ALDOT letting results, September 26, 2025

19 contracts let by Alabama DOT on September 26, 2025, $55,021,908 in low bids, a median of 3 bidders per contract.

Owner
Alabama DOT
Contracts
19
Low bids, total
$55,021,908
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20250926027ACCESS MANAGEMENT AND TRAFFIC SIGNAL UPGRADES ON DAUPHIN STREET FROM A POINT WEST OF THE I-65 INTERCHANGE TO THE INTERSECTION OF SAGE AVENUE IN MOBILE09013Wiregrass Construction Company, Inc.$9,292,727$10,771,357+16%ALDOT
20250926005BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE REMOVAL) ON SR-14 OVER THE SIPSEY RIVER10033McInnis Construction, LLC$8,191,559$8,340,543+2.0%ALDOT
20250926033RESURFACE, SIDEWALK INSTALL, AND INTERSECTION IMPROVEMENTS ON MAIN AVENUE FROM THE INTERSECTION OF 5TH STREET TO THE JUNCTION OF SR-6 (US-82/MCFARLAND BOULEVARD05024GFC Construction, Inc.$6,565,076$6,792,064+3.0%ALDOT
20250926019MICRO-FINE MILLING, RESURFACE, GUARDRAIL, AND STRIPE ON I-20 FROM A POINT BEGINNING AT THE 6-LANE SECTION (MP 173.218) TO THE H J BENTLEY JR. PARKWAY OVERPASS (04052Vulcan Materials Asphalt and Construction,$6,434,033$7,562,982+18%ALDOT
20250926006BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND TRAFFIC STRIPE) ON SR-118 OVER BOGUE CREEK IN SULLIGENT10012Carcel & G. Construction, LLC$5,675,116$6,793,374+20%ALDOT
20250926018MICRO-MILL, RESURFACE, GUARDRAIL, CONCRETE CLEAN, & STRIPE ON I-459 FROM THE SOUTH END OF THE BRIDGE OVER SR-150 TO THE NORTH END OF THE RAMPS AT SR-3 (US-31)03013Apac-Alabama, Inc.$5,502,706$5,734,293+4.0%ALDOT
20250926020CLEARING ON I-20/I-59 FROM EXIT 76 INTERCHANGE (MP 75.800) TO THE JEFFERSON COUNTY LINE05024Bulls Construction Group, LLC$2,693,567$2,930,260+9.0%ALDOT
20250926011STREETSCAPE AND SIDEWALK ENHANCEMENTS TO INCLUDE ADA UPGRADE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN BIRMINGHAM AS INDICATED IN THE PLANS03012South Dade Air Conditioning & Refrigeration,$2,672,406$2,767,191+4.0%ALDOT
20250926017RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON I-20/I-59 FROM A POINT SOUTH OF THE FAIRFIELD BOULEVARD BRIDGE TO A POINT SOUTH OF THE VALLEY ROAD BRIDGE03013Dunn Construction Company, Inc.$1,503,936$1,712,753+14%ALDOT
20250926035WIDENING, RESURFACING, AND TRAFFIC STRIPE ON MURPHY MILL ROAD FROM SR-605 TO SR-53 AND ON NORTH CHEROKEE AVENUE FROM SR-12 TO SR-53 IN DOTHAN07012Apac-Alabama, Inc.$1,382,628$1,455,298+5.0%ALDOT
20250926010ROADWAY IMPROVEMENTS ON 22ND STREET NORTH, 12TH AVENUE NORTH, 20TH STREET NORTH, AND FL SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD IN BIRMINGHAM03012South Dade Air Conditioning & Refrigeration,$1,250,570$1,496,656+20%ALDOT
20250926032RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-246/CR-298 (MULLIN ROAD) FROM THE JUNCTION OF CR-430 TO THE JUNCTION OF CR-430 IN SMITHS STATION06061East Alabama Paving Company, Inc.$996,528ALDOT
20250926015INTERCHANGE LIGHTING ON I-65 AT THE CR-222 (EXIT 305) INTERCHANGE IN GOOD HOPE01044Temple J Electric, LLC$688,407$781,095+13%ALDOT
20250926034RESURFACING AND TRAFFIC STRIPE ON OLD WEBB ROAD FROM THE WEST TOWN LIMITS OF WEBB TO THE JUNCTION OF SR-5207012Apac-Alabama, Inc.$565,643$692,127+22%ALDOT
20250926039MAINTENANCE BRIDGE PAINTING ON SR-13 (US-43) OVER THE BLACK WARRIOR RIVER RELIEF BRIDGES AND ON SR-8 (US-80) OVER FRENCH CREEK IN DEMOPOLIS08023Gulf Coast Contracting, LLC$495,670$562,820+14%ALDOT
20250926029RESURFACING AND TRAFFIC STRIPE ON CR-81 FROM THE JUNCTION OF CR-10 TO THE JUNCTION OF CR-6 NORTHWEST OF PRATTVILLE06013Apac-Alabama, Inc.$460,627$464,136+1.0%ALDOT
20250926030WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-74 (FITZPATRICK ROAD) FROM THE JUNCTION OF SR-143 TO THE JUNCTION OF SR-1406013Asphalt Contractors, Inc.$352,461$406,321+15%ALDOT
20250926200DEMOLITION AND STRUCTURE REMOVAL ON SR-14 FROM A POINT 0.500 MILE WEST OF THE JUNCTION OF CR-3 (INGRAM ROAD) TO THE JUNCTION OF CR-153 (COOSADA PARKWAY)06012McElhenney Construction Co., LLC$162,620$175,340+8.0%ALDOT
20250926022GUARDRAIL INSTALLATION ON CR-74 OVER JONES CREEK (SITE 1) AND ON CR-91 OVER LONG ISLAND CREEK (SITE 2)01032Alabama Guardrail, Inc.$135,628$178,844+32%ALDOT
ALDOT contracts let on September 26, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy