ALDOT letting results, January 26, 2024

22 contracts let by Alabama DOT on January 26, 2024, $76,636,203 in low bids, a median of 2.5 bidders per contract.

Owner
Alabama DOT
Contracts
22
Low bids, total
$76,636,203
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20240126052ADDITIONAL LANES AND ROUTE RELOCATION ON SR-52 FROM EAST OF COX STREET IN SLOCOMB TO THE JUNCTION OF SCOTT ROAD IN MALVERN07024Wiregrass Construction Company, Inc.$22,995,218$23,869,299+4.0%ALDOT
20240126001BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER NORTHEAST OF LOCUST FORK03025Whitaker Contracting Corporation$9,178,023$10,747,694+17%ALDOT
20240126022PLANE, RESURFACE, TRAFFIC SIGNAL UPGRADES, AND STRIPE ON SR-16 (US-90) FROM THE EAST ABUTMENT OF THE FOWL RIVER BRIDGE TO THE HALLS MILL CREEK BRIDGE09013H. O. Weaver & Sons, Inc.$4,877,482$5,575,125+14%ALDOT
20240126027MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-48 FROM 0.280 MILE WEST OF THE JUNCTION OF CR-531 (MP 24.961) TO THE GEORGIA STATE LINE04042Apac-Alabama, Inc.$4,129,715$4,181,960+1.0%ALDOT
20240126037RESURFACING, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-34 FROM THE ST. CLAIR COUNTY LINE TO THE JUNCTION OF SR-77 IN TALLADEGA04052Vulcan Materials Asphalt and Construction,$3,423,686$4,037,090+18%ALDOT
20240126036SAFETY WIDEN, RESURFACE, GUARDRAIL INSTALL, & STRIPE ON SR-17 FROM THE JUNCTION OF OLD REFORM ROAD TO THE JUNCTION OF CR-9 IN VERNON10011S. T. Bunn Construction Company, Inc.$3,360,039ALDOT
20240126019RESURFACE, GUARDRAIL, STEEL BLOCKOUT REPLACE, AND STRIPE ON SR-8 (US-80) FROM THE JUNCTION OF LEE AVENUE TO THE HALE COUNTY LINE08021S. T. Bunn Construction Company, Inc.$3,194,522ALDOT
20240126032MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-10 FROM THE JUNCTION OF CR-41 (BLUE SPRINGS TOWN LIMITS) TO 0.630 MILE NORTHWEST OF THE JUNCTION OF CR-2507062Wiregrass Construction Company, Inc.$3,069,900$3,312,050+8.0%ALDOT
20240126012RESURFACE (SCRUB SEAL & MICRO-SURFACING SEAL COAT, TYPE II) ON SR-9 (US-331) FROM 0.500 MILE SOUTH OF THE INTERSECTION OF CR-24 TO 0.400 MILE SOUTH OF THE JUNCT06032Whitaker Contracting Corporation$2,975,785$3,618,625+22%ALDOT
20240126038SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND STRIPE ON SR-52 FROM THE INTERSECTION OF LINE STREET IN SAMSON TO THE JUNCTION OF SR-196 IN GENEVA07023Wiregrass Construction Company, Inc.$2,777,116$3,347,128+21%ALDOT
20240126011MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) FROM THE INTERSECTION OF SHAW ROAD TO THE JUNCTION OF YORK LANE WEST OF ATHENS02044Grayson Carter & Son Contracting, Inc.$2,224,270$2,240,823+1.0%ALDOT
20240126013MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-20 FROM THE COLBERT COUNTY LINE TO THE JUNCTION OF CR-585 WEST OF COURTLAND02024Rogers Group, Inc.$2,010,615$2,043,096+2.0%ALDOT
20240126026MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-41 FROM THE I-65 INTERCHANGE (MP 24.529) TO THE JUNCTION OF SR- 12 (US-84) IN REPTON09033Mobile Asphalt Company, LLC$1,962,853$2,078,780+6.0%ALDOT
20240126028MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-71 FROM THE JUNCTION OF SR-35 IN SECTION TO THE JUNCTION OF CR-378 NORTHEAST OF DUTTON01033Rogers Group, Inc.$1,860,372$1,897,040+2.0%ALDOT
20240126025PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-15 (US-29) FROM A POINT NORTH OF THE SR-53 (US-231) OVERPASS TO THE JUNCTION OF NEEDMORE ROAD IN TROY07052Apac-Alabama, Inc.$1,565,130$1,577,751+1.0%ALDOT
20240126014RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 (US-231) IN ROCKFORD FROM 0.560 MILE SOUTH OF THE INTERSECTION OF SR-22 TO THE JUNCTION OF CR-59042Wiregrass Construction Company, Inc.$1,518,149$1,522,3000.0%ALDOT
20240126029MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-110 FROM 0.400 MILE EAST OF THE JUNCTION OF CR-7 TO THE JUNCTION OF SR-6 (US-82)06022Whitaker Contracting Corporation$1,381,359$1,753,754+27%ALDOT
20240126035RESURFACING, TRAFFIC STRIPE, AND TRAFFIC SIGN IMPROVEMENTS ON SR-14 FROM THE JUNCTION OF SR-63 TO THE JUNCTION OF SR-229 IN TALLASSEE06012Whitaker Contracting Corporation$1,252,756$1,352,203+8.0%ALDOT
20240126015MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-35 FROM THE JUNCTION OF SR-273 TO THE DEKALB COUNTY LINE01052Wiregrass Construction Company, Inc.$975,509$1,289,476+32%ALDOT
20240126048INTERSECTION IMPROVEMENTS (TWO-WAY LEFT TURN LANE ADDITION) ON SR-6 (US-82) BETWEEN CR-1 AND CR-37 SOUTHWEST OF BILLINGSLEY06015Asphalt Contractors, Inc.$930,380$1,249,729+34%ALDOT
20240126042MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON GEORGE DOUTHIT DRIVE SOUTHWEST FROM THE JUNCTION OF BRIERWOOD PLACE SOUTHWEST TO THE INTERSECTION OF SR-2104023Apac-Alabama, Inc.$565,688$627,462+11%ALDOT
20240126053MAINTENANCE BRIDGE PAINTING ON I-22 UNDER CR-13; ON I-22 UNDER CR-33; ON I-22 UNDER CR-11; AND ON I-22 UNDER CR-910096Elite Industrial Painting, Inc.$407,634$479,575+18%ALDOT
ALDOT contracts let on January 26, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy