Carcel & G. Construction, LLC: ALDOT bid record

Carcel & G. Construction, LLC submitted 31 bids on Alabama DOT contracts in the data, from 25 FEB 2022 to 27 MAR 2026, and was the low bidder on 6 of them (19%). When it was not low, its total sat a median +20% above the low bid.

Owner
Alabama DOT
Low bid volume
$35,567,804
Latest bid
27 MAR 2026
Data through
28 AUG 2026
31Bids
6Low bids
19Win rate, percent
+20%Median gap to the low bid when not low, 25 bids

By year

YearBidsLow bidsWin rate
20225240%
2023500%
20247114%
202512325%
2026200%
Carcel & G. Construction, LLC, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
03018225%
01053133%
0201300%
05023133%
0505200%
1009200%
0305100%
0201, 020211100%
0402100%
0302100%
0903100%
0204100%
Carcel & G. Construction, LLC, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Topsoil650A000CY2615 (58%)$24.80$45.00
Temporary seeding665A000ACRE2612 (46%)$665.27$900.00
Removing pipe206D000LF2212 (55%)$17.77$31.83
Barricades, type III740F002EACH2611 (42%)$236.71$252.14
Temporary mulching665B001TON2610 (38%)$544.26$545.62
Structure excavation214A000CY2610 (38%)$18.36$25.00
Portable sequential arrow and chevron sign unit741C010EACH2010 (50%)$2,204.60$1,597.10
Unclassified excavation210A000CY289 (32%)$30.83$32.97
24" roadway pipe end treatment, class 1619A003EACH159 (60%)$2,440.12$2,297.24
Channelizing drums740D000EACH278 (30%)$44.08$33.00
Silt fence removal665O001LF258 (32%)$1.20$1.45
Removing headwalls206E000EACH168 (50%)$471.04$663.82
Carcel & G. Construction, LLC, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Carcel & G. Construction, LLC, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
27 MAR 2026202603270470702MAINTENANCE STRUCTURAL REMOVAL ON SR-52 FROM A POINT WEST OF THE INTERSECTION OF 2ND AVENUE TO A POINT EAST OF THE JUNCTION OF COX STREET8 of 9$449,660+70%
30 JAN 2026202601300010105BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE G2 of 6$5,511,862+13%
05 DEC 2025202512050020201BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, LIGHTING, & BRIDGE) ON SR-2 (US-72) OVER SR-20 IN FLORENCE2 of 3$7,788,353+7.0%
05 DEC 2025202512050080201ROADWAY AND SAFETY (PEDESTRIAN MODIFICATIONS) IMPROVEMENTS ON RICKWOOD ROAD FROM THE JUNCTION OF CHISHOLM ROAD TO THE INTERSECTION OF SR-17 3 of 5$2,836,287+8.0%
26 SEP 2025202509260061001BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND TRAFFIC STRIPE) ON SR-118 OVER BOGUE CREEK IN SULLIGENT1 of 2$5,675,116Low, 20% under the second
26 SEP 2025202509260200502CLEARING ON I-20/I-59 FROM EXIT 76 INTERCHANGE (MP 75.800) TO THE JEFFERSON COUNTY LINE3 of 4$3,213,209+19%
29 AUG 2025202508290090301DRAINAGE IMPROVEMENTS AND PIPE REHABILITATION ON I-459 FROM A POINT NEAR MP 19.280 TO A POINT NEAR MP 19.394 SOUTHEAST OF VESTAVIA HILLS4 of 5$786,642+28%
29 AUG 2025202508290220301RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER2 of 6$19,712,633+4.0%
25 JUL 2025202507250010301INTERCHANGE MODIFICATIONS ON SR-149 (LAKESHORE PARKWAY) AT THE I-65 INTERCHANGE IN HOMEWOOD2 of 7$25,109,472+7.0%
25 JUL 2025202507250240202BRIDGE CULVERT REPLACEMENT AND APPROACHES ON WEST MORGAN ROAD OVER BAKERS CREEK SOUTHWEST OF DECATUR4 of 6$1,506,408+21%
27 JUN 20252025062700103BRIDGE REPLACEMENT AND APPROACHES (GRADE, DRAIN, PAVE) ON SR-53 OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER3 of 4$3,932,613+7.0%
30 MAY 2025202505300040301BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK SOUTHEAST OF BESSEMER1 of 2$6,650,553Low, 9.0% under the second
30 MAY 2025202505300340204INTERSECTION IMPROVEMENTS ON VAUGHN BRIDGE ROAD AT SR-3 (US-31) IN HARTSELLE5 of 5$2,115,814+71%
31 JAN 2025202501310090301REPAIR AND REPLACEMENT OF ENTRANCE AND EXIT RAMPS ON I-20/I-59 AT MCASHAN DRIVE (EXIT 104) AND THE NORTHBOUND AND SOUTHBOUND RAMPS SOUTHWEST1 of 2$17,795,261Low, 10% under the second
06 DEC 2024202412060070301BRIDGE REPLACEMENT ON SR-23 AT A BRANCH OF LITTLE CANOE CREEK SOUTHEAST OF SPRINGVILLE4 of 4$4,698,846+18%
27 SEP 2024202409270451009VERTICAL REALIGN (GRADE, DRAIN, PAVE, RETAINING WALL, SIGNS) ON SR-74 (US-278) (WESTBOUND ROADWAY) FROM THE JUNCTION OF SR-13 TO THE JUNCTIO4 of 4$2,338,466+28%
27 SEP 2024202409270461009INTERSECTION IMPROVEMENTS ON SR-33 AT CR-24 TO INCLUDE A LEFT TURN LANE INSTALLATION ON CR-24 AND EXTENDING THE RIGHT TURN LANE ON SR-335 of 5$1,177,184+21%
30 AUG 2024202408300010502BRIDGE REMOVAL (GRADING, DRAINAGE, BASE, AND PAVEMENT) ON SR-7 (US-11) OVER THE ABANDONED L AND N RAILROAD NEAR CHAMBLEE AVENUE NORTHEAST OF1 of 6$2,134,529Low, 14% under the second
30 AUG 2024202408300250502ROADWAY IMPROVEMENTS (ADDITIONAL CENTER TURN LANE) ON CR-47 (MARTIN LUTHER KING, JR. BOULEVARD) FROM THE JUNCTION OF BRIDGE AVENUE TO THE JU3 of 5$17,814,165+25%
28 JUN 2024202406280180903ROADWAY IMPROVEMENTS/ADDITIONAL LANES ON SR-12 (US-84) FROM A POINT NEAR MP 96.300 TO THE I-65 INTERCHANGE IN EVERGREEN7 of 7$16,877,143+43%
26 JAN 2024202401260010302BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER NORTHEAST OF LOCUST FORK2 of 5$10,747,694+17%
28 APR 2023202304280320505INTERSECTION IMPROVEMENTS TO INCLUDE ROADWAY IMPROVEMENTS ON SR-5 AT CR-1 (BEAR CREEK ROAD), AND ON CR-1 (BEAR CREEK ROAD) EAST OF SR-5 IN B2 of 4$841,939+10%
24 FEB 2023202302240010201ADDITIONAL LANES (GRADE, DRAIN, PAVE, SIGNALS, AND STRIPE) ON SR-2 (US 72/FLORENCE BOULEVARD) FROM THE JUNCTION OF CR-30 (INDIAN SPRINGS DRI2 of 3$28,803,149+20%
24 FEB 2023202302240580301STREETSCAPE IMPROVEMENTS 2ND AVENUE SOUTH; ON 27TH STREET SOUTH; AND ON 29TH STREET SOUTH IN BIRMINGHAM5 of 5$3,781,025+46%
27 JAN 2023202301270040505BRIDGE REPLACMENTS AND APPROACHES ON CR-40 (GREER CREEK ROAD) OVER GREER CREEK AND A TRIBUTARY TO GREER CREEK4 of 5$1,721,295+31%
Carcel & G. Construction, LLC: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way