ALDOT contract 20250627032 bid tabulation
CENTER LEFT TURN LANE, WIDEN, RESURFACE, MICRO-MILL, STRIPE ON SR-184 (SECOND STREET) FROM THE JUNCTION OF GLENDALE AVENUE TO THE JUNCTION OF SHEFFIELD AVENUE EAST OF SHEFFIELD. Let by Alabama DOT on June 27, 2025, Colbert, 0201. 4 bids received; low bid $1,322,736 by MLMD, LLC.
- Owner
- Alabama DOT
- Letting
- 27 JUN 2025
- Pay items
- 66
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | MLMD, LLC | $1,322,736 | Low |
| 2 | Grayson Carter & Son Contracting, Inc. | $1,344,797 | +2.0% |
| 3 | Rogers Group, Inc. | $1,398,682 | +6.0% |
| 4 | Apac-Alabama, Inc. | $1,570,164 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. MLMD, LLC | 2. Grayson Carter & Son Contracting, Inc. | 3. Rogers Group, Inc. | 4. Apac-Alabama, Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 3 acres) (201A002) | LS | 1 | $24,000 | $24,000 | $24,000 | $24,000 |
| 0020 | Removing concrete sidewalk (206C000) | SY | 9 | $40.00 | $53.84 | $77.00 | $91.07 |
| 0030 | Removing pipe (206D000) | LF | 77 | $50.00 | $17.60 | $25.00 | $15.10 |
| 0040 | Removing headwalls (206E000) | EACH | 5 | $200.00 | $200.64 | $450.00 | $356.90 |
| 0050 | Unclassified excavation (210A000) | CY | 5,993 | $18.00 | $19.42 | $22.00 | $31.58 |
| 0060 | Borrow excavation (loose truckbed measurement) (210D001) | CY | 5,485 | $23.00 | $17.83 | $30.50 | $23.20 |
| 0070 | Structure excavation (214A000) | CY | 14 | $30.00 | $138.97 | $8.00 | $20.98 |
| 0080 | Foundation backfill, commercial (214B001) | CY | 2 | $120.00 | $67.09 | $85.00 | $205.56 |
| 0090 | Roadbed stabilizing material, crushed aggregate base (231B005) | TON | 863 | $43.00 | $61.76 | $47.00 | $46.65 |
| 0100 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 5,226 | $15.00 | $16.83 | $10.50 | $12.57 |
| 0110 | Bituminous treatment A (401A000) | SY | 5,226 | $1.44 | $1.44 | $0.85 | $1.43 |
| 0120 | Tack coat (405A000) | GAL | 1,254 | $4.82 | $4.42 | $3.00 | $4.80 |
| 0130 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 17,909 | $1.93 | $1.85 | $1.15 | $1.91 |
| 0140 | Material remixing device (410H000) | EACH | 1 | $12,996 | $8,006.80 | $60,000 | $67,640 |
| 0150 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 1,893 | $95.84 | $110.10 | $82.00 | $95.38 |
| 0160 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 758 | $80.14 | $97.58 | $71.00 | $79.76 |
| 0170 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 200 | $135.82 | $138.78 | $133.00 | $135.16 |
| 0180 | Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424B657) | TON | 500 | $119.22 | $114.57 | $95.00 | $118.66 |
| 0190 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 758 | $78.68 | $97.58 | $71.00 | $78.30 |
| 0200 | 12" roadway pipe (class 3 R.C.) (extension) (530A099) | LF | 39 | $120.00 | $150.83 | $96.00 | $98.37 |
| 0210 | 18" roadway pipe (class 3 R.C.) (extension) (530A101) | LF | 12 | $150.00 | $244.94 | $135.00 | $240.03 |
| 0220 | 24" side drain pipe (class 3 R.C.) (535A085) | LF | 32 | $160.00 | $125.36 | $103.00 | $116.72 |
| 0230 | 30" side drain pipe (class 3 R.C.) (535A086) | LF | 45 | $185.00 | $155.41 | $106.00 | $139.96 |
| 0240 | Mobilization (600A000) | LS | 1 | $65,000 | $125,089 | $164,880 | $189,603 |
| 0250 | Filter blanket, geotextile (610D003) | SY | 170 | $5.00 | $12.70 | $4.00 | $7.58 |
| 0260 | Concrete sidewalk, 4" thick (618A000) | SY | 56 | $65.00 | $156.36 | $98.00 | $85.83 |
| 0270 | Detectable warning surface (618C001) | SF | 70 | $70.00 | $62.44 | $7.00 | $46.86 |
| 0280 | 12" roadway pipe end treatment, class 1 (619A000) | EACH | 2 | $1,400.00 | $1,287.08 | $1,800.00 | $1,595.10 |
| 0290 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 1 | $1,600.00 | $1,393.67 | $2,050.00 | $1,501.39 |
| 0300 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 2 | $1,800.00 | $1,500.29 | $2,000.00 | $1,520.04 |
