ALDOT contract 20250926200 bid tabulation
DEMOLITION AND STRUCTURE REMOVAL ON SR-14 FROM A POINT 0.500 MILE WEST OF THE JUNCTION OF CR-3 (INGRAM ROAD) TO THE JUNCTION OF CR-153 (COOSADA PARKWAY). Let by Alabama DOT on September 26, 2025, Elmore, 0601. 2 bids received; low bid $162,620 by McElhenney Construction Co., LLC.
- Owner
- Alabama DOT
- Letting
- 26 SEP 2025
- Pay items
- 16
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McElhenney Construction Co., LLC | $162,620 | Low |
| 2 | Bulls Construction Group, LLC | $175,340 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McElhenney Construction Co., LLC | 2. Bulls Construction Group, LLC |
|---|---|---|---|---|---|
| 0010 | Removal of structures, structure no. 1 (205A001) | EACH | 1 | $14,857 | $20,000 |
| 0020 | Removal of structures, structure no. 2 (205A002) | EACH | 1 | $16,134 | $20,000 |
| 0030 | Removal of structures, structure no. 3 (205A003) | EACH | 1 | $20,118 | $20,000 |
| 0040 | Borrow excavation (loose truckbed measurement)(A4 or better) (210D021) | CY | 250 | $22.11 | $100.00 |
| 0050 | Mobilization (600A000) | LS | 1 | $57,193 | $25,250 |
| 0060 | Filter blanket, geotextile (610D003) | SY | 250 | $5.31 | $6.00 |
| 0070 | Topsoil (650A000) | CY | 200 | $55.26 | $80.00 |
| 0080 | Seeding (652A100) | ACRE | 1 | $1,691.63 | $2,200.00 |
| 0090 | Mulching (656A010) | ACRE | 3 | $1,119.97 | $1,900.00 |
| 0100 | Silt fence (665J002) | LF | 720 | $5.43 | $6.00 |
| 0110 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 200 | $87.66 | $100.00 |
| 0120 | Silt fence removal (665O001) | LF | 720 | $3.72 | $2.00 |
| 0130 | Construction fuel (maximum bid limited to $ 7,370.00) (698A000) | LS | 1 | $0.00 | $0.00 |
| 0140 | Construction signs (740B000) | SF | 262 | $9.50 | $15.00 |
| 0150 | Channelizing drums (740D000) | EACH | 100 | $13.30 | $50.00 |
| 0160 | Cones (36 inches high) (740E000) | EACH | 100 | $34.20 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of September 26, 2025. Compiled by Mirage Metrics.