ALDOT contract 20250425045 bid tabulation
ROADWAY IMPROVEMENTS AND WIDENING ON SR-225 FROM THE JUNCTION OF OAKRIDGE DRIVE IN SPANISH FORT TO THE JUNCTION OF GENERAL CANBY BOULEVARD. Let by Alabama DOT on April 25, 2025, Baldwin, 0902. 5 bids received; low bid $1,299,463 by Southern Land Development, L.L.C..
- Owner
- Alabama DOT
- Letting
- 25 APR 2025
- Pay items
- 82
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Southern Land Development, L.L.C. | $1,299,463 | Low |
| 2 | McElhenney Construction Co., LLC | $1,339,511 | +3.0% |
| 3 | Wiregrass Construction Company, Inc. | $1,487,528 | +14% |
| 4 | PL Russell LLC | $1,580,354 | +22% |
| 5 | Rob Middleton Construction, LLC | $1,665,427 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Southern Land Development, L.L.C. | 2. McElhenney Construction Co., LLC | 3. Wiregrass Construction Company, Inc. | 4. PL Russell LLC | 5. Rob Middleton Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 2 acres) (201A002) | LS | 1 | $15,960 | $16,000 | $16,000 | $5,769.04 | $15,000 |
| 0020 | Removing riprap (206C023) | SY | 34 | $23.73 | $27.77 | $36.09 | $32.49 | $8.27 |
| 0030 | Removing pipe (206D000) | LF | 264 | $11.38 | $27.77 | $20.45 | $32.45 | $13.57 |
| 0040 | Removing curb and gutter (206D003) | LF | 13 | $15.60 | $18.59 | $31.46 | $25.96 | $5.41 |
| 0050 | Removing concrete flume (206D007) | LF | 315 | $11.44 | $25.00 | $11.69 | $21.64 | $9.98 |
| 0060 | Removing headwalls (206E000) | EACH | 2 | $97.50 | $624.88 | $204.49 | $865.36 | $74.58 |
| 0070 | Removing inlets (206E001) | EACH | 3 | $780.00 | $624.88 | $1,022.46 | $1,298.03 | $176.04 |
| 0080 | Removing inlets (partial) (206E042) | EACH | 1 | $780.00 | $624.88 | $1,226.95 | $648.99 | $2,031.14 |
| 0090 | Unclassified excavation (210A000) | CY | 1,439 | $18.59 | $26.47 | $43.82 | $35.95 | $33.72 |
| 0100 | Borrow excavation (loose truckbed measurement)(A-2-4(0) or A-4(0) ) (210D022) | CY | 3,240 | $23.23 | $22.57 | $28.76 | $39.94 | $26.29 |
| 0110 | Borrow excavation (underwater backfill) (210E000) | CY | 100 | $23.23 | $33.95 | $54.77 | $37.46 | $28.30 |
| 0120 | Structure excavation (214A000) | CY | 158 | $17.21 | $14.57 | $24.48 | $30.90 | $12.82 |
| 0130 | Foundation backfill, commercial (214B001) | CY | 28 | $83.43 | $117.32 | $123.95 | $213.60 | $155.74 |
| 0140 | Roadbed processing (230A000) | RBST | 24 | $156.25 | $137.77 | $1,307.51 | $687.57 | $529.59 |
| 0150 | Geosynthetic reinforcement for reinforced slopes, type 2 (243A021) | SY | 100 | $18.75 | $4.22 | $18.80 | $13.21 | $2.73 |
| 0160 | Geosynthetic reinforcement for soft soil stabilization, type 2 (243A034) | SY | 25 | $31.25 | $4.70 | $18.80 | $13.21 | $33.17 |
| 0170 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 2,956 | $27.91 | $34.61 | $39.51 | $47.17 | $56.03 |
| 0180 | Bituminous treatment A (401A000) | SY | 2,956 | $2.01 | $1.20 | $1.89 | $2.02 | $2.00 |
| 0190 | Tack coat (405A000) | GAL | 1,826 | $6.90 | $6.00 | $4.12 | $7.09 | $6.26 |
| 0200 | Planing existing pavement (approximately 1.10" thru 2.0" thick) (408A052) | SY | 10,592 | $1.15 | $2.76 | $6.22 | $1.18 | $6.26 |
| 0210 | Material remixing device (410H000) | EACH | 1 | $11,500 | $17,987 | $15,600 | $11,816 | $12,515 |
| 0220 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 982 | $149.50 | $141.64 | $142.85 | $153.61 | $168.95 |
| 0230 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 320 | $147.20 | $158.51 | $160.43 | $151.25 | $200.23 |
| 0240 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 50 | $161.00 | $141.64 | $219.92 | $165.43 | $200.24 |
| 0250 | Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424B657) | TON | 215 | $155.25 | $153.06 | $149.96 | $159.52 | $200.23 |
| 0260 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 328 | $155.25 | $141.68 | $158.55 | $159.52 | $200.23 |
| 0270 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 91 | $52.15 | $81.39 | $132.18 | $77.64 | $49.42 |
| 0280 | 30" roadway pipe (class 3 R.C.) (530A003) | LF | 20 | $128.29 | $193.74 | $307.16 | $152.78 | $102.93 |
| 0290 | 48" roadway pipe (class 3 R.C.) (530A006) | LF | 8 | $259.05 | $468.17 | $404.33 | $491.74 | $181.77 |
| 0300 | Mobilization (600A000) | LS | 1 | $80,850 | $83,124 | $143,000 | $157,447 | $164,306 |
| 0310 | 6" underdrain pipe, type 8 (schedule 40) (606A018) | LF | 100 | $105.30 | $46.44 | $74.16 | $44.69 | $48.32 |
| 0320 | Separation geotextile (608A000) | SY | 18 | $31.25 | $8.57 | $11.33 | $11.10 | $43.13 |
| 0330 | Filter blanket, geotextile (610D003) | SY | 288 | $7.18 | $6.15 | $7.48 | $9.52 | $4.36 |
| 0340 | Tied concrete block mat (610E000) | SY | 4,824 | $47.87 | $63.57 | $58.76 | $64.66 | $68.81 |
| 0350 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 2 | $2,190.00 | $1,493.90 | $1,314.00 | $2,568.14 | $2,283.93 |
| 0360 | 30" roadway pipe end treatment, class 1 (619A004) | EACH | 1 | $3,540.00 | $1,723.73 | $1,971.00 | $3,134.09 | $3,691.83 |
| 0370 | 18" roadway pipe end treatment, class 1(type HW-620) (619A031) | EACH | 1 | $10,804 | $5,745.77 | $3,966.64 | $1,508.85 | $11,758 |
| 0380 | 48" roadway pipe end treatment, class 1(type HW-620) (619A036) | EACH | 1 | $17,285 | $9,193.22 | $7,933.28 | $14,470 | $18,810 |
| 0390 | Minor structure concrete (620A000) | CY | 1 | $3,600.00 | $1,608.81 | $1,971.00 | $2,094.29 | $3,754.40 |
| 0400 | Junction boxes, type 1 or 1P (621A011) | EACH | 3 | $3,437.50 | $3,511.39 | $3,794.14 | $6,604.19 | $1,630.14 |
| 0410 | Junction box units, type 1 or 1P (621B011) | EACH | 2 | $1,375.00 | $659.54 | $712.07 | $3,204.07 | $736.49 |
| 0420 | Inlets, type C (partial) (621C129) | EACH | 1 | $5,815.55 | $4,022.04 | $2,737.50 | $6,274.96 | $6,328.67 |
| 0430 | Inlet units, type C (621D002) | EACH | 1 | $1,500.00 | $861.86 | $821.25 | $3,470.40 | $2,238.25 |
| 0440 | Steel beam guardrail, class A, type 2 (8'-0" post) (630A034) | LF | 1,350 | $29.31 | $26.95 | $25.68 | $27.71 | $29.35 |
| 0450 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 8 | $3,468.75 | $3,188.90 | $3,038.63 | $3,279.06 | $3,472.82 |
| 0460 | Topsoil (650A000) | CY | 382 | $30.02 | $47.26 | $49.77 | $54.21 | $39.08 |
| 0470 | Seeding (652A100) | ACRE | 2 | $2,430.00 | $2,068.48 | $1,971.00 | $2,067.88 | $1,752.06 |
| 0480 | Solid sodding (bermuda) (654A001) | SY | 5,121 | $6.89 | $5.86 | $5.58 | $6.50 | $6.38 |
| 0490 | Mulching (656A010) | ACRE | 2 | $1,485.00 | $2,068.48 | $1,971.00 | $886.23 | $1,251.47 |
| 0500 | Temporary seeding (665A000) | ACRE | 5 | $2,430.00 | $603.31 | $574.88 | $413.57 | $1,126.32 |
| 0510 | Temporary mulching (665B001) | TON | 15 | $1,620.00 | $517.12 | $492.75 | $354.49 | $531.87 |
| 0520 | Sand bags (665G000) | EACH | 250 | $3.38 | $9.19 | $8.76 | $9.45 | $12.51 |
| 0530 | Temporary riprap, class 2 (665I000) | TON | 50 | $116.10 | $111.76 | $120.93 | $189.69 | $106.02 |
| 0540 | Silt fence (665J002) | LF | 3,943 | $5.40 | $4.60 | $4.38 | $5.32 | $5.63 |
| 0550 | Drainage sump excavation (665K000) | CY | 100 | $105.30 | $24.71 | $21.36 | $70.42 | $5.80 |
| 0560 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 37 | $123.50 | $112.49 | $117.78 | $119.82 | $77.59 |
| 0570 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 10 | $212.50 | $112.49 | $117.78 | $115.83 | $104.33 |
| 0580 | Silt fence removal (665O001) | LF | 3,943 | $3.13 | $1.44 | $1.37 | $1.77 | $1.88 |
| 0590 | Inlet protection, stage 3 or 4 (665P005) | EACH | 4 | $840.00 | $517.12 | $492.75 | $413.58 | $813.46 |
| 0600 | Wattle (665Q002) | LF | 1,250 | $9.25 | $10.63 | $10.13 | $10.63 | $11.26 |
| 0610 | Pest control treatment (666A001) | ACRE | 2 | $300.00 | $287.29 | $273.75 | $472.66 | $500.59 |
| 0620 | Construction safety fence (674A000) | LF | 100 | $4.50 | $3.68 | $6.61 | $3.43 | $4.53 |
| 0630 | Geometric controls (680A001) | LS | 1 | $15,000 | $22,783 | $10,166 | $28,939 | $11,658 |
| 0640 | Construction fuel (maximum bid limited to $ 68,300.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0650 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 2 | $5,577.50 | $4,424.24 | $4,215.75 | $4,549.32 | $4,818.15 |
| 0660 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $5,577.50 | $4,424.24 | $4,215.75 | $4,549.32 | $4,818.15 |
| 0670 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 1,037 | $1.15 | $1.15 | $1.10 | $1.18 | $1.25 |
| 0680 | Solid temporary traffic stripe (701C001) | MI | 12 | $977.50 | $861.87 | $821.25 | $886.23 | $938.60 |
| 0690 | Traffic control markings, class 2, type A (703A002) | SF | 4,322 | $6.90 | $4.88 | $4.65 | $5.02 | $5.32 |
| 0700 | Traffic control legends, class 2, type A (703B002) | SF | 180 | $6.90 | $6.03 | $5.75 | $6.20 | $6.57 |
| 0710 | Temporary traffic control markings (703D001) | SF | 292 | $2.30 | $1.44 | $1.37 | $1.48 | $1.56 |
| 0720 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 72 | $6.33 | $5.75 | $5.48 | $5.91 | $6.26 |
| 0730 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 171 | $6.33 | $5.75 | $5.48 | $5.91 | $6.26 |
| 0740 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 36 | $6.33 | $5.75 | $5.48 | $5.91 | $6.26 |
| 0750 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 184 | $6.33 | $5.75 | $5.48 | $5.91 | $6.26 |
| 0760 | Roadway sign relocation (711A000) | LS | 1 | $862.50 | $1,149.15 | $1,095.00 | $1,181.64 | $938.60 |
| 0770 | Construction signs (740B000) | SF | 675 | $8.05 | $6.32 | $6.02 | $6.50 | $8.76 |
| 0780 | Channelizing drums (740D000) | EACH | 250 | $55.20 | $22.98 | $21.90 | $23.63 | $60.07 |
| 0790 | Cones (36 inches high) (740E000) | EACH | 250 | $18.40 | $39.07 | $17.52 | $18.91 | $20.02 |
| 0800 | Barricades, type III (740F002) | EACH | 4 | $212.75 | $103.43 | $98.55 | $106.35 | $231.52 |
| 0810 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $1,380.00 | $1,120.43 | $1,067.63 | $1,152.10 | $1,501.77 |
| 0820 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $3,220.00 | $2,011.02 | $1,916.25 | $2,067.88 | $3,504.11 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of April 25, 2025. Compiled by Mirage Metrics.