Vulcan Materials Asphalt and Construction,: ALDOT bid record
Vulcan Materials Asphalt and Construction, submitted 104 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 28 AUG 2026, and was the low bidder on 26 of them (25%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $133,420,927
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 15 | 5 | 33% |
| 2023 | 13 | 4 | 31% |
| 2024 | 27 | 6 | 22% |
| 2025 | 23 | 7 | 30% |
| 2026 | 26 | 4 | 15% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0105 | 26 | 8 | 31% |
| 0402 | 18 | 6 | 33% |
| 0302 | 13 | 1 | 8% |
| 0104 | 11 | 2 | 18% |
| 0405 | 7 | 5 | 71% |
| 0404 | 7 | 2 | 29% |
| 0103 | 6 | 0 | 0% |
| 0301 | 2 | 1 | 50% |
| 0204 | 2 | 0 | 0% |
| 0606 | 2 | 0 | 0% |
| 0104, 0105 | 1 | 0 | 0% |
| 0702 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Tack coat | 405A000 | GAL | 91 | 53 (58%) | $4.00 | $4.55 |
| Cones (36 inches high) | 740E000 | EACH | 72 | 36 (50%) | $17.00 | $20.47 |
| Channelizing drums | 740D000 | EACH | 85 | 33 (39%) | $29.50 | $33.00 |
| Scoring bituminous pavement surface | 428A001 | MI | 46 | 31 (67%) | $302.50 | $486.51 |
| Pilot car | 740O000 | EACH | 53 | 22 (42%) | $10,000 | $8,427.51 |
| Solid temporary traffic stripe | 701C001 | MI | 93 | 20 (22%) | $1,195.00 | $1,064.57 |
| Aggregate surfacing (1" down, crusher run) | 430B043 | TON | 49 | 19 (39%) | $75.00 | $70.00 |
| Traffic control markings, class 2, type A | 703A002 | SF | 93 | 17 (18%) | $6.20 | $6.00 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 83 | 17 (20%) | $4,500.00 | $4,427.98 |
| Solid yellow, class 2, type A traffic stripe (5" wide) | 701A230 | MI | 83 | 17 (20%) | $4,470.00 | $4,432.31 |
| Traffic control legends, class 2, type A | 703B002 | SF | 79 | 17 (22%) | $6.75 | $6.53 |
| Scrub seal | 433A000 | SY | 36 | 17 (47%) | $2.58 | $2.97 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 70 | 33 of 70 |
| Alabama Grading & Excavation, LLC. | 27 | 14 of 27 |
| Apac-Alabama, Inc. | 24 | 14 of 24 |
| Rogers Group, Inc. | 23 | 19 of 23 |
| Midsouth Paving, Inc. | 12 | 6 of 12 |
| Grayson Carter & Son Contracting, Inc. | 12 | 11 of 12 |
| Asphalt Paving Systems Inc | 10 | 9 of 10 |
| Whitaker Contracting Corporation | 9 | 8 of 9 |
| Dunn Construction Company, Inc. | 7 | 2 of 7 |
| McElhenney Construction Co., LLC | 7 | 2 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828011 | 0402 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE TO INTERSECTION IMPROVEMENTS (LEFT AND RIGHT TURN LANES) ON CR 109 FROM SR-202 TO MORRISVILLE | 1 of 4 | $2,274,716 | Low, 3.0% under the second |
| 31 JUL 2026 | 20260731011 | 0105 | SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE CALHOUN COUNTY LINE TO THE INTERSECTION OF BANKS S | 1 of 3 | $5,715,319 | Low, 17% under the second |
| 31 JUL 2026 | 20260731017 | 0402 | ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION | 4 of 4 | $9,779,594 | +19% |
| 31 JUL 2026 | 20260731022 | 0105 | ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET | 4 of 5 | $2,675,190 | +25% |
| 26 JUN 2026 | 20260626016 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-68 FROM THE NORTHWEST CITY LIMITS OF COLLINSVILLE (MP 17.610) T | 4 of 4 | $1,297,858 | +31% |
| 26 JUN 2026 | 20260626020 | 0302 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE I-65 | 4 of 4 | $3,668,077 | +14% |
| 29 MAY 2026 | 20260529007 | 0302 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING, RESURFACING (MICRO-SURFACING SEAL COAT, TYPE III), AND TRAFFIC STRIPE) ON CR-12 FROM THE JUNCT | 2 of 2 | $761,711 | +10% |
| 29 MAY 2026 | 20260529019 | 0402 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF MAXWELLBORN ROAD TO THE JUNCTION OF MEMORIAL DRIVE | 3 of 3 | $1,410,652 | +7.0% |
| 29 MAY 2026 | 20260529031 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-168 FROM THE MARSHALL COUNTY LINE (MP 15.110) TO THE JUNCTION OF SR-68 EAST OF ALBERTVI | 5 of 5 | $885,375 | +68% |
| 29 MAY 2026 | 20260529037 | 0402 | RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON OLD GADSDEN HIGHWAY FROM THE JUNCTION OF SR-1 (US-431) TO THE INTERSECTION OF SHAW STREET IN | 3 of 3 | $755,051 | +3.0% |
| 24 APR 2026 | 20260424020 | 0105 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-283 FROM THE JUNCTION OF SR-25 (US-411) TO THE JUNCTION OF SR-9 IN CENTRE | 2 of 3 | $905,623 | +25% |
| 24 APR 2026 | 20260424023 | 0302 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-25 (US-411) FROM THE JUNCTION OF MADDOX FARM ROAD IN ODENVILLE TO | 3 of 5 | $3,135,331 | +19% |
| 24 APR 2026 | 20260424027 | 0302 | SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-25 (US-231) FROM THE JUNCTION OF THE US-231/US-431 ROUNDA | 2 of 4 | $2,036,665 | +15% |
| 27 MAR 2026 | 20260327014 | 0302 | MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-53 (US-231) FROM THE JUNCTION OF SR-79 TO THE JUNC | 3 of 4 | $2,538,661 | +23% |
| 27 MAR 2026 | 20260327021 | 0103 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-75 FROM A POINT 0.470 MILE SOUTH OF THE JUNCTION OF CR-326/CR- 41 TO THE JUNCTION OF 7T | 3 of 4 | $1,656,461 | +21% |
| 27 MAR 2026 | 20260327028 | 0404 | MICRO-MILLING, RESURFACE, GUARDRAIL, LANE REDUCTION, TURN LANE, AND STRIPE, TO INCLUDE GRADING, DRAINAGE, AND PAVEMENT ON SR-46 FROM THE JUN | 3 of 3 | $4,556,706 | +15% |
| 27 MAR 2026 | 20260327031 | 0603 | RESURFACING (MICRO-SURFACING SEAL COAT, TYPE II), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-293 FROM THE JUNCTION OF SR-110 TO THE JU | 2 of 2 | $738,639 | +52% |
| 27 FEB 2026 | 20260227030 | 0104 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-75 FROM THE JUNCTION OF GARY ROAD TO THE INTERSECTION OF CR-198 | 4 of 4 | $1,805,979 | +34% |
| 27 FEB 2026 | 20260227033 | 0402 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-74 FROM SR-21 TO CEDARTOWN HWY (SITE 1) AND ON SR-9 FROM SOUTH OF ROUNDTRE | 1 of 2 | $3,350,562 | Low, 22% under the second |
| 30 JAN 2026 | 20260130001 | 0105 | BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE G | 3 of 6 | $5,798,401 | +19% |
| 30 JAN 2026 | 20260130022 | 0104 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF MILLER ROAD IN ALBERTVILLE TO T | 3 of 4 | $4,338,263 | +46% |
| 30 JAN 2026 | 20260130030 | 0405 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF | 2 of 2 | $2,245,355 | +1.0% |
| 30 JAN 2026 | 20260130044 | 0404 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND STRIPE ON SR-77 FROM A POINT 0.260 MILE NORTH OF THE JUNCTION OF CR-130 (IDAHO ROAD) T | 2 of 3 | $3,105,914 | +13% |
| 30 JAN 2026 | 20260130046 | 0105 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND STRIPE ON OLD US HIGHWAY 411 FROM THE JUNCTION OF BROKEN ARROW ROAD TO THE JUNCTION OF | 1 of 2 | $1,679,759 | Low, 13% under the second |
| 30 JAN 2026 | 20260130049 | 0201 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-64 FROM THE INTERSECTION OF SR-101 IN LEXINGTON TO THE JUNCTION OF SR-207 | 3 of 3 | $1,760,804 | +23% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.