The Bridge Builders of Alabama, LLC: ALDOT bid record
The Bridge Builders of Alabama, LLC submitted 18 bids on Alabama DOT contracts in the data, from 25 MAR 2022 to 07 NOV 2025, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $20,074,072
- Latest bid
- 07 NOV 2025
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 1 | 20% |
| 2023 | 6 | 2 | 33% |
| 2024 | 4 | 1 | 25% |
| 2025 | 3 | 1 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 1008 | 2 | 0 | 0% |
| 0202 | 2 | 1 | 50% |
| 0301 | 2 | 0 | 0% |
| 0201 | 1 | 0 | 0% |
| 0802 | 1 | 0 | 0% |
| 0603 | 1 | 0 | 0% |
| 0504 | 1 | 1 | 100% |
| 0502 | 1 | 0 | 0% |
| 0606 | 1 | 0 | 0% |
| 0104 | 1 | 1 | 100% |
| 0605 | 1 | 0 | 0% |
| 0401 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bridge substructure concrete | 510A007 | CY | 17 | 11 (65%) | $800.00 | $1,377.50 |
| Temporary seeding | 665A000 | ACRE | 16 | 8 (50%) | $611.94 | $900.00 |
| Construction signs | 740B000 | SF | 18 | 7 (39%) | $7.59 | $7.00 |
| Pavement markers, class A-H, type 2-D | 705A037 | EACH | 16 | 7 (44%) | $11.05 | $6.05 |
| Topsoil | 650A000 | CY | 15 | 7 (47%) | $33.45 | $45.00 |
| Guardrail end anchor, type 20 series (MASH) | 630C080 | EACH | 16 | 6 (38%) | $3,794.36 | $3,785.66 |
| Silt fence removal | 665O001 | LF | 15 | 6 (40%) | $1.30 | $1.45 |
| Portable changeable message sign, type 2 | 742A001 | EACH | 11 | 6 (55%) | $4,600.00 | $4,210.53 |
| Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) | 710B021 | LF | 11 | 6 (55%) | $18.40 | $20.21 |
| Wattle | 665Q002 | LF | 15 | 5 (33%) | $10.93 | $10.75 |
| Reinforced cement concrete bridge end slab | 450B000 | SY | 14 | 5 (36%) | $250.00 | $264.40 |
| Steel beam guardrail, class A, type 2 | 630A001 | LF | 13 | 5 (38%) | $32.10 | $29.12 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| McInnis Construction, LLC | 11 | 3 of 11 |
| Wright Brothers Construction Company, Inc. | 7 | 0 of 7 |
| Murphree Bridge Corporation | 7 | 7 of 7 |
| Miller & Miller, Inc. | 5 | 1 of 5 |
| Riley Bridge Company, Inc. | 4 | 4 of 4 |
| Ikaros, LLC | 4 | 2 of 4 |
| Newell & Bush, Inc. | 3 | 1 of 3 |
| Glasgow Construction Co., Inc. | 2 | 1 of 2 |
| Century Construction Group, Inc. | 2 | 1 of 2 |
| Dement Construction Company, LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 NOV 2025 | 20251107053 | 0301 | BRIDGE REPLACEMENT AND BRIDGE REHABILITATION ON OLD BROOK TRAIL OVER LITTLE SHADES CREEK (SITE 1) AND ON CANTERBURY ROAD OVER WATKINS CREEK | 2 of 2 | $4,100,000 | +3.0% |
| 27 JUN 2025 | 20250627001 | 03 | BRIDGE REPLACEMENT AND APPROACHES (GRADE, DRAIN, PAVE) ON SR-53 OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER | 1 of 4 | $3,680,342 | Low, 1.0% under the second |
| 28 MAR 2025 | 20250328001 | 0301 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-119 OVER SHEPHARD BRANCH | 2 of 4 | $5,128,923 | +36% |
| 08 NOV 2024 | 20241108013 | 0405 | BRIDGE REPLACEMENT AND APPROACHES ON CR-303 (BERNEY STATION ROAD) OVER DRY CREEK SOUTH OF TALLADEGA | 3 of 4 | $2,188,240 | +9.0% |
| 30 AUG 2024 | 20240830002 | 0202 | BRIDGE REPLACEMENT AND APPROACHES ON SR-247 OVER LITTLE BEAR CREEK NORTHEAST OF RED BAY | 3 of 4 | $3,679,306 | +11% |
| 28 JUN 2024 | 20240628021 | 0305 | BRIDGE REPLACEMENT BRIDGE REPLACEMENT ON CR-55 OVER THE CENTRAL OF GEORGIA RAILWAY SOUTH OF STERRETT | 1 of 2 | $3,237,197 | Low, 20% under the second |
| 29 MAR 2024 | 20240329004 | 0401 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-50 OVER WIND CREEK NORTHWEST OF REELTOWN | 2 of 3 | $3,537,766 | +4.0% |
| 03 NOV 2023 | 20231103001 | 0605 | BRIDGE REPLACEMENT ON SR-14 AT BLUE GURTH SWAP EAST OF SELMA | 2 of 4 | $3,560,741 | +5.0% |
| 28 JUL 2023 | 20230728041 | 0104 | BRIDGE REPLACEMENT ON CR-1009 (THOMAS LANE) OVER LITTLE PAINT CREEK SOUTHEAST OF WOODVILLE | 1 of 2 | $359,515 | Low, 5.0% under the second |
| 26 MAY 2023 | 20230526030 | 0606 | BRIDGE REPLACEMENT AND APPROACHES ON SEALE ROAD OVER COCHGALECHEE CREEK IN PHENIX CITY | 2 of 2 | $2,294,026 | +13% |
| 07 APR 2023 | 20230407017 | 0502 | BRIDGE REPLACEMENTS AND APPROACHES ON CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK AND OVER AN UNNAMED TRIBUTARY TO BINION CREEK WEST OF SAMA | 3 of 4 | $2,463,561 | +9.0% |
| 27 JAN 2023 | 20230127005 | 1008 | BRIDGE REPLACEMENT AND APPROACHES ON SMITH CHAPEL ROAD OVER MILL CREEK EAST OF CARBON HILL | 2 of 3 | $1,972,823 | +12% |
| 27 JAN 2023 | 20230127008 | 0504 | BRIDGE REPLACEMENTS ON SR-5 OVER BLUE GIRTH CREEK AND BLUE GIRTH CREEK RELIEF | 1 of 4 | $8,357,549 | Low, 13% under the second |
| 29 JUL 2022 | 20220729001 | 0202 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-247 OVER CEDAR CREEK | 1 of 6 | $4,439,469 | Low, 12% under the second |
| 24 JUN 2022 | 20220624035 | 0603 | INTERSECTION IMPROVEMENTS (CONCRETE PAVE, SIGNS & STRIPE) ON SR-152 (NORTHERN BOULEVARD) AT JACKSON FERRY ROAD IN MONTGOMERY | 4 of 4 | $4,648,364 | +44% |
| 27 MAY 2022 | 20220527001 | 0802 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-5 OVER MUD CREEK | 4 of 4 | $5,635,847 | +14% |
| 25 MAR 2022 | 20220325001 | 1008 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK | 3 of 7 | $2,499,585 | +12% |
| 25 MAR 2022 | 20220325055 | 0201 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON CR-16 OVER CYPRESS CREEK NORTHWEST OF FLORENCE | 4 of 8 | $5,436,734 | +9.0% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.