ALDOT contract 20260130001 bid tabulation
BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE GADSDEN ROAD. Let by Alabama DOT on January 30, 2026, Etowah, 0105. 6 bids received; low bid $4,881,200 by Rogers Group, Inc..
- Owner
- Alabama DOT
- Letting
- 30 JAN 2026
- Pay items
- 112
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $4,881,200 | Low |
| 2 | Carcel & G. Construction, LLC | $5,511,862 | +13% |
| 3 | Vulcan Materials Asphalt and Construction, | $5,798,401 | +19% |
| 4 | Wiregrass Construction Company, Inc. | $5,967,778 | +22% |
| 5 | Ikaros, LLC | $6,050,000 | +24% |
| 6 | Wright Brothers Construction Company, Inc. | $7,453,351 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Carcel & G. Construction, LLC | 3. Vulcan Materials Asphalt and Construction, | 4. Wiregrass Construction Company, Inc. | 5. Ikaros, LLC | 6. Wright Brothers Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 10 acres) (201A002) | LS | 1 | $80,000 | $77,400 | $80,000 | $80,000 | $80,000 | $80,000 |
| 0020 | Removal of structures, structure no. 2 (205A002) | EACH | 1 | $580.00 | $4,026.41 | $2,350.00 | $1,500.00 | $5,000.00 | $2,000.00 |
| 0030 | Removal of structures, structure no. 3 (205A003) | EACH | 1 | $580.00 | $4,026.41 | $2,350.00 | $1,500.00 | $5,000.00 | $2,000.00 |
| 0040 | Removal of old bridge, station 114+16.00 (206A000) | LS | 1 | $88,826 | $84,153 | $86,000 | $81,682 | $125,000 | $500,000 |
| 0050 | Removing pipe (206D000) | LF | 400 | $40.00 | $17.47 | $43.00 | $26.32 | $15.00 | $37.50 |
| 0060 | Removing guardrail (206D001) | LF | 900 | $5.00 | $5.25 | $5.85 | $5.42 | $6.00 | $6.00 |
| 0070 | Removing industrial fence (206D006) | LF | 373 | $5.00 | $15.76 | $18.50 | $6.95 | $5.00 | $35.40 |
| 0080 | Removing fence (206D011) | LF | 1,088 | $4.00 | $10.51 | $12.00 | $4.50 | $5.00 | $29.50 |
| 0090 | Removing headwalls (206E000) | EACH | 18 | $230.00 | $436.23 | $900.00 | $498.04 | $1,250.00 | $820.00 |
| 0100 | Removing guardrail end anchor (all type) (206E008) | EACH | 8 | $350.00 | $315.18 | $350.00 | $325.28 | $355.00 | $359.00 |
| 0110 | Mailbox reset, single (209A000) | EACH | 1 | $1,600.00 | $811.09 | $980.00 | $682.12 | $500.00 | $600.00 |
| 0120 | Unclassified excavation (210A000) | CY | 24,920 | $12.00 | $16.76 | $20.50 | $25.00 | $12.00 | $22.00 |
| 0140 | Borrow excavation (A4 or better) (210D011) | CY | 52,056 | $22.50 | $22.44 | $24.50 | $24.00 | $16.00 | $31.00 |
| 0150 | Borrow excavation (underwater embankment) (210F001) | TON | 862 | $40.00 | $48.51 | $85.00 | $60.00 | $60.00 | $63.75 |
| 0152 | Structure excavation (214A000) | CY | 480 | $8.50 | $13.93 | $37.00 | $17.78 | $20.00 | $17.40 |
| 0157 | Foundation backfill, commercial (214B001) | CY | 190 | $60.00 | $61.33 | $106.00 | $66.94 | $75.00 | $105.00 |
| 0160 | Rock buttress for landslide correction (219A000) | TON | 432 | $50.00 | $52.74 | $99.00 | $100.00 | $60.00 | $59.00 |
| 0170 | Special filter blanket, geotextile (219C003) | SY | 293 | $5.50 | $5.78 | $17.76 | $2.62 | $6.00 | $4.35 |
| 0180 | Roadbed processing (230A000) | RBST | 49 | $510.00 | $965.00 | $1,075.00 | $500.00 | $1,000.00 | $1,000.00 |
| 0190 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 18,157 | $13.50 | $14.50 | $17.50 | $14.86 | $16.50 | $17.35 |
| 0200 | Crushed aggregate, section 825, type B, for miscellaneous use (305B078) | TON | 30 | $80.00 | $60.91 | $95.00 | $86.57 | $90.00 | $58.75 |
| 0210 | Bituminous treatment A (401A000) | SY | 18,157 | $0.90 | $1.05 | $1.40 | $1.00 | $1.18 | $1.20 |
| 0220 | Tack coat (405A000) | GAL | 4,130 | $3.25 | $3.68 | $5.00 | $3.50 | $4.14 | $4.15 |
| 0230 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 989 | $7.00 | $17.86 | $15.00 | $16.65 | $20.10 | $20.10 |
| 0240 | Material remixing device (410H000) | EACH | 1 | $26,500 | $36,771 | $87,000 | $75,000 | $41,374 | $41,300 |
| 0250 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 1,330 | $100.00 | $153.39 | $135.00 | $127.67 | $172.59 | $172.00 |
| 0260 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B650) | TON | 1,542 | $80.00 | $136.58 | $115.00 | $120.00 | $153.67 | $153.00 |
| 0270 | Superpave bituminous concrete upper binder layer, leveling, 3/4" maximum aggregate size mix, esal range C/D (424B658) | TON | 300 | $100.00 | $198.56 | $145.00 | $190.00 | $223.42 | $223.00 |
| 0280 | Superpave bituminous concrete lower binder layer, 3/4" maximum aggregate size mix, esal range C/D (424B680) | TON | 3,485 | $80.00 | $125.02 | $108.00 | $115.00 | $140.67 | $140.00 |
| 0290 | Superpave bituminous concrete base layer, patching, 1" maximum aggregate size mix, esal range C/D (424C364) | TON | 50 | $250.00 | $252.14 | $260.00 | $220.00 | $283.70 | $283.00 |
| 0300 | Superpave bituminous concrete base layer, widening, 1" maximum aggregate size mix, esal range C/D (424C370) | TON | 50 | $170.00 | $220.63 | $180.00 | $220.00 | $248.24 | $248.00 |
| 0310 | Scoring bituminous pavement surface (428A001) | MI | 2 | $1,700.00 | $315.18 | $335.00 | $305.93 | $336.63 | $750.00 |
| 0320 | Aggregate surfacing (1" down, crusher run) (430B043) | TON | 502 | $40.00 | $42.50 | $65.00 | $72.40 | $55.00 | $48.70 |
| 0330 | Reinforced cement concrete bridge end slab (450B000) | SY | 229 | $240.00 | $225.88 | $229.00 | $219.25 | $375.00 | $375.00 |
| 0340 | Steel reinforcement (502A000) | LB | 9,600 | $1.20 | $1.32 | $1.35 | $1.27 | $4.00 | $1.55 |
| 0350 | Steel reinforcement for bridge superstructure, station 114+01.73, approximately 35,600 pounds (502B000) | LS | 1 | $47,500 | $52,447 | $53,150 | $50,907 | $100,000 | $60,000 |
| 0360 | Pile points (type A, 12") (505G003) | EACH | 28 | $260.00 | $246.89 | $262.00 | $239.64 | $500.00 | $246.00 |
| 0370 | Steel piling furnished and driven (HP 12X53) (505M002) | LF | 408 | $100.00 | $94.55 | $96.00 | $91.78 | $125.00 | $187.00 |
| 0380 | Structural steel (508A000) | LB | 4,170 | $4.00 | $4.20 | $4.30 | $4.08 | $7.50 | $9.80 |
| 0390 | Bridge substructure concrete (510A007) | CY | 67 | $808.00 | $893.01 | $905.00 | $866.78 | $3,500.00 | $2,100.00 |
| 0400 | Bridge concrete superstructure, station 114+01.73, approximately 136 cubic yards (510C051) | LS | 1 | $132,100 | $146,079 | $148,000 | $141,789 | $250,000 | $200,000 |
| 0410 | Grooving concrete bridge decks (510E000) | SY | 472 | $10.00 | $10.51 | $10.50 | $10.20 | $8.76 | $8.75 |
| 0420 | Bridge barrier rail, type 36” single slope (510J000) | LF | 236 | $100.00 | $110.31 | $112.00 | $107.07 | $168.50 | $97.25 |
| 0430 | Elastomeric bearing type 2 (mark B5) (511A065) | EACH | 12 | $650.00 | $709.16 | $718.00 | $688.33 | $1,300.00 | $1,200.00 |
| 0450 | Pretensioned-prestressed concrete girders, type BT-54 modified (speciality item) (513B029) | LF | 703 | $450.00 | $428.64 | $434.00 | $416.06 | $600.00 | $330.00 |
| 0460 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 303 | $80.00 | $90.25 | $75.00 | $116.56 | $100.00 | $110.00 |
| 0470 | 24" roadway pipe (class 3 R.C.) (530A002) | LF | 398 | $90.00 | $108.00 | $90.00 | $151.26 | $115.00 | $128.00 |
| 0480 | 24" roadway pipe (class 3 R.C.) (temporary) (530A662) | LF | 50 | $110.00 | $124.20 | $90.00 | $113.38 | $140.00 | $110.00 |
| 0490 | 18" side drain pipe (class 3 R.C.) (535A080) | LF | 112 | $80.00 | $94.39 | $95.00 | $114.70 | $100.00 | $92.75 |
| 0500 | Mobilization (600A000) | LS | 1 | $509,080 | $549,170 | $398,996 | $654,925 | $475,059 | $890,500 |
| 0510 | Furnishing base, soil and structure laboratories (601A000) | EACH | 1 | $49,200 | $42,000 | $42,000 | $16,000 | $30,000 | $40,000 |
| 0520 | Right of way markers (602A000) | EACH | 57 | $530.00 | $945.00 | $650.00 | $850.94 | $475.00 | $580.00 |
| 0530 | Aggregate slope protection (609A000) | SY | 210 | $30.00 | $33.00 | $55.00 | $30.59 | $40.00 | $45.90 |
| 0540 | Geotextile filter for aggregate slope protection (609B000) | SY | 210 | $3.90 | $5.50 | $14.00 | $3.57 | $6.00 | $10.80 |
| 0550 | Loose riprap, class 2 (610C001) | TON | 500 | $50.00 | $54.00 | $99.00 | $65.00 | $65.00 | $69.25 |
| 0560 | Filter blanket, geotextile (610D003) | SY | 350 | $6.50 | $5.15 | $5.50 | $4.37 | $6.50 | $5.45 |
| 0570 | Concrete driveway, 6" thick (includes wire mesh) (618B003) | SY | 53 | $110.00 | $238.00 | $200.00 | $197.41 | $150.00 | $186.00 |
| 0580 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 6 | $1,400.00 | $2,264.22 | $2,450.00 | $2,694.99 | $1,750.00 | $2,500.00 |
| 0590 | 24" roadway pipe end treatment, class 2 (619A053) | EACH | 6 | $2,400.00 | $2,454.95 | $3,600.00 | $3,182.69 | $3,300.00 | $4,300.00 |
| 0600 | 18" side drain pipe end treatment, class 1 (619A101) | EACH | 6 | $1,400.00 | $1,464.22 | $2,450.00 | $2,412.37 | $2,000.00 | $2,500.00 |
| 0610 | Steel beam guardrail, class A, type 2 (630A001) | LF | 1,600 | $20.00 | $25.00 | $23.50 | $22.77 | $24.83 | $25.20 |
| 0620 | Guardrail end anchor, type 13 (MASH) (630C079) | EACH | 4 | $3,700.00 | $3,361.92 | $3,550.00 | $3,469.63 | $3,782.73 | $3,800.00 |
| 0630 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 4 | $4,000.00 | $3,572.04 | $3,800.00 | $3,686.49 | $4,019.15 | $4,100.00 |
| 0640 | Industrial fence, 7 feet high, special mounting (634E001) | LF | 240 | $110.00 | $102.96 | $120.00 | $39.13 | $127.67 | $129.00 |
| 0650 | Barbed wire fence, 4 strands, 4 feet high (metal post) (636A004) | LF | 1,088 | $6.50 | $15.76 | $16.80 | $10.75 | $18.91 | $19.00 |
| 0660 | Fence reset (includes all types) (637A001) | LF | 373 | $8.00 | $31.52 | $34.00 | $12.34 | $31.92 | $32.20 |
| 0670 | Topsoil (650A000) | CY | 6,566 | $20.00 | $17.25 | $25.00 | $32.00 | $18.00 | $30.20 |
| 0680 | Seeding (652A100) | ACRE | 9 | $1,200.00 | $1,760.00 | $1,900.00 | $2,190.65 | $2,068.68 | $1,800.00 |
| 0690 | Mowing (652C000) | ACRE | 46 | $230.00 | $200.00 | $200.00 | $262.99 | $218.69 | $266.00 |
| 0700 | Solid sodding (654A000) | SY | 2,375 | $10.00 | $10.50 | $10.00 | $13.14 | $10.64 | $10.35 |
| 0710 | Mulching (656A010) | ACRE | 9 | $1,200.00 | $1,850.00 | $1,790.00 | $1,095.32 | $1,950.47 | $1,700.00 |
| 0720 | Erosion control product, type S3 (659C001) | SY | 25,985 | $2.50 | $2.15 | $1.75 | $1.64 | $1.93 | $2.25 |
| 0730 | Erosion control product, type S2 (659C002) | SY | 6,622 | $3.00 | $2.25 | $1.75 | $1.86 | $1.93 | $2.25 |
| 0740 | Erosion control product, type C2 (659C004) | SY | 2,375 | $3.00 | $2.40 | $1.70 | $2.19 | $1.88 | $2.95 |
| 0750 | Temporary seeding (665A000) | ACRE | 9 | $1,200.00 | $1,440.52 | $1,750.00 | $1,314.39 | $1,920.92 | $940.00 |
| 0760 | Temporary mulching (665B001) | TON | 27 | $580.00 | $900.00 | $860.00 | $0.66 | $945.68 | $830.00 |
| 0770 | Temporary pipe (665C010) | LF | 500 | $90.00 | $55.00 | $106.00 | $84.24 | $20.00 | $31.50 |
| 0780 | Temporary pipe end treatment (665D001) | EACH | 8 | $1,500.00 | $500.00 | $2,425.00 | $1,823.23 | $250.00 | $620.00 |
| 0790 | Sand bags (665G000) | EACH | 250 | $10.00 | $15.50 | $8.50 | $8.76 | $9.16 | $7.10 |
| 0800 | Silt fence (665J002) | LF | 11,150 | $4.00 | $4.75 | $2.80 | $6.57 | $3.06 | $5.00 |
| 0810 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 600 | $50.00 | $55.00 | $80.00 | $64.51 | $75.00 | $65.00 |
| 0820 | Silt fence removal (665O001) | LF | 11,150 | $2.50 | $0.95 | $1.15 | $1.10 | $1.24 | $1.50 |
| 0830 | Wattle (665Q002) | LF | 500 | $7.50 | $11.50 | $13.50 | $8.76 | $13.06 | $9.45 |
| 0840 | Temporary earth berms (665T000) | LF | 1,200 | $3.50 | $12.50 | $15.00 | $5.97 | $1.00 | $7.30 |
| 0850 | Pest control treatment (666A001) | ACRE | 9 | $290.00 | $100.00 | $11.00 | $561.00 | $11.82 | $236.00 |
| 0860 | Flocculant application, ditch check (672C100) | EACH | 8 | $60.00 | $150.00 | $55.00 | $561.00 | $20.00 | $29.00 |
| 0870 | Flocculant application, temporary slope drain (672C101) | EACH | 8 | $60.00 | $190.00 | $275.00 | $561.00 | $275.00 | $29.00 |
| 0880 | Geometric controls (680A001) | LS | 1 | $80,000 | $80,070 | $120,000 | $111,858 | $145,000 | $150,000 |
| 0890 | Construction fuel (maximum bid limited to $ 236,400.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $236,400 | $0.01 |
| 0900 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 2 | $4,900.00 | $4,412.52 | $4,915.00 | $4,508.36 | $4,964.84 | $5,000.00 |
| 0910 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,900.00 | $4,412.52 | $4,915.00 | $4,508.36 | $4,964.84 | $5,000.00 |
| 0920 | Broken yellow, class 2, type A traffic stripe (5" wide) (701A244) | MI | 1 | $2,700.00 | $2,390.12 | $2,665.00 | $2,442.03 | $2,689.29 | $2,700.00 |
| 0930 | Broken temporary traffic stripe (701C000) | MI | 1 | $1,100.00 | $998.07 | $1,110.00 | $1,019.75 | $1,123.00 | $1,100.00 |
| 0940 | Solid temporary traffic stripe (701C001) | MI | 7 | $1,100.00 | $998.07 | $1,110.00 | $1,019.75 | $1,123.00 | $1,100.00 |
| 0950 | Solid white, class W, type A traffic stripe (5" wide) (701G146) | LF | 240 | $7.00 | $6.30 | $7.00 | $6.44 | $7.09 | $7.10 |
| 0960 | Solid yellow, class W, type A traffic stripe (5" wide) (701G154) | LF | 240 | $7.00 | $6.30 | $7.00 | $6.44 | $7.09 | $7.10 |
| 0970 | Traffic control markings, class 2, type A (703A002) | SF | 384 | $10.00 | $10.51 | $11.50 | $10.73 | $11.82 | $11.75 |
| 0980 | Traffic control legends, class 2, type A (703B002) | SF | 48 | $10.00 | $10.51 | $11.50 | $10.73 | $11.82 | $11.75 |
| 0990 | Temporary traffic control markings (703D001) | SF | 384 | $2.00 | $2.10 | $2.35 | $2.15 | $2.36 | $2.35 |
| 1000 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 14 | $10.00 | $10.51 | $11.50 | $10.73 | $11.82 | $11.75 |
| 1010 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 104 | $10.00 | $10.51 | $11.50 | $10.73 | $11.82 | $11.75 |
| 1020 | Class 9, aluminum flat sign panels (type XI background, fluorescent) (710A154) | SF | 54 | $30.00 | $29.42 | $26.00 | $37.57 | $33.10 | $26.40 |
| 1030 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 23 | $20.00 | $29.42 | $24.50 | $37.57 | $33.10 | $25.20 |
| 1040 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 137 | $20.00 | $27.32 | $23.50 | $26.84 | $30.73 | $24.00 |
| 1050 | Roadway sign post (#3 "U" channel galvanized steel) (710B001) | LF | 324 | $20.00 | $21.01 | $24.50 | $17.17 | $23.64 | $25.20 |
| 1060 | Construction signs (740B000) | SF | 997 | $8.00 | $7.35 | $8.20 | $5.90 | $8.27 | $8.40 |
| 1070 | Channelizing drums (740D000) | EACH | 50 | $30.00 | $42.02 | $35.00 | $59.04 | $47.28 | $31.20 |
| 1080 | Cones (36 inches high) (740E000) | EACH | 50 | $5.50 | $25.21 | $16.00 | $26.84 | $28.37 | $22.80 |
| 1090 | Barricades, type III (740F002) | EACH | 12 | $250.00 | $210.12 | $250.00 | $348.86 | $236.42 | $252.00 |
| 1100 | Pilot car (740O000) | EACH | 1 | $4,700.00 | $9,500.00 | $4,000.00 | $6,544.35 | $7,920.10 | $7,900.00 |
| 1110 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $3,400.00 | $2,311.32 | $3,150.00 | $3,864.31 | $2,600.63 | $3,500.00 |
| 1120 | Trainee hours at 80 cents per hour (999 000) | HR | 720 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of January 30, 2026. Compiled by Mirage Metrics.