ALDOT contract 20250725027 bid tabulation
WIDEN, RESURFACE, TURN LANE ADDITION, AND STRIPE ON SR-16 (US-90) FROM A POINT NEAR MT AID BAPTIST CHURCH TO THE INTERSECTION OF SR-181. Let by Alabama DOT on July 25, 2025, Baldwin, 0902. 5 bids received; low bid $2,475,998 by PL Russell LLC.
- Owner
- Alabama DOT
- Letting
- 25 JUL 2025
- Pay items
- 128
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | PL Russell LLC | $2,475,998 | Low |
| 2 | Wiregrass Construction Company, Inc. | $2,489,424 | +1.0% |
| 3 | Apac-Alabama, Inc. | $2,697,975 | +9.0% |
| 4 | Arrington Curb & Excavation, Inc. | $2,841,962 | +15% |
| 5 | McElhenney Construction Co., LLC | $2,937,629 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. PL Russell LLC | 2. Wiregrass Construction Company, Inc. | 3. Apac-Alabama, Inc. | 4. Arrington Curb & Excavation, Inc. | 5. McElhenney Construction Co., LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $8,000.00 | $8,000.00 | $7,680.57 | $8,000.00 | $8,000.00 |
| 0020 | Removing concrete sidewalk (206C000) | SY | 129 | $20.79 | $15.85 | $27.72 | $37.00 | $12.66 |
| 0030 | Removing concrete slope paving (206C002) | SY | 28 | $24.94 | $14.15 | $127.70 | $37.00 | $31.65 |
| 0040 | Removing pipe (206D000) | LF | 170 | $24.94 | $15.85 | $13.46 | $25.00 | $26.38 |
| 0050 | Removing curb (206D002) | LF | 33 | $15.61 | $11.30 | $23.85 | $90.00 | $14.29 |
| 0060 | Removing curb and gutter (206D003) | LF | 119 | $15.58 | $11.30 | $15.02 | $27.00 | $21.09 |
| 0070 | Removing headwalls (206E000) | EACH | 4 | $311.74 | $200.00 | $311.17 | $475.00 | $949.44 |
| 0080 | Removing inlets (206E001) | EACH | 2 | $831.31 | $1,000.00 | $1,342.64 | $650.00 | $1,424.15 |
| 0090 | Removing guardrail end anchor (all type) (206E008) | EACH | 2 | $286.01 | $260.00 | $286.13 | $270.00 | $292.28 |
| 0100 | Removing inlets (partial) (206E042) | EACH | 1 | $415.67 | $1,315.00 | $1,244.66 | $1,475.00 | $949.44 |
| 0110 | Unclassified excavation (210A000) | CY | 3,500 | $25.03 | $33.50 | $39.59 | $18.00 | $26.58 |
| 0120 | Borrow excavation (loose truckbed measurement)(A2 or better) (210D020) | CY | 2,000 | $27.20 | $28.50 | $39.56 | $27.00 | $32.93 |
| 0130 | Structure excavation (214A000) | CY | 1,330 | $35.13 | $33.50 | $12.56 | $14.00 | $22.38 |
| 0140 | Foundation backfill, commercial (214B001) | CY | 1,999 | $76.60 | $95.50 | $102.45 | $145.00 | $96.03 |
| 0150 | Roadbed processing (230A000) | RBST | 22 | $357.58 | $1,265.00 | $405.51 | $750.00 | $890.00 |
| 0160 | Geosynthetic reinforcement for soft soil stabilization, type 2 (243A034) | SY | 3,688 | $3.15 | $4.75 | $3.76 | $3.13 | $4.60 |
| 0170 | Cement mortar flowable backfill, mix 1 (260A000) | CY | 3 | $531.98 | $340.00 | $976.41 | $1,441.12 | $1,753.64 |
| 0180 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 3,688 | $30.95 | $32.00 | $28.28 | $29.00 | $36.08 |
| 0190 | Crushed aggregate, section 825, type B, for miscellaneous use (305B078) | TON | 200 | $86.04 | $100.00 | $114.29 | $89.00 | $87.53 |
| 0200 | Bituminous treatment A (401A000) | SY | 3,110 | $1.64 | $1.25 | $1.56 | $1.25 | $1.22 |
| 0210 | Tack coat (405A000) | GAL | 2,255 | $4.87 | $4.00 | $4.79 | $5.50 | $8.53 |
| 0220 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 14,340 | $2.57 | $2.60 | $3.85 | $3.75 | $3.78 |
| 0230 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 1,676 | $141.96 | $120.50 | $140.41 | $125.00 | $148.44 |
| 0240 | Superpave bituminous concrete wearing surface layer, patching, 1/2" maximum aggregate size mix, esal range C/D (424A363) | TON | 25 | $278.57 | $225.00 | $481.49 | $205.00 | $164.59 |
| 0250 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 404 | $146.91 | $160.00 | $145.25 | $125.00 | $148.98 |
| 0260 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 60 | $239.80 | $225.00 | $251.86 | $195.00 | $169.78 |
| 0270 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 440 | $143.14 | $160.00 | $140.90 | $125.00 | $148.98 |
| 0280 | Aggregate surfacing (crushed aggregate base, type B) (430B040) | TON | 100 | $88.30 | $75.00 | $79.09 | $95.00 | $87.53 |
| 0290 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 370 | $60.46 | $75.00 | $79.18 | $105.00 | $116.77 |
| 0300 | 24" storm sewer pipe (class 3 R.C.) (533A099) | LF | 910 | $80.67 | $90.00 | $93.82 | $110.00 | $139.65 |
| 0310 | 30" storm sewer pipe (class 3 R.C.) (533A100) | LF | 877 | $105.05 | $110.00 | $137.97 | $175.00 | $185.52 |
| 0320 | 36" storm sewer pipe (class 3 R.C.) (533A101) | LF | 69 | $135.33 | $155.00 | $156.83 | $225.00 | $265.12 |
| 0330 | Mobilization (600A000) | LS | 1 | $163,478 | $170,000 | $219,685 | $284,197 | $215,561 |
| 0340 | Right of way markers (602A000) | EACH | 5 | $319.97 | $500.00 | $449.29 | $425.00 | $830.46 |
| 0350 | Special underdrain outlet, type B (605B001) | EACH | 3 | $907.70 | $795.00 | $1,390.13 | $1,800.00 | $2,479.90 |
| 0360 | 6" underdrain pipe,type 8 (606A012) | LF | 500 | $44.89 | $40.00 | $21.74 | $27.00 | $46.28 |
| 0370 | Loose riprap, class 2 (610C001) | TON | 22 | $99.58 | $115.00 | $104.34 | $105.00 | $130.33 |
| 0380 | Filter blanket, geotextile (610D003) | SY | 500 | $5.77 | $5.50 | $4.22 | $4.00 | $5.46 |
| 0390 | Slope paving (614A000) | CY | 7 | $843.14 | $505.00 | $1,000.14 | $1,491.88 | $701.46 |
| 0400 | Detectable warning surface (618C001) | SF | 25 | $40.54 | $32.50 | $43.27 | $48.00 | $75.99 |
| 0410 | Curb ramp (618D000) | SY | 33 | $222.36 | $340.00 | $224.96 | $124.93 | $204.59 |
| 0420 | 18" side drain pipe end treatment, class 1 (619A101) | EACH | 1 | $1,249.31 | $1,875.00 | $1,336.27 | $1,340.35 | $1,695.19 |
| 0430 | 36" side drain pipe end treatment, class 2 (619A129) | EACH | 1 | $2,707.88 | $3,750.00 | $4,564.26 | $2,837.90 | $4,091.83 |
| 0440 | Minor structure concrete (620A000) | CY | 2 | $1,109.88 | $1,875.00 | $2,117.33 | $1,599.34 | $1,461.37 |
| 0450 | Junction boxes, type 1 or 1P (621A011) | EACH | 2 | $5,629.15 | $5,635.00 | $5,800.35 | $1,395.00 | $7,338.88 |
| 0460 | Junction box units, type 1 or 1P (621B011) | EACH | 3 | $1,693.76 | $1,250.00 | $1,315.93 | $975.00 | $1,341.00 |
| 0470 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 7 | $6,792.85 | $6,315.00 | $6,346.46 | $3,329.25 | $7,312.87 |
| 0480 | Inlets, type S2 or S4 (1 wing) (621C016) | EACH | 1 | $6,316.30 | $7,065.00 | $4,750.40 | $3,593.26 | $8,902.55 |
| 0490 | Inlets, type S1 or S3 (2 wing) (621C017) | EACH | 1 | $7,645.58 | $7,090.00 | $6,918.71 | $3,444.76 | $9,534.15 |
| 0500 | Inlets, type "special" (621C030) | EACH | 1 | $4,472.85 | $3,515.00 | $6,411.98 | $3,221.63 | $4,968.65 |
| 0510 | Inlets, type S1 or S3 (1 wing) (modified) (621C036) | EACH | 6 | $8,807.83 | $8,300.00 | $11,281 | $7,990.54 | $10,796 |
| 0520 | Inlets, type S1 or S3 (2 wing) (modified) (621C049) | EACH | 1 | $9,092.08 | $8,500.00 | $11,485 | $9,030.04 | $11,965 |
| 0530 | Inlet units, type S1 or S3 (621D015) | EACH | 26 | $1,319.13 | $930.00 | $486.41 | $1,292.99 | $993.56 |
| 0540 | Concrete gutter (modified) (623A004) | LF | 68 | $58.55 | $36.50 | $85.69 | $32.18 | $81.84 |
| 0550 | Concrete curb, type N (623B000) | LF | 2,276 | $30.18 | $29.65 | $23.15 | $25.69 | $29.23 |
| 0560 | Combination curb & gutter, type C (623C000) | LF | 2,104 | $35.95 | $31.50 | $30.50 | $32.17 | $35.07 |
| 0570 | Steel beam guardrail, class A, type 2 (630A001) | LF | 62 | $25.17 | $23.00 | $25.18 | $23.76 | $25.72 |
| 0580 | Guardrail end anchor, type 20 series (630C050) | EACH | 2 | $3,718.10 | $3,380.00 | $3,719.63 | $3,510.00 | $3,799.56 |
| 0590 | Gate, 14 feet wide, complete with fittings (without barbed wire) (634D004) | EACH | 2 | $2,860.08 | $1,050.00 | $915.60 | $1,836.00 | $935.28 |
| 0600 | Fence reset (637A000) | LF | 40 | $68.64 | $170.00 | $19.46 | $126.36 | $19.87 |
| 0610 | Topsoil (650A000) | CY | 200 | $33.69 | $47.50 | $53.58 | $29.00 | $51.55 |
| 0620 | Seeding (652A100) | ACRE | 1 | $2,059.26 | $1,870.00 | $2,060.10 | $2,160.00 | $2,104.37 |
| 0630 | Mowing (652C000) | ACRE | 2 | $143.01 | $130.00 | $143.07 | $540.00 | $146.14 |
| 0640 | Solid sodding (bermuda) (654A001) | SY | 1,250 | $5.83 | $5.30 | $5.84 | $6.75 | $5.96 |
| 0650 | Mulching (656A010) | ACRE | 1 | $2,059.26 | $1,870.00 | $2,060.10 | $1,620.00 | $2,104.37 |
| 0660 | Temporary seeding (665A000) | ACRE | 1 | $457.61 | $415.00 | $457.80 | $1,296.00 | $467.64 |
| 0670 | Temporary mulching (665B001) | TON | 12 | $486.21 | $440.00 | $486.41 | $432.00 | $496.87 |
| 0680 | Polyethylene (665E000) | SY | 5,000 | $2.29 | $2.10 | $1.74 | $3.75 | $2.34 |
| 0690 | Sand bags (665G000) | EACH | 200 | $9.15 | $8.30 | $9.06 | $12.96 | $9.35 |
| 0700 | Temporary riprap, class 2 (665I000) | TON | 100 | $97.20 | $105.00 | $125.44 | $180.00 | $136.54 |
| 0710 | Silt fence (665J002) | LF | 2,500 | $4.58 | $4.15 | $4.58 | $6.48 | $4.68 |
| 0720 | Drainage sump excavation (665K000) | CY | 40 | $32.43 | $39.50 | $69.87 | $72.00 | $39.87 |
| 0730 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 150 | $95.95 | $82.00 | $90.13 | $98.00 | $89.97 |
| 0740 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 150 | $91.40 | $82.00 | $90.13 | $98.00 | $89.97 |
| 0750 | Silt fence removal (665O001) | LF | 2,500 | $1.72 | $1.55 | $1.72 | $3.24 | $1.75 |
| 0760 | Inlet protection, stage 3 or 4 (665P005) | EACH | 20 | $514.81 | $470.00 | $427.04 | $450.00 | $526.09 |
| 0770 | Wattle (665Q002) | LF | 1,000 | $10.87 | $10.00 | $10.87 | $12.96 | $11.11 |
| 0780 | Pest control treatment (666A001) | ACRE | 2 | $286.01 | $260.00 | $286.13 | $324.00 | $292.28 |
| 0790 | Flocculant application, ditch check (672C100) | EACH | 25 | $13.73 | $12.50 | $13.73 | $205.00 | $14.03 |
| 0800 | Flocculant application, inlet protection (672C103) | EACH | 50 | $13.73 | $12.50 | $13.73 | $205.00 | $14.03 |
| 0810 | Geometric controls (680A001) | LS | 1 | $35,936 | $15,730 | $5,477.46 | $18,000 | $42,667 |
| 0820 | Construction fuel (maximum bid limited to $ 132,600.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 | $25,000 | $0.00 |
| 0830 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 1 | $5,148.14 | $4,680.00 | $5,150.25 | $4,536.00 | $5,260.93 |
| 0840 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 1 | $5,148.14 | $4,680.00 | $5,150.25 | $4,536.00 | $5,260.93 |
| 0850 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 1 | $2,688.47 | $2,445.00 | $2,689.58 | $1,404.00 | $2,747.37 |
| 0860 | Broken yellow, class 2, type A traffic stripe (5" wide) (701A244) | MI | 1 | $2,688.47 | $2,445.00 | $2,689.58 | $1,404.00 | $2,747.37 |
| 0870 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 1,395 | $1.14 | $1.05 | $1.14 | $0.49 | $1.17 |
| 0880 | Broken temporary traffic stripe (701C000) | MI | 1 | $457.61 | $415.00 | $457.80 | $2,646.00 | $467.64 |
| 0890 | Solid temporary traffic stripe (701C001) | MI | 3 | $1,029.63 | $935.00 | $1,030.05 | $3,726.00 | $1,052.19 |
| 0900 | Solid traffic stripe removed (701D005) | MI | 3 | $2,860.08 | $2,600.00 | $2,861.25 | $2,160.00 | $2,922.74 |
| 0910 | Broken traffic stripe removed (701D013) | MI | 1 | $2,059.26 | $1,870.00 | $2,060.10 | $2,160.00 | $2,104.37 |
| 0920 | Traffic control markings, class 2, type A (703A002) | SF | 2,857 | $5.72 | $5.20 | $5.72 | $5.13 | $5.85 |
| 0930 | Traffic control legends, class 2, type A (703B002) | SF | 112 | $5.72 | $5.20 | $5.72 | $9.72 | $5.85 |
| 0940 | Temporary traffic control markings (703D001) | SF | 495 | $2.29 | $2.10 | $2.29 | $1.62 | $2.34 |
| 0950 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 140 | $5.72 | $5.20 | $5.72 | $5.67 | $5.85 |
| 0960 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 100 | $5.72 | $5.20 | $5.72 | $5.67 | $5.85 |
| 0970 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 21 | $5.72 | $5.20 | $5.72 | $5.67 | $5.85 |
| 0980 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 50 | $5.72 | $5.20 | $5.72 | $5.67 | $5.85 |
| 0990 | Class 9, aluminum flat sign panels (type XI background) (710A153) | SF | 183 | $27.46 | $25.00 | $27.47 | $25.92 | $29.81 |
| 1000 | Roadway sign post (#3 "U" channel galvanized steel) (710B001) | LF | 84 | $19.45 | $17.70 | $19.46 | $18.36 | $21.04 |
| 1010 | Roadway sign relocation (711A000) | LS | 1 | $343.21 | $312.00 | $343.35 | $324.00 | $584.55 |
| 1020 | Portable concrete safety barriers, type 6 (726A000) | LF | 1,498 | $37.90 | $20.30 | $66.41 | $59.40 | $79.79 |
| 1030 | Portable concrete safety barriers, type 6-A (726A001) | LF | 160 | $87.88 | $20.30 | $67.29 | $27.00 | $95.77 |
| 1040 | Portable impact attenuator assembly (unidirectional,TL-3) (726D025) | EACH | 8 | $4,527.88 | $11,900 | $9,265.00 | $13,500 | $8,554.52 |
