H. O. Weaver & Sons, Inc.: ALDOT bid record
H. O. Weaver & Sons, Inc. submitted 62 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 31 JAN 2025, and was the low bidder on 28 of them (45%). When it was not low, its total sat a median +4.0% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $73,652,217
- Latest bid
- 31 JAN 2025
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 23 | 13 | 57% |
| 2023 | 19 | 6 | 32% |
| 2024 | 16 | 7 | 44% |
| 2025 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0901 | 14 | 8 | 57% |
| 0902 | 14 | 4 | 29% |
| 0804 | 12 | 8 | 67% |
| 0903 | 8 | 6 | 75% |
| 0803 | 7 | 0 | 0% |
| 0802 | 4 | 1 | 25% |
| 08 | 2 | 0 | 0% |
| 0802, 0901 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Material remixing device | 410H000 | EACH | 55 | 27 (49%) | $41,436 | $34,670 |
| Pest control treatment | 666A001 | ACRE | 32 | 21 (66%) | $60.00 | $115.00 |
| Channelizing drums | 740D000 | EACH | 34 | 19 (56%) | $25.96 | $33.00 |
| Planing existing pavement (approximately 1.10" thru 2.0" thick) | 408A052 | SY | 29 | 15 (52%) | $1.38 | $2.88 |
| Tack coat | 405A000 | GAL | 44 | 11 (25%) | $4.90 | $4.55 |
| Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D | 424A360 | TON | 34 | 11 (32%) | $112.80 | $120.00 |
| Micro-milling existing pavement (approximately 0.00" thru 1.00" thick) | 408B000 | SY | 15 | 11 (73%) | $1.05 | $1.75 |
| Portable sequential arrow and chevron sign unit | 741C010 | EACH | 23 | 10 (43%) | $1,000.00 | $1,597.10 |
| Wattle | 665Q002 | LF | 50 | 9 (18%) | $11.15 | $10.75 |
| Silt fence removal | 665O001 | LF | 41 | 9 (22%) | $1.75 | $1.45 |
| Machine grading shoulders | 212A000 | STA | 31 | 9 (29%) | $82.50 | $65.00 |
| Construction signs | 740B000 | SF | 60 | 8 (13%) | $6.42 | $7.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mobile Asphalt Company, LLC | 55 | 29 of 55 |
| John G. Walton Construction Company, Inc. | 18 | 5 of 18 |
| Wiregrass Construction Company, Inc. | 11 | 1 of 11 |
| S. T. Bunn Construction Company, Inc. | 5 | 2 of 5 |
| Asphalt Contractors, Inc. | 4 | 3 of 4 |
| Apac-Alabama, Inc. | 2 | 2 of 2 |
| McElhenney Construction Co., LLC | 1 | 0 of 1 |
| McInnis Construction, LLC | 1 | 1 of 1 |
| Scott Bridge Company, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JAN 2025 | 20250131014 | 0903 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM LITTLE ESCAMBIA CREEK TO A POINT 0.500 MILE SOUTH OF THE JUNCTI | 1 of 2 | $2,950,940 | Low, 2.0% under the second |
| 31 JAN 2025 | 20250131033 | 0804 | MICRO-MILL, RESURFACE, STEEL BLOCKOUT REPLACEMENT, & STRIPE ON SR-13 (US-43) FROM THE MOBILE COUNTY LINE TO BILBO CREEK BRIDGE SOUTHEAST OF | 2 of 3 | $2,335,468 | +14% |
| 31 JAN 2025 | 20250131037 | 0902 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-59 FROM THE JUNCTION OF SR-287 TO THE JUNCTION OF MCMILLAN ROAD NORTHEAST OF STOCKTON | 3 of 3 | $1,951,935 | +14% |
| 31 JAN 2025 | 20250131044 | 0901 | RESURFACING, TRAFFIC SIGNAL UPGRADES, AND TRAFFIC STRIPE ON SR-188 FROM A POINT NORTH OF THE JUNCTION OF FIELDS LANE (MP 8.364) TO THE JUNCT | 1 of 3 | $3,929,737 | Low, 1.0% under the second |
| 06 DEC 2024 | 20241206031 | 0902 | RESURFACE, SIGNAL UPGRADES (BACKPLATE REPLACEMENTS), STRIPE ON SR-42 (US-98) FROM THE INTERSECTION OF SR-104 TO A POINT 0.460 MILE SOUTH OF | 2 of 3 | $3,928,269 | +2.0% |
| 06 DEC 2024 | 20241206042 | 08 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-28 FROM THE INTERSECTION OF SR-10 TO THE JUNCTION OF SR-41 IN CAMDEN | 2 of 3 | $593,656 | +1.0% |
| 06 DEC 2024 | 20241206058 | 0902 | RESURFACE, SIGNAL UPGRADES (BACKPLATE REPLACEMENTS), STRIPE ON SR-181 FROM THE JUNCTION OF MALBIS LANE TO THE JUNCTION OF SR-3 (US-31) | 1 of 3 | $1,109,001 | Low, 1.0% under the second |
