ALDOT letting results, May 29, 2026
13 contracts let by Alabama DOT on May 29, 2026, $92,545,672 in low bids, a median of 3 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 13
- Low bids, total
- $92,545,672
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20260529001 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES (GRADE, DRAIN, PAVE, BRIDGE REPLACEMENT, SIGNS, SIGNALS, ITS, AND SANITARY SEWER) ON I-85 FROM A POINT NORTH OF THE TAYLOR | 0603 | 3 | Apac-Alabama, Inc. | $70,721,773 | $74,695,878 | +6.0% | ALDOT |
| 20260529023 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE INTERSECTION OF CR-97 (S | 0301 | 4 | Wiregrass Construction Company, Inc. | $6,085,172 | $6,315,968 | +4.0% | ALDOT |
| 20260529024 | SAFETY WIDENING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-79 FROM WINEWOOD ROAD TO OLD BRADFORD ROA | 0301 | 3 | Apac-Alabama, Inc. | $4,826,129 | $4,904,590 | +2.0% | ALDOT |
| 20260529018 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE JUNCTION OF GATES DRIVE TO THE JUNCTION OF MAGNOLIA LAWN ROAD IN GROVE HILL | 0804 | 2 | Apac-Alabama, Inc. | $3,124,423 | $3,385,583 | +8.0% | ALDOT |
| 20260529021 | MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL IMPROVEMENTS (INSTALL AND BLOCKOUT REPLACEMENT), AND STRIPE ON SR-3 (US-31) FROM A POINT SOUTH OF TH | 0204 | 3 | Rogers Group, Inc. | $2,869,950 | $2,936,762 | +2.0% | ALDOT |
| 20260529019 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF MAXWELLBORN ROAD TO THE JUNCTION OF MEMORIAL DRIVE IN PIEDMONT | 0402 | 3 | Alabama Grading & Excavation, LLC. | $1,314,282 | $1,390,590 | +6.0% | ALDOT |
| 20260529040 | INTERSECTION IMPROVEMENTS (MICRO-MILLING, RESURFACING, TRAFFIC SIGNAL MODIFICATIONS, AND TRAFFIC STRIPE) ON SR-53 (US-231) AT THE INTERSECTION OF CR-10 (MANCE N | 0704 | 3 | Apac-Alabama, Inc. | $860,813 | $1,025,676 | +19% | ALDOT |
| 20260529037 | RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON OLD GADSDEN HIGHWAY FROM THE JUNCTION OF SR-1 (US-431) TO THE INTERSECTION OF SHAW STREET IN ANNISTON | 0402 | 3 | Alabama Grading & Excavation, LLC. | $736,037 | $751,026 | +2.0% | ALDOT |
| 20260529007 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING, RESURFACING (MICRO-SURFACING SEAL COAT, TYPE III), AND TRAFFIC STRIPE) ON CR-12 FROM THE JUNCTION OF CR-29 TO THE | 0302 | 2 | Wiregrass Construction Company, Inc. | $694,518 | $761,711 | +10% | ALDOT |
| 20260529031 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-168 FROM THE MARSHALL COUNTY LINE (MP 15.110) TO THE JUNCTION OF SR-68 EAST OF ALBERTVILLE | 0103 | 5 | Grayson Carter & Son Contracting, Inc. | $527,580 | $559,950 | +6.0% | ALDOT |
| 20260529015 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND TRAFFIC STRIPE) ON CR-50 FROM ELLIOT'S CREEK BRIDGE (0.160 MILE EAST OF THE JUNCTION OF SANDY FORK CIRCLE) TO T | 0505 | 2 | S. T. Bunn Construction Company, Inc. | $387,730 | $460,956 | +19% | ALDOT |
| 20260529014 | GUARDRAIL INSTALLATION ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS | 0504 | 1 | Alabama Guardrail, Inc. | $219,060 | ALDOT | ||
| 20260529011 | ROADWAY/CROSSWALK IMPROVEMENTS (SIDEWALK INSTALLATION, CURB RAMPS, CONCRETE ISLANDS, AND FLASHING BEACON LIGHTS) ON WARES FERRY ROAD AT WARES FERRY ROAD ELEMENT | 0603 | 2 | McElhenney Construction Co., LLC | $178,207 | $203,734 | +14% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.