ALDOT letting results, December 6, 2024

34 contracts let by Alabama DOT on December 6, 2024, $166,613,875 in low bids, a median of 3 bidders per contract.

Owner
Alabama DOT
Contracts
34
Low bids, total
$166,613,875
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20241206002GRADE, DRAIN, PAVE, BRIDGE REMOVAL, AND BRIDGE REPLACEMENT ON I-65 FROM THE SR-3 (US-31) INTERCHANGE NORTH OF CALERA TO A POINT 0.200 MILE SOUTH OF THE CR-87 IN03053Dunn Construction Company, Inc.$44,058,580$44,622,823+1.0%ALDOT
20241206018RECONSTRUCTION (PAVEMENT REMOVAL, GRADE, DRAIN, BASE, PAVE) ON I-59 (SBR) FROM 0.390 MILE SOUTH OF CR-276 (STEPHENS GAP ROAD) TO A POINT 0.500 MILE SOUTH OF SR-0103, 01055Vulcan Materials Asphalt and Construction,$40,736,789$41,675,000+2.0%ALDOT
20241206027TRUCK PASSING LANES ADDITIONS AND RESURFACING ON SR-1 (US-431) FROM 0.548 MILE SOUTH OF THE JUNCTION OF CR-93 NORTH OF LAFAYETTE TO MP 175.908 NORTH OF FIVE POI04032Gary Ingram Grading & Paving, Inc.$8,176,452$8,727,357+7.0%ALDOT
20241206049PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-185 FROM THE JUNCTION OF WILLOW LANE IN GREENVILLE TO THE LOWNDES COUNTY LINE06041Apac-Alabama, Inc.$4,261,916ALDOT
20241206007BRIDGE REPLACEMENT ON SR-23 AT A BRANCH OF LITTLE CANOE CREEK SOUTHEAST OF SPRINGVILLE03014Vulcan Materials Asphalt and Construction,$3,966,290$4,159,477+5.0%ALDOT
20241206015MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-3 (US-31) FROM A POINT NORTH OF THE ALABAMA RIVER BRIDGE (MP 186.300) TO THE INTERSECTION OF SR-06013Asphalt Contractors, Inc.$3,939,446$3,981,148+1.0%ALDOT
20241206030RESURFACING (SCRUB SEAL), GUARDRAIL INSTALL, AND STRIPE ON SR-38 (US-280) FROM THE JUNCTION OF SR-22 TO A POINT 0.210 MILE EAST OF SR-63 IN ALEXANDER CITY04011Gary Ingram Grading & Paving, Inc.$3,908,859ALDOT
20241206031RESURFACE, SIGNAL UPGRADES (BACKPLATE REPLACEMENTS), STRIPE ON SR-42 (US-98) FROM THE INTERSECTION OF SR-104 TO A POINT 0.460 MILE SOUTH OF THE INTERSECTION OF 09023Mobile Asphalt Company, LLC$3,856,212$3,928,269+2.0%ALDOT
20241206057SAFETY WIDENING, MICRO-MILL, RESURFACING, AND TRAFFIC STRIPE ON SR-123 FROM THE INTERSECTION OF ROY PARKER ROAD IN OZARK TO THE JUNCTION SR-51 IN ARITON07043Wiregrass Construction Company, Inc.$3,741,058$3,909,779+5.0%ALDOT
20241206044MICRO-MILLING, RESURFACING, GUARDRAIL, AND TRAFFIC STRIPE ON SR-79 FROM THE JUNCTION OF SR-1 (US-431) TO THE JACKSON COUNTY LINE01044Rogers Group, Inc.$3,663,390$3,840,976+5.0%ALDOT
20241206048PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-167 FROM THE GENEVA COUNTY LINE TO THE JUNCTION OF SR-192 IN ENTERPRISE07023Wiregrass Construction Company, Inc.$3,554,777$3,655,413+3.0%ALDOT
20241206045RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-87 FROM PEA CREEK NORTH OF ELBA TO THE PIKE COUNTY LINE07023Apac-Alabama, Inc.$3,472,634$3,698,693+7.0%ALDOT
20241206055SAFTEY WIDENING, RESURFACE (SCRUB SEAL), GUARDRAIL, & STRIPE ON SR-18 FROM A POINT 0.710 MILE EAST OF THE JUNCTION OF CR-31 TO THE JUNCTION OF 10TH STREET NORTH10011S. T. Bunn Construction Company, Inc.$3,311,001ALDOT
20241206021MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, AND STRIPE ON I-59 FROM THE GREENE COUNTY LINE TO THE SR-300 INTERCHANGE SOUTHWEST OF TUSCALOOSA05022S. T. Bunn Construction Company, Inc.$3,220,579$3,295,049+2.0%ALDOT
20241206040PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-14 FROM THE JUNCTION OF JACKSON STREET IN ELMORE TO THE JUNCTION OF SR-212 IN WETUMPKA06013Asphalt Contractors, Inc.$3,058,821$3,108,970+2.0%ALDOT
20241206051MICRO-MILL, RESURFACE (SCRUB SEAL), GUARDRAIL, AND STRIPE ON SR-159 FROM THE JUNCTION OF FOX RIDGE DRIVE NORTH OF GORDO TO THE FAYETTE COUNTY LINE10032S. T. Bunn Construction Company, Inc.$2,726,071$3,298,233+21%ALDOT
20241206056SAFETY WIDEN, RESURFACING, ADA IMPROVEMENTS, SIGNS, & STRIPE ON SR-28 FROM THE JUNCTION OF SR-7 (US-11) IN LIVINGSTON TO THE JUNCTION OF CR-2105061S. T. Bunn Construction Company, Inc.$2,487,677ALDOT
20241206029PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM A POINT 0.25 MILE WEST OF LAWRENCE DRIVE TO THE JUNCTION OF SR-19206023Wiregrass Construction Company, Inc.$2,429,185$2,513,018+3.0%ALDOT
20241206043MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-51 FROM A POINT 0.030 MILE NORTH OF THE JUNCTION OF WEST STREET TO THE JUNCTION OF SR-23907062Apac-Alabama, Inc.$2,384,005$2,548,720+7.0%ALDOT
20241206052RESURFACING (SCRUB SEAL), GUARDRAIL INSTALL, AND STRIPE ON SR-19 FROM THE LAMAR COUNTY LINE TO THE JUNCTION OF SENTRY ROAD IN HAMILTON10092S. T. Bunn Construction Company, Inc.$2,309,263$2,496,050+8.0%ALDOT
20241206059RESURFACING, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS09023Mobile Asphalt Company, LLC$2,201,979$2,381,995+8.0%ALDOT
20241206028MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) FROM PLAZA COURT TO A POINT EAST OF CANE CREEK TO INCLUDE THE INTERCHANGE RAMPS AT CR-312 (HALEY 02013Rogers Group, Inc.$1,856,296$2,088,044+12%ALDOT
20241206053RESURFACE (SCRUB SEAL), GUARDRAIL, AND TRAFFIC STRIPE ON SR-41 FROM THE JUNCTION OF SR-10 TO THE DALLAS COUNTY LINE08042Asphalt Contractors, Inc.$1,775,646$1,792,172+1.0%ALDOT
20241206046RESURFACING AND TRAFFIC STRIPE ON SR-137 FROM THE FLORIDA STATE LINE TO THE JUNCTION OF SR-15 (US-29) SOUTHWEST OF CAROLINA07033Asphalt Paving Systems Inc$1,757,677$1,768,895+1.0%ALDOT
20241206041RESURFACING AND TRAFFIC STRIPE ON SR-21 FROM A POINT 0.538 MILE SOUTH OF THE JUNCTION OF CR-45 TO THE SOUTH END OF THE BRIDGE OVER BIG SWAMP CREEK06053Asphalt Paving Systems Inc$1,647,937$1,739,380+6.0%ALDOT
20241206047RESURFACING (MICRO-SURFACING SEAL COAT, TYPE II) AND STRIPE ON SR-165 FROM 0.250 MILE SOUTH OF SR-208 TO 0.360 MILE SOUTH OF NEW HOPE CHURCH ROAD06063Asphalt Paving Systems Inc$1,465,379$1,625,620+11%ALDOT
20241206032MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-133 FROM THE JUNCTION OF SR-2 TO THE JUNCTION OF SR-17 IN FLORENCE02013Rogers Group, Inc.$1,442,975$1,578,772+9.0%ALDOT
20241206012ROADWAY IMPROVEMENTS (DRAINAGE STRUCTURE AND ROADWAY REPAIR) ON SR-17 FROM A POINT SOUTH OF THE JUNCTION OF SPARKS ROAD NORTHEAST OF TOXEY08042C. Thornton, Inc.$1,208,506$1,795,004+49%ALDOT
20241206058RESURFACE, SIGNAL UPGRADES (BACKPLATE REPLACEMENTS), STRIPE ON SR-181 FROM THE JUNCTION OF MALBIS LANE TO THE JUNCTION OF SR-3 (US-31)09023H. O. Weaver & Sons, Inc.$1,109,001$1,117,777+1.0%ALDOT
20241206062INTERSECTION IMPROVEMENTS AND TRAFFIC SIGNAL UPGRADES ON SR-3 (US-31) AT SR-91 IN HANCEVILLE01046Rogers Group, Inc.$749,325$843,737+13%ALDOT
20241206063ACCESS MANAGEMENT, SIGNAL UPGRADES, & TURN LANE ADDITION ON SR-69 AT SUNSET DRIVE IN GUNTERSVILLE01046Rogers Group, Inc.$665,454$713,816+7.0%ALDOT
20241206042PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-28 FROM THE INTERSECTION OF SR-10 TO THE JUNCTION OF SR-41 IN CAMDEN083Asphalt Contractors, Inc.$588,017$593,656+1.0%ALDOT
20241206064ROADWAY SAFETY IMPROVEMENTS (ROADWAY LIGHTING INSTALLATION) ON SR-8 (US-80) AT SR-28 AND CR-25 WEST OF THE MARENGO COUNTY LINE05065Temple J Electric, LLC$483,969$486,517+1.0%ALDOT
20241206006BRIDGE DECK REHABILITATION BRIDGE DECK REHABILITATION (HYDROBLASTING AND TRAFFIC STRIPE) ON SR-15 (US-29) OVER I-85 IN OPELIKA06062American Contracting & Services, Inc.$398,709$618,758+55%ALDOT
ALDOT contracts let on December 6, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy