Carcel & G. Construction, LLC: ALDOT bid record
Carcel & G. Construction, LLC submitted 31 bids on Alabama DOT contracts in the data, from 25 FEB 2022 to 27 MAR 2026, and was the low bidder on 6 of them (19%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $35,567,804
- Latest bid
- 27 MAR 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 2 | 40% |
| 2023 | 5 | 0 | 0% |
| 2024 | 7 | 1 | 14% |
| 2025 | 12 | 3 | 25% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0301 | 8 | 2 | 25% |
| 0105 | 3 | 1 | 33% |
| 0201 | 3 | 0 | 0% |
| 0502 | 3 | 1 | 33% |
| 0505 | 2 | 0 | 0% |
| 1009 | 2 | 0 | 0% |
| 0305 | 1 | 0 | 0% |
| 0201, 0202 | 1 | 1 | 100% |
| 0402 | 1 | 0 | 0% |
| 0302 | 1 | 0 | 0% |
| 0903 | 1 | 0 | 0% |
| 0204 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Topsoil | 650A000 | CY | 26 | 15 (58%) | $24.80 | $45.00 |
| Temporary seeding | 665A000 | ACRE | 26 | 12 (46%) | $665.27 | $900.00 |
| Removing pipe | 206D000 | LF | 22 | 12 (55%) | $17.77 | $31.83 |
| Barricades, type III | 740F002 | EACH | 26 | 11 (42%) | $236.71 | $252.14 |
| Temporary mulching | 665B001 | TON | 26 | 10 (38%) | $544.26 | $545.62 |
| Structure excavation | 214A000 | CY | 26 | 10 (38%) | $18.36 | $25.00 |
| Portable sequential arrow and chevron sign unit | 741C010 | EACH | 20 | 10 (50%) | $2,204.60 | $1,597.10 |
| Unclassified excavation | 210A000 | CY | 28 | 9 (32%) | $30.83 | $32.97 |
| 24" roadway pipe end treatment, class 1 | 619A003 | EACH | 15 | 9 (60%) | $2,440.12 | $2,297.24 |
| Channelizing drums | 740D000 | EACH | 27 | 8 (30%) | $44.08 | $33.00 |
| Silt fence removal | 665O001 | LF | 25 | 8 (32%) | $1.20 | $1.45 |
| Removing headwalls | 206E000 | EACH | 16 | 8 (50%) | $471.04 | $663.82 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gillespie Construction, LLC | 9 | 4 of 9 |
| Ikaros, LLC | 7 | 1 of 7 |
| Rogers Group, Inc. | 7 | 6 of 7 |
| Vulcan Materials Asphalt and Construction, | 6 | 1 of 6 |
| McElhenney Construction Co., LLC | 6 | 3 of 6 |
| Wiregrass Construction Company, Inc. | 5 | 2 of 5 |
| Bulls Construction Group, LLC | 4 | 3 of 4 |
| Chilton Contractors, Inc. | 4 | 2 of 4 |
| Grayson Carter & Son Contracting, Inc. | 4 | 4 of 4 |
| Glasgow Construction Co., Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 MAR 2026 | 20260327047 | 0702 | MAINTENANCE STRUCTURAL REMOVAL ON SR-52 FROM A POINT WEST OF THE INTERSECTION OF 2ND AVENUE TO A POINT EAST OF THE JUNCTION OF COX STREET | 8 of 9 | $449,660 | +70% |
| 30 JAN 2026 | 20260130001 | 0105 | BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE G | 2 of 6 | $5,511,862 | +13% |
| 05 DEC 2025 | 20251205002 | 0201 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, LIGHTING, & BRIDGE) ON SR-2 (US-72) OVER SR-20 IN FLORENCE | 2 of 3 | $7,788,353 | +7.0% |
| 05 DEC 2025 | 20251205008 | 0201 | ROADWAY AND SAFETY (PEDESTRIAN MODIFICATIONS) IMPROVEMENTS ON RICKWOOD ROAD FROM THE JUNCTION OF CHISHOLM ROAD TO THE INTERSECTION OF SR-17 | 3 of 5 | $2,836,287 | +8.0% |
| 26 SEP 2025 | 20250926006 | 1001 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND TRAFFIC STRIPE) ON SR-118 OVER BOGUE CREEK IN SULLIGENT | 1 of 2 | $5,675,116 | Low, 20% under the second |
| 26 SEP 2025 | 20250926020 | 0502 | CLEARING ON I-20/I-59 FROM EXIT 76 INTERCHANGE (MP 75.800) TO THE JEFFERSON COUNTY LINE | 3 of 4 | $3,213,209 | +19% |
| 29 AUG 2025 | 20250829009 | 0301 | DRAINAGE IMPROVEMENTS AND PIPE REHABILITATION ON I-459 FROM A POINT NEAR MP 19.280 TO A POINT NEAR MP 19.394 SOUTHEAST OF VESTAVIA HILLS | 4 of 5 | $786,642 | +28% |
| 29 AUG 2025 | 20250829022 | 0301 | RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER | 2 of 6 | $19,712,633 | +4.0% |
| 25 JUL 2025 | 20250725001 | 0301 | INTERCHANGE MODIFICATIONS ON SR-149 (LAKESHORE PARKWAY) AT THE I-65 INTERCHANGE IN HOMEWOOD | 2 of 7 | $25,109,472 | +7.0% |
| 25 JUL 2025 | 20250725024 | 0202 | BRIDGE CULVERT REPLACEMENT AND APPROACHES ON WEST MORGAN ROAD OVER BAKERS CREEK SOUTHWEST OF DECATUR | 4 of 6 | $1,506,408 | +21% |
| 27 JUN 2025 | 20250627001 | 03 | BRIDGE REPLACEMENT AND APPROACHES (GRADE, DRAIN, PAVE) ON SR-53 OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER | 3 of 4 | $3,932,613 | +7.0% |
| 30 MAY 2025 | 20250530004 | 0301 | BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK SOUTHEAST OF BESSEMER | 1 of 2 | $6,650,553 | Low, 9.0% under the second |
| 30 MAY 2025 | 20250530034 | 0204 | INTERSECTION IMPROVEMENTS ON VAUGHN BRIDGE ROAD AT SR-3 (US-31) IN HARTSELLE | 5 of 5 | $2,115,814 | +71% |
| 31 JAN 2025 | 20250131009 | 0301 | REPAIR AND REPLACEMENT OF ENTRANCE AND EXIT RAMPS ON I-20/I-59 AT MCASHAN DRIVE (EXIT 104) AND THE NORTHBOUND AND SOUTHBOUND RAMPS SOUTHWEST | 1 of 2 | $17,795,261 | Low, 10% under the second |
| 06 DEC 2024 | 20241206007 | 0301 | BRIDGE REPLACEMENT ON SR-23 AT A BRANCH OF LITTLE CANOE CREEK SOUTHEAST OF SPRINGVILLE | 4 of 4 | $4,698,846 | +18% |
| 27 SEP 2024 | 20240927045 | 1009 | VERTICAL REALIGN (GRADE, DRAIN, PAVE, RETAINING WALL, SIGNS) ON SR-74 (US-278) (WESTBOUND ROADWAY) FROM THE JUNCTION OF SR-13 TO THE JUNCTIO | 4 of 4 | $2,338,466 | +28% |
| 27 SEP 2024 | 20240927046 | 1009 | INTERSECTION IMPROVEMENTS ON SR-33 AT CR-24 TO INCLUDE A LEFT TURN LANE INSTALLATION ON CR-24 AND EXTENDING THE RIGHT TURN LANE ON SR-33 | 5 of 5 | $1,177,184 | +21% |
| 30 AUG 2024 | 20240830001 | 0502 | BRIDGE REMOVAL (GRADING, DRAINAGE, BASE, AND PAVEMENT) ON SR-7 (US-11) OVER THE ABANDONED L AND N RAILROAD NEAR CHAMBLEE AVENUE NORTHEAST OF | 1 of 6 | $2,134,529 | Low, 14% under the second |
| 30 AUG 2024 | 20240830025 | 0502 | ROADWAY IMPROVEMENTS (ADDITIONAL CENTER TURN LANE) ON CR-47 (MARTIN LUTHER KING, JR. BOULEVARD) FROM THE JUNCTION OF BRIDGE AVENUE TO THE JU | 3 of 5 | $17,814,165 | +25% |
| 28 JUN 2024 | 20240628018 | 0903 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES ON SR-12 (US-84) FROM A POINT NEAR MP 96.300 TO THE I-65 INTERCHANGE IN EVERGREEN | 7 of 7 | $16,877,143 | +43% |
| 26 JAN 2024 | 20240126001 | 0302 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER NORTHEAST OF LOCUST FORK | 2 of 5 | $10,747,694 | +17% |
| 28 APR 2023 | 20230428032 | 0505 | INTERSECTION IMPROVEMENTS TO INCLUDE ROADWAY IMPROVEMENTS ON SR-5 AT CR-1 (BEAR CREEK ROAD), AND ON CR-1 (BEAR CREEK ROAD) EAST OF SR-5 IN B | 2 of 4 | $841,939 | +10% |
| 24 FEB 2023 | 20230224001 | 0201 | ADDITIONAL LANES (GRADE, DRAIN, PAVE, SIGNALS, AND STRIPE) ON SR-2 (US 72/FLORENCE BOULEVARD) FROM THE JUNCTION OF CR-30 (INDIAN SPRINGS DRI | 2 of 3 | $28,803,149 | +20% |
| 24 FEB 2023 | 20230224058 | 0301 | STREETSCAPE IMPROVEMENTS 2ND AVENUE SOUTH; ON 27TH STREET SOUTH; AND ON 29TH STREET SOUTH IN BIRMINGHAM | 5 of 5 | $3,781,025 | +46% |
| 27 JAN 2023 | 20230127004 | 0505 | BRIDGE REPLACMENTS AND APPROACHES ON CR-40 (GREER CREEK ROAD) OVER GREER CREEK AND A TRIBUTARY TO GREER CREEK | 4 of 5 | $1,721,295 | +31% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.