| 06 DEC 2024 | 20241206059 | 0902 | RESURFACING, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS | 2 of 3 | $2,381,995 | +8.0% |
| 08 NOV 2024 | 20241108022 | 0902 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-10 FROM THE SR-181 INTERCHANGE TO THE SR-59 INTERCHANGE IN LOXLEY | 1 of 3 | $3,302,817 | Low, 6.0% under the second |
| 08 NOV 2024 | 20241108026 | 0804 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM THE JUNCTION OF NELLIE HILL ROAD TO THE JUNCTION OF CR-35 (MORNING STAR | 1 of 2 | $342,487 | Low, 23% under the second |
| 08 NOV 2024 | 20241108027 | 0804 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE JUNCTION OF WEST POINT DRIVE TO A POINT 0.600 MILE SOUTH OF THE JUN | 1 of 2 | $2,226,047 | Low, 4.0% under the second |
| 08 NOV 2024 | 20241108034 | 0901 | SAFETY WIDENING, MICRO-MILL, RESURFACE, AND TRAFFIC STRIPE ON SR-158 FROM THE INTERSECTION OF SHELL STREET TO THE I-65 INTERCHANGE AT THE NO | 1 of 3 | $523,251 | Low, 28% under the second |
| 08 NOV 2024 | 20241108035 | 0902 | SAFETY WIDENING, RESURFACING, BRIDGE RAIL RETROFIT, & STRIPE ON SR-287 FROM THE JUNCTION OF SR-59 IN BAY MINETTE TO THE I-65 INTERCHANGE (MP | 2 of 3 | $3,794,352 | +11% |
| 28 JUN 2024 | 20240628027 | 0901 | PLANING, RESURFACING, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON SR-193 FROM THE JUNCTION OF LAURENDINE ROAD TO A POINT NORTH OF THE CSX RAILROA | 3 of 3 | $1,422,827 | +10% |
| 31 MAY 2024 | 20240531035 | 0903 | PLANING, RESURFACING, TRAFFIC SIGNALS UPGRADES, AND STRIPE ON SR-21 FROM THE FLORIDA STATE LINE TO THE INTERSECTION OF SUNSET DRIVE IN ATMOR | 1 of 2 | $2,050,369 | Low, 24% under the second |
| 31 MAY 2024 | 20240531038 | 0902 | NEW ROADWAY CONSTRUCTION OF THE SR-161 CONNECTOR FROM A POINT NORTH OF THE JUNCTION OF CR-4 TO THE JUNCTION OF THE FOLEY BEACH EXPRESS | 3 of 4 | $30,670,906 | +2.0% |
| 23 FEB 2024 | 20240223011 | 0903 | RESURFACE (MICRO-SURFACING SEAL COAT) & SIGNAL UPGRADES ON SR-3 (US-31) FROM OLD HIGHWAY 31 (MP 64.774) TO A POINT SOUTH OF THE BURNT CORN C | 2 of 3 | $2,364,613 | +1.0% |
| 23 FEB 2024 | 20240223018 | 0803 | RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON SR-83 FROM THE CONECUH COUNTY LINE TO THE JUNCTION OF SR-47 SOUTHEAST OF BEATRICE | 3 of 3 | $912,004 | +16% |
| 26 JAN 2024 | 20240126022 | 0901 | PLANE, RESURFACE, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON SR-16 (US-90) FROM THE EAST ABUTMENT OF THE FOWL RIVER BRIDGE TO THE HALLS MILL CRE | 1 of 3 | $4,877,482 | Low, 14% under the second |
| 26 JAN 2024 | 20240126026 | 0903 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-41 FROM THE I-65 INTERCHANGE (MP 24.529) TO THE JUNCTION OF SR- 12 (US-84) IN REPTON | 3 of 3 | $2,197,881 | +12% |
| 08 DEC 2023 | 20231208020 | 0804 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM THE MISSISSIPPI STATE LINE TO THE INTERSECTION OF SR-17 IN SILAS | 2 of 2 | $2,401,420 | +2.0% |
| 08 DEC 2023 | 20231208021 | 0804 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM 0.340 MILE WEST OF THE JUNCTION OF CR-22 (MP 40.320) TO THE INTERSECTIO | 1 of 2 | $2,502,997 | Low, 1.0% under the second |
| 08 DEC 2023 | 20231208023 | 0902 | RESURFACING AND BRIDGE RAIL RETRO FIT ON SR-42 (US-98) FROM 0.460 MILE SOUTH OF THE INTERSECTION OF CR-32 TO THE JUNCTION OF CR-11 IN BARNWE | 3 of 3 | $1,108,778 | +4.0% |
| 08 DEC 2023 | 20231208036 | 0804 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-178 FROM THE JUNCTION OF SR-13 (US-43) TO THE JUNCTION OF CR-27 (WEST MAIN STREET) IN F | 1 of 2 | $698,605 | Low, 4.0% under the second |
| 08 DEC 2023 | 20231208037 | 0901 | PLANE, RESURFACE, TRAFFIC SIGNAL UPGRADES, & STRIPE ON SR-217 FROM THE INTERSECTION OF SR-17 (US-45) TO THE JUNCTION OF LAKEVIEW RIDGE LANE | 2 of 3 | $3,811,263 | 0.0% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.