McElhenney Construction Co., LLC: ALDOT bid record

McElhenney Construction Co., LLC submitted 86 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 28 AUG 2026, and was the low bidder on 17 of them (20%). When it was not low, its total sat a median +19% above the low bid.

Owner
Alabama DOT
Low bid volume
$19,622,295
Latest bid
28 AUG 2026
Data through
28 AUG 2026
86Bids
17Low bids
20Win rate, percent
+19%Median gap to the low bid when not low, 69 bids

By year

YearBidsLow bidsWin rate
202217635%
202312217%
202424521%
202519211%
202614214%
McElhenney Construction Co., LLC, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
090110220%
06018225%
09028113%
06067343%
09034125%
07014250%
0502400%
05053133%
10013133%
0704300%
0804300%
0702300%
McElhenney Construction Co., LLC, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Channelizing drums740D000EACH7435 (47%)$27.30$33.00
Construction signs740B000SF7828 (36%)$7.33$7.00
Structure excavation214A000CY5120 (39%)$19.10$25.00
Topsoil650A000CY6318 (29%)$45.76$45.00
Mulching656A010ACRE3718 (49%)$1,325.18$1,307.18
Bituminous treatment A401A000SY4417 (39%)$1.29$1.56
Barricades, type III740F002EACH4317 (40%)$223.21$252.14
Portable sequential arrow and chevron sign unit741C010EACH4616 (35%)$1,205.73$1,597.10
Portable changeable message sign, type 2742A001EACH4416 (36%)$2,012.83$4,210.53
Construction safety fence674A000LF2916 (55%)$4.03$5.00
Solid sodding (bermuda)654A001SY5214 (27%)$7.78$8.94
Silt fence665J002LF6713 (19%)$5.36$5.00
McElhenney Construction Co., LLC, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

McElhenney Construction Co., LLC, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 AUG 2026202608280110402MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE TO INTERSECTION IMPROVEMENTS (LEFT AND RIGHT TURN LANES) ON CR 109 FROM SR-202 TO MORRISVILLE4 of 4$2,799,576+23%
31 JUL 2026202607310080802ROADWAY SAFETY IMPROVEMENTS (GUARDRAIL INSTALLATION AND GUARDRAIL END ANCHORS) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PL2 of 4$243,953+12%
31 JUL 2026202607310250902INTERSECTION IMPROVEMENTS (ADDITIONAL TURN LANES AND TRAFFIC SIGNAL UPGRADES) ON SR-42 (US-98) AT CR-87 EAST OF FOLEY2 of 6$907,155+5.0%
26 JUN 2026202606260290601ROADWAY AND SAFETY IMPROVEMENTS (PLANING, RESURFACING, SIDEWALK INSTALLATION, AND TRAFFIC STRIPE) ON WEST TALLASSEE STREET FROM THE JUNCTION4 of 5$1,462,109+35%
26 JUN 2026202606260350902ROADWAY IMPROVEMENTS (ADDITIONAL LANES, MICRO-MILLING, CURB AND GUTTER INSTALLATION, RESURFACING, AND TRAFFIC STRIPE) ON SR-59 SOUTH FROM TH2 of 5$1,951,292+16%
29 MAY 2026202605290110603ROADWAY/CROSSWALK IMPROVEMENTS (SIDEWALK INSTALLATION, CURB RAMPS, CONCRETE ISLANDS, AND FLASHING BEACON LIGHTS) ON WARES FERRY ROAD AT WARE1 of 2$178,207Low, 14% under the second
29 MAY 2026202605290400704INTERSECTION IMPROVEMENTS (MICRO-MILLING, RESURFACING, TRAFFIC SIGNAL MODIFICATIONS, AND TRAFFIC STRIPE) ON SR-53 (US-231) AT THE INTERSECTI3 of 3$1,248,854+45%
24 APR 2026202604240190502STRUCTURAL REMOVAL ON SR-216 AT THE I-20/I-59 INTERCHANGE (EXIT 100) EAST OF LAKEVIEW2 of 2$219,575+15%
24 APR 2026202604240440604INTERSECTION IMPROVEMENTS (GRADING, DRAINAGE, AND PAVEMENT) TO INCLUDE TURN LANE AND ACCELERATION LANE ADDITIONS ON SR-3 (US-31) AT CR-37 (D3 of 3$1,660,420+36%
27 MAR 2026202603270440606INTERSECTION IMPROVEMENTS TO INCLUDE LEFT TURN LANE ADDITIONS AND TRAFFIC SIGNAL MODIFICATIONS ON SR-38 (US-280) AT FREDERICK ROAD IN OPELIK2 of 2$2,237,707+2.0%
27 MAR 2026202603270470702MAINTENANCE STRUCTURAL REMOVAL ON SR-52 FROM A POINT WEST OF THE INTERSECTION OF 2ND AVENUE TO A POINT EAST OF THE JUNCTION OF COX STREET9 of 9$467,082+77%
27 FEB 2026202602270070902ROADWAY AND SAFETY IMPROVEMENTS (PEDESTRIAN AND BICYCLE UPGRADES/TRAFFIC SIGNALS AND TRAFFIC STRIPE) ON SR-182 FROM MP 13.750 IN GULF SHORES2 of 2$727,242+17%
30 JAN 2026202601300640105RESURFACING, SIDEWALK IMPROVEMENTS, AND TRAFFIC STRIPE ON WALNUT STREET FROM SOUTH 8TH STREET TO SOUTH 5TH STREET IN GADSDEN.2 of 7$1,196,103+40%
30 JAN 2026202601300670301ACCESS MANAGEMENT AND INTERCHANGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND ITS) ON SR- 79 (TALLAPOOSA STREET) AT THE 1 of 3$2,137,727Low, 2.0% under the second
05 DEC 2025202512050030901BRIDGE REPLACEMENT ON SR-13 (US-43) OVER COLD CREEK NORTH OF CREOLA4 of 4$13,882,641+61%
05 DEC 2025202512050590302ROADWAY IMPROVEMENTS (CHANGE TRAFFIC FLOW AND TURN RADIUS) ON SR-53 (US-231 AND US-411)/COURTHOUSE SQUARE AND SR-25 (US-411) IN ASHVILLE5 of 5$1,568,635+24%
05 DEC 2025202512050620701INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVE, AND STRIPE) ON SR-12 (US-84) AT BROADWAY STREET IN ASHFORD4 of 4$1,369,528+67%
07 NOV 2025202511070120601ROADWAY IMPROVEMENTS (ACCESS MANAGEMENT) ON SR-9 (US-231) FROM THE INTERSECTION OF CHARLES AVENUE TO THE JUNCTION OF MAIN STREET IN WETUMPKA3 of 5$1,251,634+9.0%
07 NOV 2025202511070570804INTERSECTION IMPROVEMENTS TO INCLUDE LEFT TURN LANE ADDITION ON SR-57 (US-45) AT CR-1 TO INCLUDE LEFT TURN LANES ON SR-57 (US-45) IN FRUITDA5 of 8$1,510,107+25%
07 NOV 20252025110720010HORIZONTAL CURVE PROJECT ON I-22 AT VARIOUS LOCATIONS IN THE WEST CENTRAL REGION (FAYETTE AREA) AS INDICATED IN THE PLANS3 of 3$419,320+54%
26 SEP 2025202509260270901ACCESS MANAGEMENT AND TRAFFIC SIGNAL UPGRADES ON DAUPHIN STREET FROM A POINT WEST OF THE I-65 INTERCHANGE TO THE INTERSECTION OF SAGE AVENUE2 of 3$10,771,357+16%
26 SEP 2025202509262000601DEMOLITION AND STRUCTURE REMOVAL ON SR-14 FROM A POINT 0.500 MILE WEST OF THE JUNCTION OF CR-3 (INGRAM ROAD) TO THE JUNCTION OF CR-153 (COOS1 of 2$162,620Low, 8.0% under the second
25 JUL 2025202507250110702ACCESS MANAGEMENT (GRADE, DRAIN, PAVE, SIGNALS, & STRIPE) ON SR-12 (US-84) FROM CR-709 (MP 184.300) EAST OF ENTERPRISE TO CR-1 (MP 185.420) 3 of 3$2,761,997+14%
25 JUL 2025202507250270902WIDEN, RESURFACE, TURN LANE ADDITION, AND STRIPE ON SR-16 (US-90) FROM A POINT NEAR MT AID BAPTIST CHURCH TO THE INTERSECTION OF SR-1815 of 5$2,937,629+19%
27 JUN 2025202506270350902MAINTENANCE DREDGING OF LITTLE LAGOON PASS2 of 2$1,818,101+22%
McElhenney Construction Co., LLC: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy