ALDOT contract 20260529001 bid tabulation
ROADWAY IMPROVEMENTS/ADDITIONAL LANES (GRADE, DRAIN, PAVE, BRIDGE REPLACEMENT, SIGNS, SIGNALS, ITS, AND SANITARY SEWER) ON I-85 FROM A POINT NORTH OF THE TAYLOR INTERCHANGE TO A POINT SOUTH OF JENKINS CREEK IN MONTGOMERY. Let by Alabama DOT on May 29, 2026, Montgomery, 0603. 3 bids received; low bid $70,721,773 by Apac-Alabama, Inc..
- Owner
- Alabama DOT
- Letting
- 29 MAY 2026
- Pay items
- 331
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Apac-Alabama, Inc. | $70,721,773 | Low |
| 2 | W. S. Newell & Sons, Inc. | $74,695,878 | +6.0% |
| 3 | Wiregrass Construction Company, Inc. | $76,971,274 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Apac-Alabama, Inc. | 2. W. S. Newell & Sons, Inc. | 3. Wiregrass Construction Company, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 45 acres) (201A002) | LS | 1 | $81,465 | $355,715 | $360,000 |
| 0020 | Removal of old bridge, station 364+22.690, northbound roadway (206A000) | LS | 1 | $192,186 | $189,720 | $280,860 |
| 0030 | Removal of old bridge, station 363+44.940, southbound roadway (206A001) | LS | 1 | $192,186 | $189,720 | $280,860 |
| 0040 | Removal of old bridge, station 380+25.240 northbound roadway (206A002) | LS | 1 | $390,877 | $904,899 | $467,842 |
| 0050 | Removal of old bridge, station 380+04.930 southbound roadway (206A003) | LS | 1 | $390,877 | $904,899 | $467,842 |
| 0060 | Removal of old box culvert, partial, station 223+79.000 (206B009) | LS | 1 | $9,322.54 | $29,255 | $8,685.42 |
| 0070 | Removing concrete slope paving (206C002) | SY | 2,175 | $18.28 | $11.86 | $17.03 |
| 0080 | Removing bridge end slab (206C013) | SY | 869 | $24.05 | $28.29 | $22.40 |
| 0090 | Removing concrete slope paving (under bridges) (206C016) | SY | 1,980 | $30.78 | $11.86 | $28.68 |
| 0100 | Removing riprap (206C023) | SY | 2,123 | $14.05 | $47.44 | $13.09 |
| 0110 | Removing pipe (206D000) | LF | 344 | $34.72 | $25.81 | $32.35 |
| 0120 | Removing guardrail (206D001) | LF | 7,538 | $2.31 | $8.98 | $5.38 |
| 0130 | Removing curb and gutter (206D003) | LF | 1,662 | $11.87 | $6.88 | $11.06 |
| 0140 | Removing safety barrier (206D010) | LF | 810 | $34.69 | $26.91 | $32.32 |
| 0150 | Removing fence (206D011) | LF | 89 | $17.81 | $6.73 | $5.38 |
| 0160 | Removing cable guiderail (206D033) | LF | 6,838 | $2.89 | $6.73 | $5.92 |
| 0170 | Removing headwalls (206E000) | EACH | 15 | $1,030.46 | $581.43 | $960.03 |
| 0180 | Removing inlets (206E001) | EACH | 14 | $1,329.89 | $581.43 | $1,239.00 |
| 0190 | Removing junction boxes (206E002) | EACH | 2 | $1,384.10 | $1,000.00 | $1,289.50 |
| 0200 | Removing trees (206E006) | EACH | 1 | $7,279.77 | $4,330.00 | $6,782.25 |
| 0210 | Removing guardrail end anchor (all type) (206E008) | EACH | 36 | $231.10 | $581.44 | $269.14 |
| 0220 | Removing existing overhead sign structure (206E020) | EACH | 1 | $4,971.18 | $14,799 | $16,219 |
| 0230 | Removing impact attenuators (206E041) | EACH | 2 | $1,085.87 | $1,691.10 | $6,705.19 |
| 0240 | Unclassified excavation (210A000) | CY | 76,973 | $25.29 | $38.15 | $23.57 |
| 0250 | Borrow excavation (A4 or better) (210D011) | CY | 119,854 | $23.83 | $20.81 | $22.20 |
| 0260 | Borrow excavation (loose truckbed measurement)(A2 or better) (210D020) | CY | 1,751 | $37.33 | $34.26 | $34.78 |
| 0270 | Borrow excavation (improved roadbed) (210D025) | CY | 3,940 | $37.60 | $46.01 | $35.03 |
| 0280 | Borrow excavation (sand fill, complete in place) (210D101) | CY | 4,280 | $51.46 | $54.13 | $47.94 |
| 0290 | Borrow excavation (underwater backfill) (aldot #57) (210F002) | TON | 816 | $70.81 | $73.29 | $65.97 |
| 0300 | Structure excavation (214A000) | CY | 3,172 | $31.59 | $9.78 | $29.43 |
| 0310 | Foundation backfill, commercial (214B001) | CY | 1,386 | $108.71 | $93.88 | $101.28 |
| 0320 | Unclassified bridge excavation (215A000) | CY | 832 | $128.24 | $126.71 | $120.69 |
| 0330 | Cofferdams or sheeting and shoring, station 363+63.595 (215B000) | LS | 1 | $257,392 | $254,090 | $242,223 |
| 0340 | Cofferdams or sheeting and shoring, station 380+24.777 (215B001) | LS | 1 | $340,623 | $336,253 | $320,550 |
| 0350 | Roadbed processing (230A000) | RBST | 186 | $611.18 | $1,558.37 | $569.41 |
| 0360 | Cement mortar flowable backfill, mix 4 (260A003) | CY | 49 | $830.58 | $783.24 | $773.81 |
| 0370 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 76,396 | $20.37 | $26.29 | $18.98 |
| 0380 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 10,921 | $50.36 | $63.68 | $46.92 |
| 0390 | Bituminous treatment A (401A000) | SY | 76,919 | $1.56 | $1.74 | $1.05 |
| 0400 | Tack coat (405A000) | GAL | 82,852 | $4.48 | $5.02 | $3.50 |
| 0410 | Micro-milling existing pavement (approximately 0.00" thru 1.00" thick) (408B000) | SY | 11,013 | $2.56 | $2.87 | $2.83 |
| 0420 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 9,363 | $3.64 | $4.08 | $3.96 |
| 0430 | Micro-fine milling existing pavement (approximately 1.01" thru 1.25" thick) (408C004) | SY | 86,941 | $2.11 | $2.37 | $2.38 |
| 0440 | Material remixing device (410H000) | EACH | 1 | $387,682 | $433,691 | $750,000 |
| 0450 | Smoothness testing, certified inertial profiler (410I000) | EACH | 1 | $0.01 | $11,724 | $8,500.00 |
| 0460 | Polymer modified open graded friction course (420A015) | TON | 5,320 | $164.09 | $183.52 | $218.84 |
| 0470 | Open graded friction course tack coat (420B000) | GAL | 21,278 | $8.69 | $9.71 | $5.00 |
| 0480 | Stone matrix asphalt wearing layer, 1/2" maximum aggregate size (423A003) | TON | 15,722 | $138.33 | $154.71 | $155.91 |
| 0490 | Stone matrix asphalt binder layer, 1.0" maximum aggregate size (423B001) | TON | 14,834 | $117.45 | $131.35 | $150.40 |
| 0500 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range E (424A280) | TON | 2,610 | $151.42 | $169.34 | $178.28 |
| 0510 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 4,260 | $112.77 | $126.12 | $137.57 |
| 0520 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range E (424B280) | TON | 1,303 | $127.00 | $142.03 | $127.77 |
| 0530 | Superpave bituminous concrete upper binder layer, patching, 1/2" maximum aggregate size mix, esal range E (424B283) | TON | 530 | $175.00 | $199.20 | $265.16 |
| 0540 | Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range E (424B287) | TON | 1,429 | $139.83 | $156.38 | $184.80 |
| 0550 | Superpave bituminous concrete upper binder layer, leveling, 1" maximum aggregate size mix, esal range E (424B289) | TON | 7,820 | $90.90 | $101.65 | $135.85 |
| 0560 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range E (424B581) | TON | 30,358 | $95.58 | $106.89 | $95.82 |
| 0570 | Superpave bituminous concrete lower binder layer, leveling, 1" maximum aggregate size mix, esal range E (424B589) | TON | 39,877 | $90.90 | $101.65 | $135.85 |
| 0580 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 4,926 | $94.90 | $106.12 | $120.17 |
| 0590 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 2,550 | $107.17 | $119.85 | $165.27 |
| 0600 | Superpave bituminous concrete base layer, widening, 1" maximum aggregate size mix, esal range C/D (424C370) | TON | 660 | $168.23 | $188.15 | $135.67 |
| 0610 | Scoring bituminous pavement surface (428A001) | MI | 9 | $784.21 | $877.01 | $306.82 |
| 0620 | Aggregate surfacing (aldot #57) (430B003) | TON | 29 | $87.46 | $71.18 | $81.48 |
| 0630 | Aggregate surfacing (aldot#1) (430B050) | TON | 809 | $92.65 | $97.43 | $86.32 |
| 0640 | High density mineral bond (432A000) | SY | 6,764 | $4.68 | $5.38 | $4.36 |
| 0650 | Reinforced cement concrete bridge end slab (450B000) | SY | 1,554 | $213.89 | $211.14 | $201.28 |
| 0660 | Steel reinforcement (502A000) | LB | 328,465 | $3.43 | $3.26 | $3.23 |
| 0670 | Steel reinforcement for bridge superstructure, station 363+63.595, approximately 249,800 pounds (502B000) | LS | 1 | $569,694 | $562,385 | $536,121 |
| 0680 | Steel reinforcement for bridge superstructure, station 380+24.777, approximately 130,400 pounds (502B001) | LS | 1 | $328,017 | $323,809 | $308,687 |
| 0690 | Steel test piles (HP 12X53) (505A002) | EACH | 4 | $11,592 | $11,444 | $10,909 |
| 0700 | Static loading tests (HP 12X53) (505B057) | EACH | 1 | $1,715.95 | $1,693.93 | $1,614.82 |
| 0710 | Dynamic loading tests (HP12X53)(driving) (505B333) | EACH | 4 | $5,680.47 | $5,607.60 | $5,345.71 |
| 0720 | Dynamic loading tests (HP12X53)(restrike) (505B433) | EACH | 12 | $5,508.88 | $5,438.21 | $5,184.23 |
| 0730 | Steel piling furnished and driven (HP 12X53) (505M002) | LF | 24,560 | $105.45 | $104.10 | $99.23 |
| 0740 | Structural steel (508A000) | LB | 32,990 | $6.77 | $5.95 | $6.37 |
| 0750 | Bridge substructure concrete (510A007) | CY | 1,716 | $1,258.34 | $1,242.22 | $1,184.18 |
| 0760 | Bridge concrete superstructure, station 363+63.595, approximately 956 cubic yards (510C051) | LS | 1 | $795,055 | $784,855 | $1,248,201 |
| 0770 | Bridge concrete superstructure, station 380+24.777, approximately 479 cubic yards (510C052) | LS | 1 | $1,713,334 | $1,691,354 | $1,912,365 |
| 0780 | Grooving concrete bridge decks (510E000) | SY | 5,639 | $4.53 | $4.48 | $4.26 |
| 0790 | Bridge barrier rail, type 36” single slope (510J000) | LF | 747 | $147.52 | $145.68 | $138.83 |
| 0800 | Bridge barrier rail, type 54” CSF median (510J001) | LF | 472 | $203.44 | $200.83 | $191.45 |
| 0810 | Elastomeric bearing type 2 (mark B3) (511A052) | EACH | 216 | $456.49 | $450.64 | $429.59 |
| 0820 | Pretensioned-prestressed concrete girder, type II modified (speciality item) (513B011) | LF | 7,942 | $371.96 | $367.19 | $350.04 |
| 0830 | Culvert concrete extension (cast in place) (524B011) | CY | 176 | $4,621.74 | $4,643.80 | $4,305.88 |
| 0840 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 423 | $86.66 | $59.01 | $80.74 |
| 0850 | 24" roadway pipe (class 3 R.C.) (530A002) | LF | 147 | $138.63 | $82.52 | $129.15 |
| 0860 | 30" roadway pipe (class 3 R.C.) (530A003) | LF | 9 | $420.37 | $164.16 | $391.64 |
| 0870 | 42" roadway pipe (class 3 R.C.) (530A005) | LF | 47 | $230.75 | $216.72 | $214.98 |
| 0880 | 18" roadway pipe (class 3 R.C.) (extension) (530A101) | LF | 8 | $140.07 | $171.25 | $130.50 |
| 0890 | 24" roadway pipe (class 3 R.C.) (extension) (530A102) | LF | 79 | $190.85 | $159.66 | $177.80 |
| 0900 | 30" roadway pipe (class 3 R.C.) (extension) (530A103) | LF | 166 | $209.20 | $192.36 | $194.90 |
| 0910 | 15" roadway pipe (14 gauge C.C.M.) (stack pipe)(no bedding required) (530A815) | LF | 11 | $573.99 | $413.83 | $534.76 |
| 0920 | 24" roadway pipe, jacked installation (smooth steel) (530C002) | LF | 142 | $1,067.70 | $1,039.16 | $994.73 |
| 0930 | 30" roadway pipe, jacked installation (smooth steel) (530C003) | LF | 73 | $1,186.60 | $1,186.12 | $1,105.51 |
| 0940 | Video inspection of existing roadway pipe (530F000) | LF | 1,777 | $5.13 | $6.12 | $4.76 |
| 0950 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 1,385 | $130.39 | $51.81 | $121.48 |
| 0960 | 24" storm sewer pipe (class 3 R.C.) (533A099) | LF | 478 | $182.38 | $76.06 | $169.91 |
| 0970 | Cleaning existing culvert (less than or equal to 48" horizontal opening) (534E000) | LF | 987 | $22.95 | $46.81 | $21.38 |
| 0980 | Cleaning existing pipe (less than or equal to 48" horizontal opening) (534E001) | LF | 2,004 | $11.30 | $25.74 | $10.53 |
| 0990 | 24" roadway pipe rehabilitation (538A004) | LF | 584 | $407.52 | $285.03 | $379.67 |
| 1000 | 18" span X 11" rise roadway pipe rehabilitation (538B000) | LF | 93 | $321.52 | $276.69 | $299.55 |
| 1010 | Soldier pile retaining wall, with permanent ground anchors, concrete panels, number 1 (572B090) | SF | 5,131 | $489.86 | $530.43 | $457.53 |
| 1020 | Soldier pile retaining wall, with permanent ground anchors, concrete panels, number 2 (572B091) | SF | 4,944 | $489.86 | $532.19 | $457.53 |
| 1030 | Mobilization (600A000) | LS | 1 | $6,905,200 | $8,934,364 | $9,225,000 |
| 1040 | Furnishing type 3 field office (state retained) (603C002) | EACH | 1 | $207,835 | $161,968 | $252,158 |
| 1050 | Separation geotextile (608A000) | SY | 8,137 | $4.21 | $5.50 | $3.92 |
| 1060 | Aggregate slope protection (609A000) | SY | 93 | $112.94 | $65.55 | $105.22 |
| 1070 | Loose riprap, class 1 (610C000) | TON | 31 | $123.86 | $136.36 | $115.40 |
| 1080 | Loose riprap, class 2 (610C001) | TON | 18,842 | $76.87 | $88.55 | $71.61 |
| 1090 | Filter blanket, geotextile (610D003) | SY | 23,564 | $3.12 | $5.65 | $2.97 |
| 1100 | Slope paving (614A000) | CY | 774 | $983.98 | $588.50 | $916.73 |
| 1110 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 4 | $3,397.22 | $1,177.00 | $3,165.05 |
| 1120 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 12 | $3,761.21 | $1,310.75 | $3,504.16 |
| 1130 | 30" roadway pipe end treatment, class 1 (619A004) | EACH | 2 | $4,246.53 | $1,658.50 | $3,956.32 |
| 1140 | 30" side drain pipe end treatment, class 1 (619A103) | EACH | 2 | $4,974.51 | $1,792.25 | $4,634.54 |
| 1150 | 42" side drain pipe end treatment, class 1 (619A105) | EACH | 1 | $5,702.48 | $2,059.75 | $5,312.76 |
| 1160 | Minor structure concrete (620A000) | CY | 17 | $3,486.20 | $2,675.00 | $3,247.94 |
| 1170 | Junction boxes, type 4 or 1P (621A003) | EACH | 1 | $7,765.08 | $7,222.50 | $7,234.40 |
| 1180 | Junction boxes, type 1 (621A005) | EACH | 4 | $4,974.51 | $5,617.50 | $4,634.54 |
| 1190 | Junction boxes, type 1 or 1P (621A011) | EACH | 11 | $4,974.51 | $5,617.50 | $4,634.54 |
| 1200 | Junction boxes, type 1 (modified) (621A022) | EACH | 4 | $4,974.51 | $6,955.00 | $4,634.54 |
| 1210 | Junction boxes, type partial (621A057) | EACH | 1 | $3,821.88 | $4,280.00 | $3,560.68 |
| 1220 | Junction box units, type 1 or 1P (621B011) | EACH | 3 | $1,110.16 | $1,070.00 | $1,034.29 |
| 1230 | Junction box units, type 1 (modified) (621B034) | EACH | 1 | $1,322.49 | $1,230.50 | $1,232.11 |
| 1240 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 7 | $8,432.40 | $7,757.50 | $7,856.11 |
| 1250 | Inlets, type Y (621C020) | EACH | 1 | $5,842.01 | $8,399.50 | $5,442.76 |
| 1260 | Inlets, type C or P1 (621C024) | EACH | 3 | $5,993.67 | $5,350.00 | $5,584.05 |
| 1270 | Inlets, type C (621C027) | EACH | 11 | $5,587.22 | $5,350.00 | $5,205.38 |
| 1280 | Inlets, type C (modified) (621C032) | EACH | 1 | $8,493.06 | $6,420.00 | $7,912.63 |
| 1290 | Inlets, type E3 (621C069) | EACH | 12 | $16,440 | $15,515 | $15,317 |
| 1300 | Inlets, type E4 (621C070) | EACH | 2 | $22,173 | $19,795 | $20,658 |
| 1310 | Inlet units, type C (621D002) | EACH | 1 | $1,110.16 | $1,070.00 | $1,034.29 |
| 1320 | Inlet units, type C or P1 (621D033) | EACH | 2 | $1,110.17 | $1,070.00 | $1,034.30 |
| 1330 | Inlet units, type E3 (621D046) | EACH | 21 | $1,286.09 | $2,514.50 | $1,198.20 |
| 1340 | Inlet units, type E4 (621D047) | EACH | 1 | $1,486.28 | $2,514.50 | $1,384.71 |
| 1350 | Combination curb & gutter, type C (623C000) | LF | 1,911 | $52.78 | $25.41 | $49.18 |
| 1360 | Concrete median or safety barrier, type CSF-42 (629A095) | LF | 214 | $385.52 | $383.61 | $362.80 |
| 1370 | Concrete median or safety barrier, type CSF-42 (FO) (629A097) | LF | 206 | $513.07 | $510.53 | $482.83 |
| 1380 | Concrete median or safety barrier, type CSF-54 (629A103) | LF | 6,689 | $210.49 | $209.45 | $198.08 |
| 1390 | Concrete median or safety barrier, type CSF-54 (FO) (629A105) | LF | 60 | $811.07 | $807.05 | $763.27 |
| 1400 | Concrete median or safety barrier end section (type tes) (629C002) | EACH | 2 | $6,640.71 | $6,607.82 | $6,249.36 |
| 1410 | Steel beam guardrail, class A, type 2 (630A001) | LF | 3,750 | $26.58 | $23.54 | $22.26 |
| 1420 | Steel beam guardrail, class A, type 2 (double faced median barrier) (630A018) | LF | 538 | $98.22 | $71.69 | $35.42 |
| 1430 | Steel beam guardrail, class A, type 2 (8'-0" post) (630A034) | LF | 3,100 | $28.89 | $25.15 | $23.78 |
| 1440 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 15 | $1,386.62 | $1,765.50 | $1,669.70 |
| 1450 | Guardrail end anchor, type 13 (MASH) (630C079) | EACH | 4 | $4,275.42 | $4,066.00 | $3,845.36 |
| 1460 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 15 | $3,466.56 | $4,066.00 | $3,845.36 |
| 1470 | Fence reset (includes all types) (637A001) | LF | 307 | $217.17 | $56.91 | $43.06 |
| 1480 | 10 inch P.V.C. sanitary sewer gravity pipe laid (645A550) | LF | 605 | $167.74 | $206.92 | $156.27 |
| 1490 | 10 inch abandon existing sanitary sewer (645F515) | LF | 580 | $19.12 | $49.17 | $17.82 |
| 1500 | 48 inch manhole (645H510) | EACH | 2 | $11,666 | $12,665 | $10,869 |
| 1510 | Manhole frame and cover reset (645K500) | EACH | 2 | $2,998.37 | $2,276.60 | $2,793.45 |
| 1520 | Connection to existing manhole (645M500) | EACH | 2 | $7,154.20 | $22,865 | $6,665.27 |
| 1530 | Abandon existing manhole (645N500) | EACH | 2 | $5,414.34 | $2,845.74 | $5,044.31 |
| 1540 | 24 inch steel encasement pipe, type 2 installation (649A660) | LF | 335 | $1,252.20 | $917.24 | $1,166.62 |
| 1550 | Topsoil from stockpiles (650B000) | CY | 18,254 | $18.86 | $26.24 | $17.57 |
| 1560 | Seeding (652A100) | ACRE | 25 | $1,271.07 | $1,209.18 | $1,184.20 |
| 1570 | Seeding(wetland mix) (652A110) | ACRE | 1 | $3,466.55 | $3,021.28 | $3,229.64 |
| 1580 | Mowing (652C000) | ACRE | 212 | $86.66 | $211.28 | $80.74 |
| 1590 | Solid sodding (bermuda) (654A001) | SY | 33,323 | $6.70 | $6.14 | $6.24 |
| 1600 | Mulching (656A010) | ACRE | 21 | $1,900.83 | $1,164.36 | $1,770.92 |
| 1610 | Erosion control product, type S2 (659C002) | SY | 18,954 | $3.47 | $2.58 | $3.23 |
| 1620 | Temporary seeding (665A000) | ACRE | 75 | $450.65 | $1,254.26 | $419.85 |
| 1630 | Temporary mulching (665B001) | TON | 225 | $288.88 | $514.89 | $269.14 |
| 1640 | Temporary pipe (665C010) | LF | 776 | $43.72 | $50.90 | $40.74 |
| 1650 | Temporary pipe end treatment (665D001) | EACH | 13 | $423.36 | $1,133.64 | $394.43 |
| 1660 | Hay bales (665F000) | EACH | 100 | $11.56 | $21.26 | $10.77 |
| 1670 | Sand bags (665G000) | EACH | 909 | $9.82 | $8.11 | $9.15 |
| 1680 | Flow baffle (665H005) | LF | 237 | $6.93 | $7.39 | $6.46 |
| 1690 | Silt fence (665J002) | LF | 9,679 | $4.62 | $6.58 | $4.31 |
| 1700 | Silt fence removal (665O001) | LF | 9,679 | $0.58 | $2.02 | $0.54 |
| 1710 | Inlet protection, stage 3 or 4 (665P005) | EACH | 51 | $462.21 | $447.47 | $430.62 |
| 1720 | Wattle (665Q002) | LF | 11,527 | $6.93 | $10.18 | $6.46 |
| 1730 | Temporary earth berms (665T000) | LF | 1,200 | $2.77 | $3.15 | $7.48 |
| 1740 | Basin dewatering device (665X000) | EACH | 1 | $4,343.63 | $4,554.39 | $6,738.15 |
| 1750 | Pest control treatment (666A001) | ACRE | 26 | $52.00 | $377.66 | $48.44 |
| 1760 | Flocculant application, ditch check (672C100) | EACH | 150 | $11.56 | $26.86 | $10.77 |
| 1770 | Flocculant application, sedimentation basin (672C102) | EACH | 50 | $167.55 | $274.20 | $156.10 |
| 1780 | Contractor retained tubidimeter (672D000) | EACH | 1 | $5,777.60 | $2,460.10 | $1,883.96 |
| 1790 | Geometric controls (680A001) | LS | 1 | $3,097,905 | $939,762 | $3,205,225 |
| 1800 | Construction fuel (maximum bid limited to $ 4,184,850.00) (698A000) | LS | 1 | $675,978 | $0.00 | $629,780 |
| 1810 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 7 | $4,593.19 | $4,524.73 | $4,279.28 |
| 1820 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 6 | $4,593.19 | $4,524.73 | $4,279.28 |
| 1830 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 9 | $2,016.38 | $1,986.33 | $1,878.58 |
| 1840 | Dotted, class W, type A traffic stripe(lane drop 10" wide) (701B059) | LF | 225 | $4.62 | $4.55 | $4.31 |
| 1850 | Dotted, class 2, type A traffic stripe(lane drop 10" wide) (701B063) | LF | 6,470 | $2.60 | $2.56 | $2.42 |
| 1860 | Dotted, class W, type B traffic stripe, black (lane drop 10" wide) (701B075) | LF | 225 | $4.62 | $4.55 | $4.31 |
| 1870 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 5,646 | $1.16 | $1.14 | $1.08 |
| 1880 | Dotted white with contrast black border, class W, type A traffic stripe (5" wide) (701B500) | LF | 450 | $4.04 | $3.98 | $3.77 |
| 1890 | Broken temporary traffic stripe (701C000) | MI | 25 | $808.86 | $796.81 | $753.58 |
| 1900 | Solid temporary traffic stripe (701C001) | MI | 68 | $866.64 | $853.72 | $807.41 |
| 1910 | Solid traffic stripe removed (701D005) | MI | 10 | $2,311.04 | $2,276.60 | $2,153.10 |
| 1920 | Solid traffic stripe removed (tape) (701D009) | MI | 1 | $4,333.19 | $4,268.62 | $4,037.05 |
| 1930 | Broken traffic stripe removed (701D013) | MI | 1 | $2,022.16 | $1,992.02 | $1,883.96 |
| 1940 | Broken traffic stripe removed (tape) (701D016) | MI | 1 | $2,022.16 | $1,992.02 | $1,883.96 |
| 1950 | Solid temporary traffic stripe (removable tape) (701E006) | LF | 5,043 | $3.47 | $3.41 | $3.23 |
| 1960 | Broken temporary traffic stripe (removable tape) (701E009) | LF | 1,491 | $2.31 | $2.28 | $2.15 |
| 1970 | Dotted temporary traffic stripe (701F000) | LF | 17,561 | $0.17 | $0.17 | $0.16 |
| 1980 | Dotted temporary traffic stripe (lane drop) (701F010) | LF | 28,913 | $0.17 | $0.17 | $0.16 |
| 1990 | Solid white with contrast black border, class W, type A traffic stripe (5" wide) (701G500) | LF | 754 | $8.09 | $7.97 | $7.54 |
| 2000 | Broken white with contrast black border, class W, type A traffic stripe (5" wide) (701G510) | LF | 1,356 | $4.04 | $3.98 | $3.77 |
| 2010 | Solid yellow with contrast black border, class W, type A traffic stripe (5" wide) (701G520) | LF | 754 | $8.09 | $7.97 | $7.54 |
| 2020 | Dotted traffic stripe removed (paint) (701H010) | LF | 6,496 | $0.58 | $0.57 | $0.54 |
| 2030 | Traffic control markings, class 2, type A (703A002) | SF | 23,881 | $4.62 | $4.55 | $4.31 |
| 2040 | Traffic control markings, class W, type A (703A011) | SF | 367 | $34.67 | $34.15 | $32.30 |
| 2050 | Traffic control legends, class 2, type A (703B002) | SF | 650 | $6.36 | $6.26 | $5.92 |
| 2060 | Traffic control legends, class W, type A (703B011) | SF | 19 | $46.22 | $45.53 | $43.06 |
| 2070 | Removal of existing traffic control markings or legends (paint) (703C000) | SF | 39 | $4.04 | $3.98 | $3.77 |
| 2080 | Temporary traffic control markings (703D001) | SF | 28,031 | $1.16 | $1.14 | $1.08 |
| 2090 | Temporary traffic control legends (703E001) | SF | 650 | $2.31 | $2.28 | $2.15 |
| 2100 | Pavement markers, class C, type 1- A (705A011) | EACH | 6,035 | $4.62 | $4.55 | $4.31 |
| 2110 | Pavement markers, class C, type 1- B (705A012) | EACH | 3,290 | $4.62 | $4.55 | $4.31 |
| 2120 | Pavement markers, class C, type 2- C (705A022) | EACH | 3,211 | $4.62 | $4.55 | $4.31 |
| 2130 | Pavement markers, class C, type 2- D (705A023) | EACH | 36 | $4.62 | $4.55 | $4.31 |
| 2140 | Pavement markers, class C, type 2- E (705A024) | EACH | 4,274 | $4.62 | $4.55 | $4.31 |
| 2150 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 1,493 | $4.62 | $4.55 | $4.31 |
| 2160 | Pavement markers, class A-H, type 1-A (705A031) | EACH | 721 | $4.62 | $4.55 | $4.31 |
| 2170 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 871 | $4.62 | $4.55 | $4.31 |
| 2180 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 36 | $4.62 | $4.55 | $4.31 |
| 2190 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 56 | $4.62 | $4.55 | $4.31 |
| 2200 | Flexible delineator post with base, yellow (707F001) | EACH | 14 | $98.22 | $284.57 | $269.14 |
| 2210 | Flexible delineator post with base, white (707F002) | EACH | 25 | $98.22 | $284.57 | $269.14 |
| 2220 | Milepost, type A (709A000) | EACH | 1 | $190.65 | $284.57 | $269.14 |
| 2230 | Milepost reset (709B000) | EACH | 3 | $231.10 | $284.57 | $269.14 |
| 2240 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 4 | $28.89 | $34.15 | $32.30 |
| 2250 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 7 | $23.11 | $29.60 | $27.99 |
| 2260 | Class 2A aluminum flat sign panels (type IV background) (710A181) | SF | 177 | $46.22 | $47.81 | $45.22 |
| 2270 | Class 2A aluminum multiple flat sign panels (type IV background) (710A183) | SF | 153 | $46.22 | $47.81 | $45.22 |
| 2280 | Class 6 aluminum flat sign panels (type IV or XI background) (710A186) | SF | 167 | $46.22 | $47.81 | $45.22 |
| 2290 | Class 6 aluminum multiple flat sign panels (type IV or XI background) (710A188) | SF | 1,255 | $46.22 | $47.81 | $45.22 |
| 2300 | Roadway sign post (W8 X 18 steel beam) (710B008) | LF | 48 | $242.66 | $284.57 | $269.14 |
| 2310 | Roadway sign post (W6 X 12 steel beam) (710B011) | LF | 42 | $259.99 | $256.12 | $242.22 |
| 2320 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 96 | $21.95 | $19.35 | $18.30 |
| 2330 | Removal of existing roadway signs (710C000) | LS | 1 | $4,622.08 | $22,766 | $21,531 |
| 2340 | Roadway sign relocation (711A000) | LS | 1 | $2,379.02 | $39,840 | $37,679 |
| 2350 | Overhead roadway sign structure no. ohc 1 (715A000) | LS | 1 | $95,533 | $117,245 | $160,884 |
| 2360 | Overhead roadway sign structure no. ohc 2 (715A001) | LS | 1 | $98,341 | $118,383 | $161,961 |
| 2370 | Overhead roadway sign structure no. ohbm 3 (715A002) | LS | 1 | $85,208 | $108,138 | $152,272 |
| 2380 | Overhead roadway sign structure no. ohc 4 (715A003) | LS | 1 | $98,341 | $118,383 | $161,961 |
| 2390 | Overhead roadway sign structure no. ohbm 5 (715A004) | LS | 1 | $84,216 | $111,553 | $155,501 |
| 2400 | Overhead roadway sign structure no. ohsb 6 (715A005) | LS | 1 | $187,660 | $187,819 | $237,631 |
| 2410 | Overhead roadway sign structure no. ohsb 7 (715A006) | LS | 1 | $199,225 | $195,787 | $235,156 |
| 2420 | Vehicular impact attenuator assembly (unidirectional,TL-3) (720A025) | EACH | 2 | $45,064 | $41,500 | $41,995 |
| 2430 | Portable concrete safety barriers, type 6 (726A000) | LF | 26,890 | $68.14 | $62.75 | $67.55 |
| 2440 | Portable concrete safety barriers, type 6-A (726A001) | LF | 240 | $10.86 | $10.00 | $10.77 |
| 2450 | Portable concrete safety barriers,type 6(bridge bolted) (726A005) | LF | 1,300 | $179.17 | $165.00 | $177.63 |
| 2460 | Portable impact attenuator assembly (unidirectional,TL-3) (726D025) | EACH | 24 | $13,573 | $12,500 | $13,457 |
| 2470 | Truck mounted impact attenuator unit (728A000) | EACH | 2 | $32,576 | $39,840 | $232,534 |
| 2480 | Fiber optic trunk cable, 36F (729A001) | LF | 545 | $2.67 | $9.68 | $9.15 |
| 2490 | Fiber optic trunk cable, 48F (729A002) | LF | 2,310 | $11.69 | $6.37 | $6.03 |
| 2500 | Fiber optic drop cable, 12F (729A101) | LF | 1,590 | $2.10 | $6.37 | $6.03 |
| 2510 | Fiber distribution unit, secondary (729B010) | EACH | 4 | $1,389.14 | $2,110.40 | $1,995.92 |
| 2520 | Fan-out kit (729B020) | EACH | 4 | $85.09 | $147.98 | $139.95 |
| 2530 | FO patch cable, duplex, SC-LC, 2 meter (729B211) | EACH | 4 | $59.50 | $96.76 | $91.51 |
| 2540 | Network device, type C (fmes) (729C020) | EACH | 8 | $3,878.37 | $3,035.84 | $2,871.15 |
| 2550 | Network device, cellular modem (729C200) | EACH | 10 | $7,641.20 | $5,669.86 | $5,362.29 |
| 2560 | Camera, positioner (729D102) | EACH | 4 | $6,013.20 | $5,857.68 | $5,539.92 |
| 2570 | Vehicle detection system, radar (type B) (729E111) | EACH | 3 | $17,308 | $16,236 | $15,355 |
| 2580 | Conduit, underground, non-metallic, 2 inch (729I101) | LF | 3,745 | $14.25 | $15.52 | $14.67 |
| 2590 | Conductor, 6 AWG (729I701) | LF | 1,590 | $3.54 | $4.28 | $4.05 |
| 2600 | Locate tone wire (729I800) | LF | 2,685 | $1.34 | $1.38 | $1.30 |
| 2610 | ITS cabinet, base mount, type 336S (729J014) | EACH | 4 | $12,667 | $16,086 | $15,214 |
| 2620 | Pole, concrete (50 FT agl) (729L005) | EACH | 1 | $24,223 | $22,136 | $20,936 |
| 2630 | Pole, concrete (70 FT agl) (729L007) | EACH | 1 | $27,416 | $33,993 | $32,149 |
| 2640 | Miscellaneous infrastructure, fusion splicing (729N000) | EACH | 124 | $49.11 | $63.74 | $60.29 |
| 2650 | Miscellaneous infrastructure, splice closure, underground, 12 fiber (729N111) | EACH | 2 | $1,337.84 | $1,122.36 | $1,061.48 |
| 2660 | Miscellaneous infrastructure, splice closure, underground, 36 fiber (729N113) | EACH | 1 | $1,337.85 | $1,350.02 | $1,276.79 |
| 2670 | Miscellaneous infrastructure, splice closure, underground, 48 fiber (729N114) | EACH | 2 | $1,337.84 | $1,469.54 | $1,389.83 |
| 2680 | Miscellaneous infrastructure, commbox, type F2 (729N302) | EACH | 12 | $4,683.70 | $3,239.60 | $3,063.86 |
| 2690 | Miscellaneous infrastructure, commbox, type E1 (729N311) | EACH | 2 | $1,211.87 | $1,177.00 | $1,113.15 |
| 2700 | Miscellaneous infrastructure, fiber marker post (729N500) | EACH | 14 | $97.30 | $185.54 | $175.48 |
| 2710 | Removal of existing traffic control unit ( I-85 southbound ramps at SR- 110) (730A000) | LS | 1 | $5,717.45 | $20,489 | $19,378 |
| 2720 | Removal of existing traffic control unit ( I-85 northbound ramps at SR- 110) (730A001) | LS | 1 | $384.21 | $20,489 | $19,378 |
| 2730 | Removal of existing traffic control unit (partial) ( temporary signs) (730A012) | LS | 1 | $5,740.83 | $20,489 | $19,378 |
| 2740 | Removal of existing traffic control unit (temporary) ( atlanta highway at arrowhead drive) (730A053) | LS | 1 | $4,402.87 | $20,489 | $19,378 |
| 2750 | Furnishing and installing traffic control unit ( I-85 southbound ramps at SR-110) (730C000) | LS | 1 | $15,185 | $23,904 | $22,608 |
| 2760 | Furnishing and installing traffic control unit ( I-85 northbound ramps at SR-110) (730C001) | LS | 1 | $16,942 | $23,904 | $22,608 |
| 2770 | Furnishing and installing traffic control unit (temporary)( atlanta highway at arrowhead drive) (730C030) | LS | 1 | $11,754 | $54,638 | $51,674 |
| 2780 | Furnishing and installing traffic control unit (temporary) ( temporary signs) (730C031) | LS | 1 | $17,362 | $23,904 | $22,608 |
| 2790 | Metal traffic signal pole foundation (730E000) | EACH | 8 | $6,529.42 | $13,660 | $12,919 |
| 2800 | Metal traffic signal strain pole (730G001) | EACH | 8 | $12,082 | $14,798 | $13,995 |
| 2810 | Wood traffic signal strain pole (730G005) | EACH | 4 | $3,208.98 | $3,187.23 | $3,014.34 |
| 2820 | Traffic signal junction box type S1 (730K001) | EACH | 6 | $789.17 | $853.72 | $807.41 |
| 2830 | Traffic signal junction box type S2 (730K002) | EACH | 2 | $2,367.23 | $2,845.74 | $2,691.37 |
| 2840 | 1", non-metallic, conduit (730L003) | LF | 430 | $21.34 | $13.66 | $12.92 |
| 2850 | 2", non-metallic, conduit (730L005) | LF | 280 | $7.48 | $13.66 | $12.92 |
| 2860 | Luminaire extension assembly, 12' (730N000) | EACH | 8 | $2,445.65 | $4,325.53 | $4,090.88 |
| 2870 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 24 | $1,741.10 | $1,593.62 | $1,507.17 |
| 2880 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 3 | $2,107.12 | $2,048.94 | $1,937.79 |
| 2890 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 3 | $32,053 | $39,840 | $37,679 |
| 2900 | Electrical power service assembly with wood pole (730T010) | EACH | 3 | $4,787.57 | $6,602.13 | $6,243.98 |
| 2910 | Uninterruptable power supply system, managed (730T022) | EACH | 2 | $12,368 | $18,213 | $17,225 |
| 2920 | Radar detection system ( I-85 southbound ramps at SR-110) (730U400) | LS | 1 | $41,992 | $45,532 | $43,062 |
| 2930 | Radar detection system ( I-85 northbound ramps at SR-110) (730U401) | LS | 1 | $43,551 | $45,532 | $43,062 |
| 2940 | Radar detection system ( atlanta highway at arrowhead drive) (730U402) | LS | 1 | $50,339 | $45,532 | $43,062 |
| 2950 | Pole for mounting traffic detection equipment (731B000) | EACH | 2 | $23,490 | $23,559 | $22,281 |
| 2960 | Removal of fiber optic cable ( from site #2 to ITS site #3A) (734X000) | LS | 1 | $6,358.36 | $5,008.51 | $4,736.81 |
| 2970 | Removal of fiber optic cable ( SR- 110) (734X001) | LS | 1 | $1,334.02 | $2,504.26 | $2,368.41 |
| 2980 | Removal of ITS infrastructure ( ITS site #1A) (734X010) | LS | 1 | $1,244.69 | $3,756.38 | $3,552.61 |
| 2990 | Removal of ITS infrastructure ( ITS site #2) (734X011) | LS | 1 | $1,244.69 | $3,756.38 | $3,552.61 |
| 3000 | Removal of ITS infrastructure ( ITS site #3A) (734X012) | LS | 1 | $7,615.33 | $12,749 | $12,057 |
| 3010 | Removal of ITS infrastructure ( ITS site #4) (734X013) | LS | 1 | $1,162.26 | $2,504.26 | $2,368.41 |
| 3020 | Removal of ITS infrastructure ( ITS site #5A) (734X014) | LS | 1 | $8,649.31 | $12,749 | $12,057 |
| 3030 | Removal of ITS infrastructure ( SR- 110) (734X015) | LS | 1 | $3,835.76 | $7,512.77 | $7,105.22 |
| 3040 | Construction signs (740B000) | SF | 4,302 | $7.51 | $6.94 | $6.19 |
| 3050 | Special construction signs (740C000) | SF | 92 | $8.09 | $6.94 | $8.07 |
| 3060 | Channelizing drums (740D000) | EACH | 1,600 | $52.00 | $35.29 | $65.21 |
| 3070 | Cones (36 inches high) (740E000) | EACH | 200 | $24.27 | $23.90 | $16.15 |
| 3080 | Barricades, type III (740F002) | EACH | 21 | $288.88 | $335.80 | $465.07 |
| 3090 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 4 | $4,564.30 | $11,155 | $4,144.71 |
| 3100 | Portable changeable message sign, type 3 (742A003) | EACH | 14 | $16,466 | $19,123 | $13,295 |
| 3110 | High mast luminaire assembly with three, LED, 400 watt equivalent luminaires (750A261) | EACH | 10 | $58,542 | $56,915 | $53,827 |
| 3120 | High mast luminaire assembly with four, LED, 400 watt equivalent luminaires (750A262) | EACH | 3 | $66,340 | $64,883 | $61,363 |
| 3130 | Roadway luminaire assembly with one, LED low profile underpass pendant, 150 watt luminaire (750B571) | EACH | 6 | $2,497.78 | $2,845.74 | $2,691.37 |
| 3140 | Roadway luminaire assembly with one, LED, 400 watt equivalent luminaire (750B602) | EACH | 21 | $8,355.36 | $7,398.94 | $6,997.56 |
| 3150 | Pole foundation,roadway (750C010) | EACH | 21 | $4,469.84 | $5,691.49 | $5,382.74 |
| 3160 | Pole foundation, high mast (750C011) | EACH | 13 | $18,185 | $14,798 | $13,995 |
| 3170 | Electrical junction box,type 1 (750D200) | EACH | 10 | $2,510.50 | $739.89 | $699.76 |
| 3180 | Electrical junction box, type 2 (750D201) | EACH | 2 | $2,608.04 | $1,138.30 | $1,076.55 |
| 3190 | Conduit, 3/4 inch, rigid metallic (750E123) | LF | 500 | $12.68 | $18.21 | $17.22 |
| 3200 | Conduit, 2 inch, rigid metallic (750E127) | LF | 250 | $22.76 | $23.90 | $22.61 |
| 3210 | Conductor, #10 AWG (750F022) | LF | 1,500 | $2.07 | $2.28 | $2.15 |
| 3220 | Conductor, #6 AWG (750F024) | LF | 500 | $3.79 | $11.38 | $10.77 |
| 3230 | Conductor, #2 AWG (750F026) | LF | 300 | $7.53 | $11.38 | $10.77 |
| 3240 | Combined duct and cable,2 #6 AWG/ 1 #6 AWG GND (750G010) | LF | 12,400 | $13.43 | $9.11 | $8.61 |
| 3250 | Service pole (750H005) | EACH | 2 | $3,757.02 | $3,187.23 | $3,014.34 |
| 3260 | Lighting control center (750I015) | EACH | 2 | $38,781 | $39,840 | $37,679 |
| 3270 | Remove luminaire pole foundation, concrete (751J006) | EACH | 42 | $676.80 | $1,707.45 | $1,614.82 |
| 3280 | Remove lighting control center, 6 circuit (751L002) | EACH | 1 | $644.22 | $2,845.74 | $2,691.37 |
| 3290 | Remove roadway luminaire assembly (751L025) | EACH | 42 | $1,092.49 | $569.15 | $538.27 |
| 3300 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 1,320 | $83.21 | $78.11 | $62.44 |
| 3310 | Trainee hours at 80 cents per hour (999 000) | HR | 5,600 | $0.80 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of May 29, 2026. Compiled by Mirage Metrics.