| 0310 | 30" roadway pipe end treatment, class 1 (619A004) | EACH | 2 | $2,200.00 | $1,606.88 | $2,100.00 | $1,798.64 |
| 0320 | Topsoil (650A000) | CY | 1,225 | $25.00 | $24.85 | $31.00 | $29.17 |
| 0330 | Solid sodding (654A000) | SY | 12,322 | $8.00 | $7.09 | $7.50 | $10.57 |
| 0340 | Silt fence (665J002) | LF | 3,092 | $6.00 | $4.87 | $4.25 | $3.04 |
| 0350 | Silt fence removal (665O001) | LF | 3,092 | $2.00 | $2.51 | $1.50 | $1.23 |
| 0360 | Wattle (665Q002) | LF | 510 | $10.00 | $11.73 | $6.00 | $9.46 |
| 0370 | Geometric controls (680A001) | LS | 1 | $20,000 | $11,481 | $81,999 | $60,409 |
| 0380 | Construction fuel (maximum bid limited to $ 73,200.00) (698A000) | LS | 1 | $73,200 | $0.01 | $0.00 | $0.01 |
| 0390 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 2 | $4,468.09 | $4,642.11 | $4,200.00 | $4,933.34 |
| 0400 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,468.09 | $4,642.11 | $4,200.00 | $4,933.34 |
| 0410 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 2 | $2,904.26 | $4,122.64 | $2,730.00 | $3,206.68 |
| 0420 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 290 | $2.13 | $2.22 | $2.00 | $2.35 |
| 0430 | Broken temporary traffic stripe (701C000) | MI | 3 | $1,090.43 | $1,132.90 | $1,025.00 | $1,203.97 |
| 0440 | Solid temporary traffic stripe (701C001) | MI | 5 | $1,117.03 | $1,160.52 | $1,050.00 | $1,233.33 |
| 0450 | Dotted temporary traffic stripe (701F000) | LF | 290 | $0.22 | $0.23 | $0.20 | $0.23 |
| 0460 | Broken yellow, class 2, type A traffic stripe (5" wide) (701G256) | LF | 1,955 | $1.07 | $1.10 | $1.00 | $1.17 |
| 0470 | Traffic control markings, class 2, type A (703A002) | SF | 3,438 | $5.85 | $6.08 | $5.50 | $6.46 |
| 0480 | Traffic control legends, class 2, type A (703B002) | SF | 90 | $6.38 | $6.64 | $6.00 | $7.05 |
| 0490 | Temporary traffic control markings (703D001) | SF | 121 | $2.66 | $2.76 | $2.50 | $2.94 |
| 0500 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 23 | $5.85 | $6.08 | $5.50 | $6.46 |
| 0510 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 482 | $5.85 | $6.08 | $5.50 | $6.46 |
| 0520 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 196 | $5.85 | $6.08 | $5.50 | $6.46 |
| 0530 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 242 | $5.85 | $6.08 | $5.50 | $6.46 |
| 0540 | Removal of existing traffic control unit (partial) ( SR-184 (second street) at firestone avenue) (730A012) | LS | 1 | $3,000.00 | $3,150.00 | $2,850.00 | $3,523.81 |
| 0550 | Furnishing and installing traffic control unit ( SR-184 (second street) at firestone avenue) (730C000) | LS | 1 | $5,000.00 | $5,250.00 | $4,750.00 | $5,873.02 |
| 0560 | Traffic signal junction box type S1 (730K001) | EACH | 1 | $500.00 | $525.00 | $475.00 | $587.31 |
| 0570 | 2", non-metallic, conduit (730L005) | LF | 75 | $15.00 | $15.75 | $14.25 | $17.62 |
| 0580 | Pedestrian signal head, type LED (730P100) | EACH | 2 | $1,000.00 | $1,050.00 | $950.00 | $1,174.61 |
| 0590 | Miscellaneous equipment, pedestrian push button (730Q001) | EACH | 2 | $2,500.00 | $2,625.00 | $2,375.00 | $2,936.51 |
| 0600 | Miscellaneous equipment, pedestal pole and foundation (730Q005) | EACH | 1 | $3,000.00 | $3,150.00 | $2,850.00 | $3,523.81 |
| 0610 | Radar detection system ( SR-184 (second street) at firestone avenue) (730U400) | LS | 1 | $36,000 | $37,800 | $34,200 | $42,286 |
| 0620 | Construction signs (740B000) | SF | 477 | $10.00 | $6.67 | $6.00 | $7.05 |
| 0630 | Channelizing drums (740D000) | EACH | 74 | $60.00 | $26.57 | $20.00 | $70.42 |
| 0640 | Cones (36 inches high) (740E000) | EACH | 50 | $20.00 | $56.85 | $5.00 | $32.01 |
| 0650 | Barricades, type III (740F002) | EACH | 4 | $500.00 | $233.10 | $275.00 | $323.02 |
| 0660 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 1 | $5,000.00 | $2,598.75 | $500.00 | $640.16 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of June 27, 2025. Compiled by Mirage Metrics.