ALDOT letting results, June 27, 2025
16 contracts let by Alabama DOT on June 27, 2025, $34,654,658 in low bids, a median of 3 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 16
- Low bids, total
- $34,654,658
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20250627012 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-8 (US-80) FROM THE EDMUND PETTIS BRIDGE (MP 85.409) IN SELMA TO A POINT 0.300 MILE EAST OF THE JU | 0605 | 2 | Asphalt Contractors, Inc. | $5,436,361 | $6,999,568 | +29% | ALDOT |
| 20250627016 | OPERATIONAL IMPROVEMENTS AND INTERSECTION IMPROVEMENTS ON SR-35 FROM THE JUNCTION OF SARAH DEWER STREET TO THE JUNCTION OF PRESTWOOD DRIVE IN FORT PAYNE | 0103 | 3 | Wiregrass Construction Company, Inc. | $4,997,900 | $6,081,000 | +22% | ALDOT |
| 20250627001 | BRIDGE REPLACEMENT AND APPROACHES (GRADE, DRAIN, PAVE) ON SR-53 OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER | 03 | 4 | The Bridge Builders of Alabama, LLC | $3,680,342 | $3,720,922 | +1.0% | ALDOT |
| 20250627019 | INTERSECTION IMPROVEMENTS/RELOCATION ON SR-6 (US-82) AT SR-1 (US-431) IN EUFAULA | 0704 | 3 | S. A. Graham Company, Inc. | $3,383,604 | $3,391,928 | 0.0% | ALDOT |
| 20250627023 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-156 FROM SR-17 TO CR-33 (PINE GROVE ROAD) (SITE 1) AND ON SR-114 FROM HARMONY ROAD TO THE TOMBIGBEE RIVER (SITE 2 | 0804 | 3 | S. T. Bunn Construction Company, Inc. | $2,926,829 | $3,077,687 | +5.0% | ALDOT |
| 20250627014 | SAFETY WIDEN, MICRO-MILL, RESURFACE, TRAFFIC SIGNALS, STRIPE ON SR-79 FROM THE INTERSECTION OF ALABAMA STREET TO A POINT SOUTH OF THE BRIDGES OVER FIVE MILE CRE | 0301 | 3 | Apac-Alabama, Inc. | $2,678,384 | $2,730,999 | +2.0% | ALDOT |
| 20250627010 | MICRO-MILLING, RESURFACING, AND TRAFFIC SIGNAL UPGRADES ON SR-5 (US-11) FROM THE SOUTHWEST CITY LIMITS OF BIRMINGHAM TO THE JUNCTION OF ARKADELPHIA ROAD/PRINCET | 0301 | 3 | Wiregrass Construction Company, Inc. | $2,563,943 | $2,606,753 | +2.0% | ALDOT |
| 20250627008 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM A POINT 0.600 MILE SOUTH OF THE JUNCTION OF REDLEAF DRIVE TO THE JUNCTION OF GATES DRIVE. | 0804 | 2 | Apac-Alabama, Inc. | $2,015,460 | $2,485,000 | +23% | ALDOT |
| 20250627035 | MAINTENANCE DREDGING OF LITTLE LAGOON PASS | 0902 | 2 | M D Thomas Construction, LLC. | $1,492,001 | $1,818,101 | +22% | ALDOT |
| 20250627032 | CENTER LEFT TURN LANE, WIDEN, RESURFACE, MICRO-MILL, STRIPE ON SR-184 (SECOND STREET) FROM THE JUNCTION OF GLENDALE AVENUE TO THE JUNCTION OF SHEFFIELD AVENUE E | 0201 | 4 | MLMD, LLC | $1,322,736 | $1,344,797 | +2.0% | ALDOT |
| 20250627020 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-79 FROM THE INTERSECTION OF SR-35 WEST OF SCOTTSBORO TO THE JUNCTION OF CR-145 | 0102 | 2 | Rogers Group, Inc. | $1,123,350 | $1,225,027 | +9.0% | ALDOT |
| 20250627033 | INTERSECTION IMPROVEMENTS ON SR-1 (US-431) AT GREEN VALLEY ROAD IN GLENCOE | 0105 | 2 | Gillespie Construction, LLC | $1,087,320 | $1,157,116 | +6.0% | ALDOT |
| 20250627024 | ROADWAY SAFETY IMPROVEMENT (RESURFACE, MILLING, & STRIPE) ON SR-168 FROM THE JUNCTION OF DARNELL STREET TO THE INTERSECTION OF SR-1 (US-431) IN BOAZ | 0104 | 3 | Vulcan Materials Asphalt and Construction, | $1,037,672 | $1,043,500 | +1.0% | ALDOT |
| 20250627027 | TRAFFIC SIGNAL INSTALLATION AND STRIPING ON SR-181 AT CORTE ROAD/AUSTIN ROAD | 0902 | 2 | Temple J Electric, LLC | $638,952 | $771,278 | +21% | ALDOT |
| 20250627005 | SAFTEY IMPROVEMENTS (GUARDRAIL INSTALLATION AND END ANCHORS) ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE WEST CENTRAL REGION (TUSCALOOSA AREA) AS INDICATED IN | 0506 | 3 | Gillespie Construction, LLC | $233,900 | $249,212 | +7.0% | ALDOT |
| 20250627004 | SAFTEY IMPROVEMENTS (GUARDRAIL INSTALLATION AND END ANCHORS) ON MATT SMITH ROAD OVER GREENS CREEK IN SOUTHSIDE. LENGTH | 0105 | 2 | Alabama Guardrail, Inc. | $35,905 | $41,804 | +16% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.