| 1050 | Removal of existing traffic control unit ( SR-16 (US-90) at renaissance boulevard) (730A000) | LS | 1 | $17,160 | $15,600 | $17,168 | $10,800 | $17,536 |
| 1060 | Furnishing and installing traffic control unit ( SR-16 (US-90) at renaissance boulevard) (730C000) | LS | 1 | $35,289 | $32,080 | $35,303 | $12,960 | $36,062 |
| 1070 | Metal traffic signal pole foundation (730E000) | EACH | 3 | $22,882 | $20,800 | $22,891 | $11,800 | $23,383 |
| 1080 | Metal traffic signal pole with 50' mast arm assembly (730F000) | EACH | 1 | $33,125 | $30,115 | $33,139 | $43,308 | $33,851 |
| 1090 | Metal traffic signal pole with 60' mast arm assembly (730F001) | EACH | 2 | $41,058 | $37,325 | $41,075 | $55,080 | $41,958 |
| 1100 | Traffic signal junction box type S1 (730K001) | EACH | 2 | $1,372.84 | $1,250.00 | $1,373.40 | $1,350.00 | $1,402.92 |
| 1110 | Traffic signal junction box type S2 (730K002) | EACH | 3 | $2,860.08 | $2,600.00 | $2,861.25 | $1,679.40 | $2,922.74 |
| 1120 | 1", non-metallic, conduit (730L003) | LF | 30 | $13.73 | $12.50 | $13.73 | $10.80 | $14.03 |
| 1130 | 2", non-metallic, conduit (730L005) | LF | 730 | $21.18 | $19.25 | $21.18 | $14.04 | $21.64 |
| 1140 | Luminaire extension assembly, 15' (730N000) | EACH | 4 | $4,261.52 | $3,875.00 | $4,263.26 | $4,860.00 | $4,354.88 |
| 1150 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 8 | $1,677.15 | $1,525.00 | $1,677.84 | $1,998.00 | $1,713.89 |
| 1160 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 2 | $1,867.06 | $1,700.00 | $1,867.83 | $2,214.00 | $1,907.97 |
| 1170 | Pedestrian signal head, type LED (730P100) | EACH | 4 | $1,187.51 | $1,080.00 | $1,187.99 | $1,350.00 | $1,213.52 |
| 1180 | Miscellaneous equipment, pedestrian push button (730Q001) | EACH | 4 | $145.29 | $130.00 | $145.35 | $664.20 | $148.48 |
| 1190 | Miscellaneous equipment, pedestal pole and foundation (730Q005) | EACH | 3 | $3,456.12 | $3,140.00 | $3,457.53 | $2,484.00 | $3,531.84 |
| 1200 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 1 | $34,310 | $31,190 | $34,324 | $43,200 | $35,061 |
| 1210 | Electrical power service assembly with wood pole (730T010) | EACH | 1 | $4,516.64 | $4,100.00 | $4,515.05 | $4,320.00 | $4,615.59 |
| 1220 | Video detection system ( SR-16 (US- 90) at renaissance boulevard) (730U015) | LS | 1 | $40,533 | $36,850 | $40,550 | $58,320 | $41,421 |
| 1230 | Construction signs (740B000) | SF | 326 | $9.15 | $8.30 | $8.01 | $8.64 | $6.43 |
| 1240 | Channelizing drums (740D000) | EACH | 144 | $43.47 | $39.50 | $29.76 | $41.04 | $29.81 |
| 1250 | Cones (36 inches high) (740E000) | EACH | 100 | $18.30 | $16.00 | $0.01 | $17.28 | $40.33 |
| 1260 | Barricades, type III (740F002) | EACH | 4 | $245.97 | $225.00 | $257.51 | $232.20 | $146.14 |
| 1270 | Portable changeable message sign, type 3 (742A003) | EACH | 2 | $4,804.93 | $3,420.00 | $2,861.25 | $4,536.00 | $4,910.20 |
| 1280 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 242 | $114.39 | $104.00 | $114.44 | $108.00 | $116.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 25, 2025. Compiled by Mirage Metrics.