ALDOT letting results, September 26, 2025
19 contracts let by Alabama DOT on September 26, 2025, $55,021,908 in low bids, a median of 3 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 19
- Low bids, total
- $55,021,908
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20250926027 | ACCESS MANAGEMENT AND TRAFFIC SIGNAL UPGRADES ON DAUPHIN STREET FROM A POINT WEST OF THE I-65 INTERCHANGE TO THE INTERSECTION OF SAGE AVENUE IN MOBILE | 0901 | 3 | Wiregrass Construction Company, Inc. | $9,292,727 | $10,771,357 | +16% | ALDOT |
| 20250926005 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE REMOVAL) ON SR-14 OVER THE SIPSEY RIVER | 1003 | 3 | McInnis Construction, LLC | $8,191,559 | $8,340,543 | +2.0% | ALDOT |
| 20250926033 | RESURFACE, SIDEWALK INSTALL, AND INTERSECTION IMPROVEMENTS ON MAIN AVENUE FROM THE INTERSECTION OF 5TH STREET TO THE JUNCTION OF SR-6 (US-82/MCFARLAND BOULEVARD | 0502 | 4 | GFC Construction, Inc. | $6,565,076 | $6,792,064 | +3.0% | ALDOT |
| 20250926019 | MICRO-FINE MILLING, RESURFACE, GUARDRAIL, AND STRIPE ON I-20 FROM A POINT BEGINNING AT THE 6-LANE SECTION (MP 173.218) TO THE H J BENTLEY JR. PARKWAY OVERPASS ( | 0405 | 2 | Vulcan Materials Asphalt and Construction, | $6,434,033 | $7,562,982 | +18% | ALDOT |
| 20250926006 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND TRAFFIC STRIPE) ON SR-118 OVER BOGUE CREEK IN SULLIGENT | 1001 | 2 | Carcel & G. Construction, LLC | $5,675,116 | $6,793,374 | +20% | ALDOT |
| 20250926018 | MICRO-MILL, RESURFACE, GUARDRAIL, CONCRETE CLEAN, & STRIPE ON I-459 FROM THE SOUTH END OF THE BRIDGE OVER SR-150 TO THE NORTH END OF THE RAMPS AT SR-3 (US-31) | 0301 | 3 | Apac-Alabama, Inc. | $5,502,706 | $5,734,293 | +4.0% | ALDOT |
| 20250926020 | CLEARING ON I-20/I-59 FROM EXIT 76 INTERCHANGE (MP 75.800) TO THE JEFFERSON COUNTY LINE | 0502 | 4 | Bulls Construction Group, LLC | $2,693,567 | $2,930,260 | +9.0% | ALDOT |
| 20250926011 | STREETSCAPE AND SIDEWALK ENHANCEMENTS TO INCLUDE ADA UPGRADE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN BIRMINGHAM AS INDICATED IN THE PLANS | 0301 | 2 | South Dade Air Conditioning & Refrigeration, | $2,672,406 | $2,767,191 | +4.0% | ALDOT |
| 20250926017 | RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON I-20/I-59 FROM A POINT SOUTH OF THE FAIRFIELD BOULEVARD BRIDGE TO A POINT SOUTH OF THE VALLEY ROAD BRIDGE | 0301 | 3 | Dunn Construction Company, Inc. | $1,503,936 | $1,712,753 | +14% | ALDOT |
| 20250926035 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON MURPHY MILL ROAD FROM SR-605 TO SR-53 AND ON NORTH CHEROKEE AVENUE FROM SR-12 TO SR-53 IN DOTHAN | 0701 | 2 | Apac-Alabama, Inc. | $1,382,628 | $1,455,298 | +5.0% | ALDOT |
| 20250926010 | ROADWAY IMPROVEMENTS ON 22ND STREET NORTH, 12TH AVENUE NORTH, 20TH STREET NORTH, AND FL SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD IN BIRMINGHAM | 0301 | 2 | South Dade Air Conditioning & Refrigeration, | $1,250,570 | $1,496,656 | +20% | ALDOT |
| 20250926032 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-246/CR-298 (MULLIN ROAD) FROM THE JUNCTION OF CR-430 TO THE JUNCTION OF CR-430 IN SMITHS STATION | 0606 | 1 | East Alabama Paving Company, Inc. | $996,528 | ALDOT | ||
| 20250926015 | INTERCHANGE LIGHTING ON I-65 AT THE CR-222 (EXIT 305) INTERCHANGE IN GOOD HOPE | 0104 | 4 | Temple J Electric, LLC | $688,407 | $781,095 | +13% | ALDOT |
| 20250926034 | RESURFACING AND TRAFFIC STRIPE ON OLD WEBB ROAD FROM THE WEST TOWN LIMITS OF WEBB TO THE JUNCTION OF SR-52 | 0701 | 2 | Apac-Alabama, Inc. | $565,643 | $692,127 | +22% | ALDOT |
| 20250926039 | MAINTENANCE BRIDGE PAINTING ON SR-13 (US-43) OVER THE BLACK WARRIOR RIVER RELIEF BRIDGES AND ON SR-8 (US-80) OVER FRENCH CREEK IN DEMOPOLIS | 0802 | 3 | Gulf Coast Contracting, LLC | $495,670 | $562,820 | +14% | ALDOT |
| 20250926029 | RESURFACING AND TRAFFIC STRIPE ON CR-81 FROM THE JUNCTION OF CR-10 TO THE JUNCTION OF CR-6 NORTHWEST OF PRATTVILLE | 0601 | 3 | Apac-Alabama, Inc. | $460,627 | $464,136 | +1.0% | ALDOT |
| 20250926030 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-74 (FITZPATRICK ROAD) FROM THE JUNCTION OF SR-143 TO THE JUNCTION OF SR-14 | 0601 | 3 | Asphalt Contractors, Inc. | $352,461 | $406,321 | +15% | ALDOT |
| 20250926200 | DEMOLITION AND STRUCTURE REMOVAL ON SR-14 FROM A POINT 0.500 MILE WEST OF THE JUNCTION OF CR-3 (INGRAM ROAD) TO THE JUNCTION OF CR-153 (COOSADA PARKWAY) | 0601 | 2 | McElhenney Construction Co., LLC | $162,620 | $175,340 | +8.0% | ALDOT |
| 20250926022 | GUARDRAIL INSTALLATION ON CR-74 OVER JONES CREEK (SITE 1) AND ON CR-91 OVER LONG ISLAND CREEK (SITE 2) | 0103 | 2 | Alabama Guardrail, Inc. | $135,628 | $178,844 | +32% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.