ALDOT letting results, March 25, 2022

23 contracts let by Alabama DOT on March 25, 2022, $155,696,084 in low bids, a median of 2 bidders per contract.

Owner
Alabama DOT
Contracts
23
Low bids, total
$155,696,084
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20220325062GRADING, DRAINAGE, PAVEMENT, AND BRIDGE ON SR-303 (LINDEN BYPASS) FROM 1.140 MILES SOUTH OF SR-13 (US-43) AND SR-69 TO THE JUNCTION OF SR-28 IN LINDEN08022W. S. Newell & Sons, Inc.$55,683,517$58,720,712+5.0%ALDOT
20220325020ADDITIONAL LANES (GRADE, DRAIN, PAVEMENT, SIGNALS, & SIGNS) ON SR-210 FROM SOUTH OF MEADOWBROOK DR TO NORTH OF NORTH CHEROKEE AVE & ON SR-53 FROM GIRLAND AVE TO07012Midsouth Paving, Inc.$42,472,427$49,897,460+17%ALDOT
20220325026SAFETY WIDENING, RESRUFACING, BRIDGE RAIL RETROFIT, & STRIPE ON SR-275/SR-21 FROM SOUTH OF SHOCCO SPRINGS ROAD IN TALLADEGA TO NORTH OF CR-91/CR-321 (STOCKDALE 04052Vulcan Materials Asphalt and Construction,$9,657,604$12,883,832+33%ALDOT
20220325011PLANING, RESURFACING, AND TRAFFIC STRIPE ON I-565 FROM 0.260 MILE EAST OF THE TRIANA BOULEVARD OVERPASS TO 0.450 MILE EAST OF THE SR-2 (US-72) INTERCHANGE01024Wiregrass Construction Company, Inc.$5,384,000$6,130,855+14%ALDOT
20220325055BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON CR-16 OVER CYPRESS CREEK NORTHWEST OF FLORENCE02018Riley Bridge Company, Inc.$4,969,804$5,076,922+2.0%ALDOT
20220325019MICRO-MILLING, RESURFACING, ACCESS MANAGEMENT, AND STRIPE ON SR-53 (US-231) FROM THE JUNCTION OF SR-123 TO THE JUNCTION OF SR-27 IN OZARK07042Wiregrass Construction Company, Inc.$3,972,960$5,441,070+37%ALDOT
20220325004PEDESTRIAN BRIDGE (GRADING, BRIDGE, AND LIGHTING) OVER SR-150 BETWEEN BERKLEY AVENUE AND CLARENDON AVENUE IN BESSEMER03012Wright Brothers Construction Company, Inc.$3,333,211$3,443,798+3.0%ALDOT
20220325017RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE CHILTON COUNTY LINE TO 0.800 MILE WEST OF THE JUNCTION OF CR-4006013Asphalt Contractors, Inc.$3,201,265$3,344,569+4.0%ALDOT
20220325029MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM 0.300 MILE SOUTH OF THE JUNCTION OF CR-61 TO 0.110 MILE SOUTH OF THE INTERSECTION OF SR-2 (02012Rogers Group, Inc.$2,797,500$3,100,719+11%ALDOT
20220325023SAFETY WIDENING, BRIDGE GUARDRAIL RETRO, GUARDRAIL, & STRIPE ON SR-21 (US-231) FROM THE JUNCTION OF CR-59 NORTH OF ROCKFORD TO THE JUNCTION OF CR-7504011Gary Ingram Grading & Paving, Inc.$2,699,822ALDOT
20220325010MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON I-359 FROM THE JUNCTION OF THE I-20/I-59 INTERCHANGE TO THE JUNCTION OF THE 15TH STREET OVERPASS 05022Midsouth Paving, Inc.$2,422,307$2,509,224+4.0%ALDOT
20220325018MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE JUNCTION OF 12 LINK ROAD TO THE JUNCTION SR-8 (US-80) IN DEMOPOLIS08021S. T. Bunn Construction Company, Inc.$2,332,185ALDOT
20220325001BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK10087Glasgow Construction Co., Inc.$2,228,083$2,490,686+12%ALDOT
20220325033MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-68 (US-411 BYPASS ) FROM THE JUNCTION OF SR-25 IN CENTRE TO THE JUNCTION OF SR-28301052Wiregrass Construction Company, Inc.$2,044,346$2,155,840+5.0%ALDOT
20220325035PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-88 FROM SR-12 (US-84) TO SR-167 (SITE 1) AND ON SR-134 FROM SR-88 TO SR- 12 (US-84) (SITE 2)07022Wiregrass Construction Company, Inc.$2,041,387$2,775,735+36%ALDOT
20220325014PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM 0.600 MILE NORTH OF THE HOUSTON COUNTY LINE TO THE BAY LINE RAILROAD CROSSING IN HEADLAND07012Midsouth Paving, Inc.$2,002,969$2,320,949+16%ALDOT
20220325030MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-27 FROM THE FLORIDA STATE LINE TO THE JUNCTION OF SR-52 IN GENEVA07022Wiregrass Construction Company, Inc.$1,938,522$2,511,779+30%ALDOT
20220325040SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-85 FROM THE JUNCTION OF SR-92 IN CLAYHATCHEE TO THE INTERSECTION OF SR-12 (US-84) IN DALEVILLE07042Wiregrass Construction Company, Inc.$1,796,753$2,255,824+26%ALDOT
20220325059ROADWAY IMPROVEMENTS (ACCESS MANAGEMENT) ON SR-1 FROM FOX RUN PKWAY TO UNIRORAL RD TO INCLUDE LEFT TURN LANE, ACCESS MANAGEMENT MODIFICATIONS, & SIGNAL UPGRADES07011McElhenney Construction Co., LLC$1,486,672ALDOT
20220325043RESURFACING, GUARDRAIL SAFETY IMPROVEMENTS, AND STRIPE ON SR-53 (US-231) FROM THE SHELBY COUNTY LINE TO THE JUNCTION OF SR-34 IN PELL CITY03021Whitaker Contracting Corporation$1,255,977ALDOT
20220325007INTERSECTION SAFETY IMPROVEMENTS (INTERSECTION CONVERSION) ON SR-134 AT CR-460 AND CR-461 EAST OF OPP07024Grady Ralls & Sons, Inc.$857,495$867,199+1.0%ALDOT
20220325058INTERSECTION IMPROVEMENTS, TURN LANE INSTALL, TRAFFIC STRIPE ON SR-52 AT THE INTERSECTION OF CR-69 IN HARTFORD07042Wiregrass Construction Company, Inc.$825,811$1,062,545+29%ALDOT
20220325047SAFETY IMPROVEMENTS (CURB RAMP INSTALLATIONS) ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE SOUTHWEST REGION AS INDICATED IN THE PLANS09013McElhenney Construction Co., LLC$291,469$294,863+1.0%ALDOT
ALDOT contracts let on March 25, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy