Whitaker Contracting Corporation: ALDOT bid record
Whitaker Contracting Corporation submitted 68 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 26 APR 2024, and was the low bidder on 47 of them (69%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $108,877,507
- Latest bid
- 26 APR 2024
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 18 | 13 | 72% |
| 2023 | 31 | 25 | 81% |
| 2024 | 19 | 9 | 47% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0302 | 13 | 11 | 85% |
| 0103 | 10 | 6 | 60% |
| 0104 | 9 | 7 | 78% |
| 0105 | 7 | 5 | 71% |
| 0301 | 4 | 2 | 50% |
| 0504 | 3 | 3 | 100% |
| 0602 | 3 | 3 | 100% |
| 0204 | 3 | 2 | 67% |
| 0202 | 2 | 0 | 0% |
| 0505 | 2 | 1 | 50% |
| 0606 | 2 | 1 | 50% |
| 05, 0505 | 1 | 1 | 100% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 52 | 14 of 52 |
| Rogers Group, Inc. | 14 | 7 of 14 |
| Vulcan Materials Asphalt and Construction, | 9 | 1 of 9 |
| Dunn Construction Company, Inc. | 4 | 0 of 4 |
| Chilton Contractors, Inc. | 4 | 1 of 4 |
| Grayson Carter & Son Contracting, Inc. | 4 | 2 of 4 |
| Asphalt Paving Systems Inc | 4 | 3 of 4 |
| Alabama Grading & Excavation, LLC. | 3 | 0 of 3 |
| Wright Brothers Construction Company, Inc. | 3 | 1 of 3 |
| Carcel & G. Construction, LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 APR 2024 | 20240426016 | 0606 | RESURFACING (MICRO-SURFACING SEAL COAT, TYPE II) AND STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF OLD SEALE HIGHWAY TO THE JUNCTION OF MAGNO | 2 of 3 | $2,685,247 | +15% |
| 26 APR 2024 | 20240426017 | 0301 | RESURFACE (MICRO-SURFACING ), GUARDRAIL INSTALL, AND STRIPE ON SR-7 (US-11) FROM THE INTERSECTION OF SR-75 IN ROEBUCK TO THE I-459 INTERCHAN | 2 of 3 | $970,018 | +8.0% |
| 26 APR 2024 | 20240426025 | 0104, 0105 | MICRO-MILL, RESURFACE (SCRUB SEAL), GUARDRAIL, AND STRIPE ON SR-179 FROM THE JUNCTION OF SR-74 (US-278) TO THE JUNCTION OF SR-168 SOUTHWEST | 2 of 3 | $3,277,400 | +1.0% |
| 26 APR 2024 | 20240426028 | 0505 | RESURFACING, GUARDRAIL RESET, AND TRAFFIC STRIPE ON SR-60 FROM THE JUNCTION OF SR-14 IN WEDGEWORTH TO THE JUNCTION OF SR-69 | 2 of 3 | $1,880,145 | +16% |
| 29 MAR 2024 | 20240329023 | 0504 | SCRUB SEAL & MICRO-SURFACING SEAL COAT, TYPE II AND III ON SR-6 (US-82) FROM THE SR-25 OVERPASS TO SR-382 EAST OF CENTREVILLE TO INCLUDE SR- | 1 of 2 | $1,764,436 | Low, 16% under the second |
| 29 MAR 2024 | 20240329034 | 1001 | RESURFACE (MICRO-SURFACING SEAL COAT, TYPE II SCRUB SEAL) ON SR-159 FROM THE PICKENS COUNTY LINE TO THE JUNCTION OF SR-171 IN FAYETTE | 1 of 2 | $1,834,703 | Low, 18% under the second |
| 23 FEB 2024 | 20240223004 | 0103 | ROADWAY IMPROVEMENTS/RECONSTRUCTION ON I-59 FROM A POINT NORTH OF THE SR-117 INTERCHANGE (MP 233.350) TO THE GEORGIA STATE LINE | 3 of 4 | $46,468,001 | +14% |
| 23 FEB 2024 | 20240223012 | 0105 | SAFETY WIDENING, RESURFACING (SCRUB SEAL), AND STRIPE SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE | 1 of 4 | $2,267,953 | Low, 2.0% under the second |
| 23 FEB 2024 | 20240223017 | 0104 | MICRO-MILL, RESURFACE, GUARDRAIL INSTALLATION, AND STRIPE ON SR-75 FROM THE INTERSECTION OF SR-1 (US-431) TO THE JUNCTION OF GARY ROAD | 2 of 2 | $3,317,634 | +4.0% |
| 23 FEB 2024 | 20240223021 | 0302 | RESURFACING (SURFACE TREATMENT), GUARDRAIL, AND STRIPE ON SR-25 (US-411) FROM THE JEFFERSON COUNTY LINE TO THE JUNCTION OF CHURCH STREET IN | 1 of 2 | $1,308,711 | Low, 43% under the second |
| 23 FEB 2024 | 20240223022 | 0305 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-76 FROM THE JUNCTION OF SR-25 IN HARPERVILLE TO THE JUNCTION OF SR-38 (US-280) | 2 of 3 | $735,161 | 0.0% |
| 23 FEB 2024 | 20240223029 | 0301 | RESURFACE, GUARDRAIL, STEEL BLOCK OUT REPLACEMENT, & STRIPE ON SR-269 FROM THE WCL OF BIRMINGHAM (MP 1.959) TO THE JUNCTION OF OLD MULGA LOO | 1 of 2 | $1,934,943 | Low, 20% under the second |
| 23 FEB 2024 | 20240223035 | 0202 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN PRICEVILLE AS INDICATED IN THE PLANS | 4 of 4 | $1,585,476 | +45% |
| 26 JAN 2024 | 20240126001 | 0302 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER NORTHEAST OF LOCUST FORK | 1 of 5 | $9,178,023 | Low, 17% under the second |
| 26 JAN 2024 | 20240126012 | 0603 | RESURFACE (SCRUB SEAL & MICRO-SURFACING SEAL COAT, TYPE II) ON SR-9 (US-331) FROM 0.500 MILE SOUTH OF THE INTERSECTION OF CR-24 TO 0.400 MIL | 1 of 2 | $2,975,785 | Low, 22% under the second |
| 26 JAN 2024 | 20240126015 | 0105 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-35 FROM THE JUNCTION OF SR-273 TO THE DEKALB COUNTY LINE | 2 of 2 | $1,289,476 | +32% |
| 26 JAN 2024 | 20240126028 | 0103 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-71 FROM THE JUNCTION OF SR-35 IN SECTION TO THE JUNCTION OF CR-378 NORTHEA | 3 of 3 | $2,036,271 | +9.0% |
| 26 JAN 2024 | 20240126029 | 0602 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-110 FROM 0.400 MILE EAST OF THE JUNCTION OF CR-7 TO THE JUNCTION OF SR-6 (US-82) | 1 of 2 | $1,381,359 | Low, 27% under the second |
| 26 JAN 2024 | 20240126035 | 0601 | RESURFACING, TRAFFIC STRIPE, AND TRAFFIC SIGN IMPROVEMENTS ON SR-14 FROM THE JUNCTION OF SR-63 TO THE JUNCTION OF SR-229 IN TALLASSEE | 1 of 2 | $1,252,756 | Low, 8.0% under the second |
| 08 DEC 2023 | 20231208024 | 0204 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-67 FROM 0.610 MILE SOUTH OF THE JUNCTION OF CRAWFORD ROAD TO 0.380 MILE SOUTH OF THE JU | 1 of 4 | $1,077,534 | Low, 3.0% under the second |
| 08 DEC 2023 | 20231208028 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-7 (US-11) FROM THE ETOWAH COUNTY LINE TO THE JUNCTION OF LYKES LANE IN COLLINSVILLE | 1 of 2 | $1,585,129 | Low, 17% under the second |
| 08 DEC 2023 | 20231208029 | 0602 | RESURFACE (MICRO-SURFACE SEAL COAT, TYPE II & III), & STRIPE ON SR-15 (US-29) FROM THE JUNCTION OF SR-186 NORTHEAST OF TUSKEGEE TO THE LEE C | 1 of 2 | $950,921 | Low, 12% under the second |
| 08 DEC 2023 | 20231208030 | 0504 | RESURFACE (MICRO-SURFACE SEAL COAT, TYPE II & III) & STRIPE ON SR-25 FROM THE HALE COUNTY LINE TO THE JUNCTION OF SR- 5 SOUTHWEST OF BRENT | 1 of 2 | $1,559,607 | Low, 26% under the second |
| 08 DEC 2023 | 20231208033 | 1008 | RESURFACE (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, & STRIPE ON SR-69 FROM THE JUNCTION OF SR-5 IN JASPER TO THE NORTH END OF THE BLACKWATER | 1 of 3 | $2,845,098 | Low, 12% under the second |
| 08 DEC 2023 | 20231208034 | 0104 | MICRO-MILL, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-69 FROM THE JUNCTION OF HOLBROOK DRIVE NORTHEAST OF ARAB TO THE JUNCTION O | 1 of 3 | $4,088,696 | Low, 22% under the second |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.