John G. Walton Construction Company, Inc.: ALDOT bid record
John G. Walton Construction Company, Inc. submitted 24 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 30 AUG 2024, and was the low bidder on 9 of them (38%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $45,586,833
- Latest bid
- 30 AUG 2024
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 13 | 2 | 15% |
| 2023 | 7 | 4 | 57% |
| 2024 | 4 | 3 | 75% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0901 | 14 | 5 | 36% |
| 0902 | 8 | 3 | 38% |
| 0803 | 1 | 0 | 0% |
| 09 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Tack coat | 405A000 | GAL | 23 | 13 (57%) | $4.82 | $4.55 |
| Wattle | 665Q002 | LF | 22 | 9 (41%) | $10.01 | $10.75 |
| Silt fence removal | 665O001 | LF | 21 | 9 (43%) | $1.65 | $1.45 |
| Material remixing device | 410H000 | EACH | 18 | 9 (50%) | $51,064 | $34,670 |
| Solid sodding (bermuda) | 654A001 | SY | 18 | 8 (44%) | $5.98 | $8.94 |
| Silt fence | 665J002 | LF | 21 | 7 (33%) | $4.72 | $5.00 |
| Topsoil | 650A000 | CY | 20 | 7 (35%) | $43.85 | $45.00 |
| Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D | 424A360 | TON | 18 | 6 (33%) | $124.81 | $120.00 |
| Machine grading shoulders | 212A000 | STA | 8 | 6 (75%) | $96.39 | $65.00 |
| Traffic control markings, class 2, type A | 703A002 | SF | 21 | 5 (24%) | $6.05 | $6.00 |
| Solid temporary traffic stripe | 701C001 | MI | 21 | 5 (24%) | $1,062.50 | $1,064.57 |
| Planing existing pavement (approximately 1.10" thru 2.0" thick) | 408A052 | SY | 18 | 5 (28%) | $2.00 | $2.88 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H. O. Weaver & Sons, Inc. | 18 | 13 of 18 |
| Mobile Asphalt Company, LLC | 16 | 11 of 16 |
| McElhenney Construction Co., LLC | 4 | 0 of 4 |
| Rob Middleton Construction, LLC | 3 | 0 of 3 |
| McInnis Construction, LLC | 2 | 0 of 2 |
| Arrington Curb & Excavation, Inc. | 1 | 0 of 1 |
| Scott Bridge Company, Inc. | 1 | 0 of 1 |
| PL Russell LLC | 1 | 0 of 1 |
| Pine City Contracting, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 AUG 2024 | 20240830011 | 0901 | ROADWAY IMPROVEMENTS (LEFT TURN BYPASS LANE ADDITION) ON SR-17 (US-45) AND SR-57 (US-45) AT VARIOUS LOCATIONS IN THE SOUTHWEST REGION (MOBIL | 1 of 5 | $473,707 | Low, 5.0% under the second |
| 28 JUN 2024 | 20240628027 | 0901 | PLANING, RESURFACING, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON SR-193 FROM THE JUNCTION OF LAURENDINE ROAD TO A POINT NORTH OF THE CSX RAILROA | 1 of 3 | $1,293,777 | Low, 9.0% under the second |
| 31 MAY 2024 | 20240531038 | 0902 | NEW ROADWAY CONSTRUCTION OF THE SR-161 CONNECTOR FROM A POINT NORTH OF THE JUNCTION OF CR-4 TO THE JUNCTION OF THE FOLEY BEACH EXPRESS | 1 of 4 | $29,928,778 | Low, 2.0% under the second |
| 26 JAN 2024 | 20240126022 | 0901 | PLANE, RESURFACE, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON SR-16 (US-90) FROM THE EAST ABUTMENT OF THE FOWL RIVER BRIDGE TO THE HALLS MILL CRE | 3 of 3 | $6,185,647 | +27% |
| 08 DEC 2023 | 20231208007 | 09 | WIDENING FOR THE CENTER TURN LANE ADDITION ON SR-3 (US-31) FROM THE JUNCTION OF OLD HIGHWAY 31 TO 0.265 MILE EAST OF THE JUNCTION OF COLEMAN | 1 of 4 | $1,557,977 | Low, 5.0% under the second |
| 08 DEC 2023 | 20231208023 | 0902 | RESURFACING AND BRIDGE RAIL RETRO FIT ON SR-42 (US-98) FROM 0.460 MILE SOUTH OF THE INTERSECTION OF CR-32 TO THE JUNCTION OF CR-11 IN BARNWE | 1 of 3 | $1,061,947 | Low, 2.0% under the second |
| 08 DEC 2023 | 20231208037 | 0901 | PLANE, RESURFACE, TRAFFIC SIGNAL UPGRADES, & STRIPE ON SR-217 FROM THE INTERSECTION OF SR-17 (US-45) TO THE JUNCTION OF LAKEVIEW RIDGE LANE | 3 of 3 | $4,479,551 | +18% |
| 03 NOV 2023 | 20231103011 | 0901 | RESURFACING, GUARDRAIL UPGRADES, SIGNAL UPGRADES, AND STRIPE ON SR-13 (US-43) FROM THE JUNCTION OF SR-158 IN SARALAND TO THE INTERSECTION OF | 1 of 3 | $3,399,127 | Low, 6.0% under the second |
| 28 JUL 2023 | 20230728028 | 0803 | RESURFACING AND TRAFFIC STRIPE ON CR-35 (JOHN JOHNSTON ROAD) FROM THE JUNCTION OF CR-4 TO THE JUNCTION OF RIVERS ROAD SOUTHWEST OF MCINTOSH. | 2 of 2 | $1,984,834 | +9.0% |
| 07 APR 2023 | 20230407032 | 0901 | INTERSECTION IMPROVEMENTS (ROUNDABOUT INSTALLATION) ON SR-188 AT CR-19 (IRVINGTON BAYOU LA BATRE HIGHWAY) NORTH OF BAYOU LA BATRE | 1 of 2 | $1,794,838 | Low, 45% under the second |
| 27 JAN 2023 | 20230127038 | 0902 | RESURFACE, RAIL IMPROVEMENTS, SIGNAL IMPROVEMENTS, STRIPE ON SR-16 (US-90) FROM THE JUNCTION OF SR-59 IN LOXLEY TO THE JUNCTION OF CR-54 IN | 3 of 3 | $3,486,119 | +4.0% |
| 02 DEC 2022 | 20221202024 | 0901 | PLANING, RESURFACING, TRAFFIC SIGNAL UPDATES, AND STRIPE ON SR-16 (US-90) FROM THE INTERSECTION OF SR-163 TO THE INTERSECTION OF US-98 (BROA | 3 of 3 | $1,782,777 | +33% |
| 02 DEC 2022 | 20221202025 | 0901 | RESURFACE, TRAFFIC SIGNAL UPGRADES, AND TRAFFIC STRIPE ON SR-42 (US-98) FROM THE INTERSECTION OF SOUTH BROAD STREET TO THE JUNCTION OF SOUTH | 2 of 3 | $1,021,527 | +13% |
| 02 DEC 2022 | 20221202032 | 0902 | RESURFACING, GUARDRAIL UPGRADES, SIGNAL UPGRADES, & STRIPE ON SR-42 (US-98) FROM THE D'OLIVE CREEK BRIDGE IN DAPHNE TO A POINT JUST NORTH OF | 2 of 3 | $6,521,077 | +3.0% |
| 02 DEC 2022 | 20221202060 | 0902 | INTERSECTION IMPROVEMENTS (ROUNDABOUT INSTALLATION) ON CR-13 (OBERG ROAD) AT CR-44 (TWIN BEACH ROAD) SOUTH OF FAIRHOPE. | 1 of 3 | $2,395,477 | Low, 3.0% under the second |
| 04 NOV 2022 | 20221104010 | 0901 | 4921(253), CRSAMB-4921(254), CRSAMB-4921(255), CRSAMB-4921(256), CRSAMB-4921(257) MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS | 2 of 2 | $2,342,498 | +5.0% |
| 29 JUL 2022 | 20220729003 | 0901 | BRIDGE REPLACEMENT ON SR-217 OVER BIG CREEK SOUTHWEST OF CITRONELLE | 1 of 2 | $3,681,204 | Low, 5.0% under the second |
| 27 MAY 2022 | 20220527010 | 0901 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-10 FROM A POINT 1.360 MILES EAST OF THE SR-193 INTERCHANGE (MP 18.467) TO THE WALLACE TU | 2 of 3 | $9,448,341 | +3.0% |
| 28 JAN 2022 | 20220128014 | 0901 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-65 FROM 0.560 MILE NORTH OF THE SR-158 UNDERPASS TO 0.410 MILE NORTH OF THE SR-13 (US-43 | 3 of 3 | $3,964,524 | +28% |
| 28 JAN 2022 | 20220128030 | 0902 | PLANING, RESURFACING, AND TRAFFIC STIPE ON SR-42 (US-98) FROM A POINT WEST OF THE ELBERTA CITY LIMITS TO A POINT ON THE PERDIDO BAY BRIDGE ( | 3 of 3 | $3,482,072 | +20% |
| 28 JAN 2022 | 20220128031 | 0901 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-42 (US-98) FROM THE JUNCTION OF SNOW ROAD TO THE JUNCTION OF MAGNOLIA GROVE PARKWAY SOUTHWEST | 3 of 3 | $3,319,685 | +15% |
| 28 JAN 2022 | 20220128040 | 0901 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-17 (US-45) FROM THE JUNCTION OF SPRINGHILL AVENUE TO THE I-65 INTERCHANGE IN PRICHARD | 3 of 3 | $1,984,198 | +17% |
| 28 JAN 2022 | 20220128057 | 0902 | PLANING, RESURFACING, STEEL BLOCKOUT REPLACEMENT ON SR-59 FROM THE JUNCTION OF MCMILLAN ROAD TO THE INTERSECTION OF CR-80 NORTHEAST OF STOCK | 3 of 3 | $3,557,056 | +32% |
| 28 JAN 2022 | 20220128060 | 0902 | SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-181 FROM THE JUNCTION OF QUAIL CREEK DRIVE IN FAIRHOPE TO THE JUNCTION OF MO | 2 of 2 | $612,477 | +9.0% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.