
| 05 DEC 2025 | 20251205056 | 1003 | MICRO-MILLING, RESURFACE, GUARDRAIL INSTALLATION, AND STRIPE ON SR-14 FROM THE MISSISSIPPI STATE LINE TO THE INTERSECTION OF CR-78 IN PICKEN | 1 of 1 | $3,956,329 | Low |
| 07 NOV 2025 | 20251107020 | 0506 | RESURFACE, BRIDGE RAIL RETROFIT, & WELCOME CENTER REPAIRS ON I-20/I-59 FROM THE MISSISSIPPI STATE LINE TO THE NORTHWEST CITY LIMITS OF CUBA | 1 of 1 | $9,045,328 | Low |
| 07 NOV 2025 | 20251107027 | 0502 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON I-20/I-59 FROM THE JUNCTION OF THE JOE MALLISHAM PARKWAY INTERCHANGE TO THE JUNC | 1 of 2 | $2,680,496 | Low, 5.0% under the second |
| 07 NOV 2025 | 20251107037 | 1001 | RESURFACING, BRIDGE GUARDRAIL RETRO, AND TRAFFIC STRIPE ON SR-13 FROM THE INTERSECTION OF SR-18 TO THE INTERSECTION OF SR-102 NORTHWEST OF B | 1 of 1 | $3,424,497 | Low |
| 27 JUN 2025 | 20250627023 | 0804 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-156 FROM SR-17 TO CR-33 (PINE GROVE ROAD) (SITE 1) AND ON SR-114 FROM HARMONY ROAD TO THE TOM | 1 of 3 | $2,926,829 | Low, 5.0% under the second |
| 30 MAY 2025 | 20250530029 | 1003 | SAFETY WIDEN, PLANING, RESURFACE (SCRUB SEAL), AND STRIPE ON SR-17 FROM THE JUNCTION OF DILLBURG ROAD TO THE JUNCTION OF THE COURTHOUSE SQUA | 1 of 1 | $2,497,479 | Low |
| 25 APR 2025 | 20250425018 | 0502 | SAFETY WIDEN, RESURFACE, ACCESS MANAGE, GUARDRAIL, & STRIPE ON SR-6 (US-82) FROM WEST OF THE JUNCTION OF ECHOLA ROAD TO WEST OF THE JUNCTION | 1 of 2 | $5,300,599 | Low, 17% under the second |
| 25 APR 2025 | 20250425019 | 0502 | RESURFACE, SIGNAL UPGRADES, INTERSECTION MODS, & STRIPE ON SR-7 (US-11) FROM THE JUNCTION OF SR-69 TO THE JUNCTION OF PLEASANT HILL DRIVE | 2 of 2 | $7,259,899 | +5.0% |
| 25 APR 2025 | 20250425026 | 0802 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-10 FROM THE INTERSECTION OF SR-69 TO THE JUNCTION OF RECREATION DRIVE IN SWEET WATER | 3 of 3 | $3,017,035 | +5.0% |
| 25 APR 2025 | 20250425032 | 0506 | SAFETY WIDEN, RESURFACE, GUARDRAIL INSTALL, AND STRIPE ON THE SR-28 FROM THE JUNCTION OF CR-21 TO THE JUNCTION OF SR-8 (US-80) | 1 of 1 | $2,450,320 | Low |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.