ALDOT contract 20260529015 bid tabulation

ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND TRAFFIC STRIPE) ON CR-50 FROM ELLIOT'S CREEK BRIDGE (0.160 MILE EAST OF THE JUNCTION OF SANDY FORK CIRCLE) TO THE JUNCTION OF CR-44. Let by Alabama DOT on May 29, 2026, Hale, 0505. 2 bids received; low bid $387,730 by S. T. Bunn Construction Company, Inc..

Owner
Alabama DOT
Letting
29 MAY 2026
Pay items
15
Data through
28 AUG 2026

Bidders

RankBidderTotal bidAgainst the low bid
1S. T. Bunn Construction Company, Inc.$387,730Low
2Apac-Alabama, Inc.$460,956+19%
ALDOT contract 20260529015: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. S. T. Bunn Construction Company, Inc.2. Apac-Alabama, Inc.
0010Tack coat (405A000)GAL890$4.50$11.00
0015Superpave bituminous concrete wearing surface layer, 3/8" maximum aggregate size mix, esal range A/B (424A336)TON1,605$129.50$134.44
0020Superpave bituminous concrete upper binder layer, widening, 1" maximum aggregate size mix, esal range A/B (424B647)TON905$117.94$128.40
0030Scoring bituminous pavement surface (428A001)MI4$322.79$2,163.38
0040Aggregate surfacing (1" down, crusher run) (430B043)TON220$74.25$106.22
0050Mobilization (600A000)LS1$19,600$38,345
0060Wattle (665Q002)LF100$13.54$9.73
0070Construction fuel (maximum bid limited to $ 10,000.00) (698A000)LS1$5,000.00$0.00
0080Solid white, class 2T, type A traffic stripe (701A030)MI4$2,257.30$2,573.87
0090Solid yellow, class 2T, type A traffic stripe (701A034)MI4$2,257.30$2,573.87
0100Broken yellow, class 2T, type A traffic stripe (701A044)MI1$1,692.97$1,541.08
0110Pavement markers, class A-H, type 1-B (705A032)EACH128$4.51$1.35
0120Pavement markers, class A-H, type 2-D (705A037)EACH255$4.51$1.35
0130Construction signs (740B000)SF205$10.16$10.81
0140Pilot car (740O000)EACH1$2,000.00$22,984
ALDOT contract 20260529015: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

Every contract let that day: ALDOT letting of May 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy