PL Russell LLC: ALDOT bid record

PL Russell LLC submitted 15 bids on Alabama DOT contracts in the data, from 30 AUG 2024 to 31 JUL 2026, and was the low bidder on 3 of them (20%). When it was not low, its total sat a median +19% above the low bid.

Owner
Alabama DOT
Low bid volume
$3,317,111
Latest bid
31 JUL 2026
Data through
28 AUG 2026
15Bids
3Low bids
20Win rate, percent
+19%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
2024400%
20255120%
20266233%
PL Russell LLC, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
09026233%
0804300%
0702300%
0901200%
080211100%
PL Russell LLC, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Cones (36 inches high)740E000EACH144 (29%)$18.38$20.47
Temporary seeding665A000ACRE84 (50%)$473.79$900.00
Silt fence665J002LF143 (21%)$5.08$5.00
Silt fence removal665O001LF143 (21%)$1.71$1.45
Temporary mulching665B001TON93 (33%)$486.21$545.62
Minor structure concrete620A000CY73 (43%)$1,617.34$2,279.07
Topsoil650A000CY132 (15%)$37.12$45.00
Unclassified excavation210A000CY132 (15%)$29.94$32.97
Tack coat405A000GAL122 (17%)$6.36$4.55
Wattle665Q002LF102 (20%)$10.91$10.75
Filter blanket, geotextile610D003SY102 (20%)$5.37$5.47
Temporary coarse aggregate,aldot number 1665N000TON102 (20%)$106.02$73.12
PL Russell LLC, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
McElhenney Construction Co., LLC126 of 12
Wiregrass Construction Company, Inc.106 of 10
Rob Middleton Construction, LLC61 of 6
Apac-Alabama, Inc.42 of 4
Pine City Contracting, LLC31 of 3
C. Thornton, Inc.21 of 2
Cornerstone Civil Contractors, LLC20 of 2
Arrington Curb & Excavation, Inc.21 of 2
J. Hunt Enterprises General Contractors, LLC22 of 2
S. A. Graham Company, Inc.22 of 2
PL Russell LLC, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 2026202607310080802ROADWAY SAFETY IMPROVEMENTS (GUARDRAIL INSTALLATION AND GUARDRAIL END ANCHORS) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PL1 of 4$217,898Low, 12% under the second
31 JUL 2026202607310250902INTERSECTION IMPROVEMENTS (ADDITIONAL TURN LANES AND TRAFFIC SIGNAL UPGRADES) ON SR-42 (US-98) AT CR-87 EAST OF FOLEY3 of 6$949,026+10%
26 JUN 2026202606260350902ROADWAY IMPROVEMENTS (ADDITIONAL LANES, MICRO-MILLING, CURB AND GUTTER INSTALLATION, RESURFACING, AND TRAFFIC STRIPE) ON SR-59 SOUTH FROM TH3 of 5$1,951,373+16%
27 MAR 2026202603270470702MAINTENANCE STRUCTURAL REMOVAL ON SR-52 FROM A POINT WEST OF THE INTERSECTION OF 2ND AVENUE TO A POINT EAST OF THE JUNCTION OF COX STREET7 of 9$443,682+68%
27 FEB 2026202602270070902ROADWAY AND SAFETY IMPROVEMENTS (PEDESTRIAN AND BICYCLE UPGRADES/TRAFFIC SIGNALS AND TRAFFIC STRIPE) ON SR-182 FROM MP 13.750 IN GULF SHORES1 of 2$623,215Low, 17% under the second
27 FEB 2026202602270280702ROADWAY SAFETY IMPROVEMENTS (DRAINAGE IMPROVEMENTS) ON SR-12 (US-84) AT THE JUNCTION OF CR-502 EAST OF ELBA4 of 5$850,735+47%
05 DEC 2025202512050150702ROADWAY/INTERSECTION SAFETY IMPROVEMENTS ON SR-12- (US-84) AT SR-141 SOUTHWEST OF ELBA4 of 4$1,493,891+26%
07 NOV 2025202511070570804INTERSECTION IMPROVEMENTS TO INCLUDE LEFT TURN LANE ADDITION ON SR-57 (US-45) AT CR-1 TO INCLUDE LEFT TURN LANES ON SR-57 (US-45) IN FRUITDA6 of 8$1,515,000+26%
25 JUL 2025202507250270902WIDEN, RESURFACE, TURN LANE ADDITION, AND STRIPE ON SR-16 (US-90) FROM A POINT NEAR MT AID BAPTIST CHURCH TO THE INTERSECTION OF SR-1811 of 5$2,475,998Low, 1.0% under the second
25 APR 2025202504250450902ROADWAY IMPROVEMENTS AND WIDENING ON SR-225 FROM THE JUNCTION OF OAKRIDGE DRIVE IN SPANISH FORT TO THE JUNCTION OF GENERAL CANBY BOULEVARD4 of 5$1,580,354+22%
28 MAR 2025202503280370804INTERSECTION IMPROVEMENTS AND ACCESS MANAGEMENT ON SR-13 (US-43) AT SR-69 IN JACKSON2 of 6$1,259,196+10%
06 DEC 2024202412060120804ROADWAY IMPROVEMENTS (DRAINAGE STRUCTURE AND ROADWAY REPAIR) ON SR-17 FROM A POINT SOUTH OF THE JUNCTION OF SPARKS ROAD NORTHEAST OF TOXEY2 of 2$1,795,004+49%
08 NOV 2024202411080610901ROADWAY IMPROVEMENTS (LANE ADDITION) ON SR-158 FROM THE EXISTING 4 LANE SECTION TO A POINT EASTERLY FOR 1500 FEET IN SARALAND2 of 5$1,671,734+7.0%
27 SEP 2024202409270420902INTERSECTION IMPROVEMENTS TO INCLUDE ADDING TURN LANES ON SR-59 AT CR-12 IN FOLEY3 of 5$1,944,028+6.0%
30 AUG 2024202408300110901ROADWAY IMPROVEMENTS (LEFT TURN BYPASS LANE ADDITION) ON SR-17 (US-45) AND SR-57 (US-45) AT VARIOUS LOCATIONS IN THE SOUTHWEST REGION (MOBIL3 of 5$514,063+9.0%
PL Russell LLC: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.