ALDOT letting results, January 30, 2026
35 contracts let by Alabama DOT on January 30, 2026, $118,937,213 in low bids, a median of 3 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 35
- Low bids, total
- $118,937,213
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20260130003 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, ITS, AND BRIDGE) ON I-65 (DUAL BRIDGES) OVER WALNUT CREEK IN CLANTON | 0504 | 3 | McInnis Construction, LLC | $22,203,640 | $22,842,389 | +3.0% | ALDOT |
| 20260130031 | MICRO-MILLING, RESURFACE (MICRO-SURFACING SEAL COAT, TYPE III AND SCRUB SEAL), GUARDRAIL, ACCESS MANAGEMENT, AND STRIPE ON SR-38 (US-280) FROM THE INTERSECTION | 0401 | 1 | Gary Ingram Grading & Paving, Inc. | $9,331,330 | ALDOT | ||
| 20260130013 | CABLE GUIDERAIL REMOVAL, MEDIAN GRADING, DRAINAGE IMPROVEMENTS, AND DOUBLE-FACED GUARDRAIL INSTALLATION ON I-65 FROM THE WALNUT CREEK BRIDGE IN CLANTON TO A POI | 0504 | 2 | Dominion Construction Company, Inc. | $7,981,651 | $9,292,029 | +16% | ALDOT |
| 20260130040 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE BEGINNING OF THE 4-LANE UNDIVIDED SECTION TO THE END OF THE 4-LANE DIVIDED SECTION | 0602 | 4 | Asphalt Contractors, Inc. | $7,244,679 | $7,820,181 | +8.0% | ALDOT |
| 20260130002 | BRIDGE DECK REHABILITATION (HYDRODEMOLITION) ON I-20/I-59 (SOUTHBOUND ROADWAY) FROM THE SUMTER COUNTY LINE TO THE CR-80 OVERPASS | 1003 | 3 | Comanche Construction of Georgia, LLC | $6,977,987 | $7,112,689 | +2.0% | ALDOT |
| 20260130025 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES AND RESURFACING ON SR-53 FROM THE JUNCTION OF CR-19 (JEFF ROAD) TO THE INTERSECTION OF CR-108 (HARVEST ROAD) IN HARVEST | 0102 | 4 | Rogers Group, Inc. | $5,265,450 | $5,464,821 | +4.0% | ALDOT |
| 20260130001 | BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE GADSDEN ROAD | 0105 | 6 | Rogers Group, Inc. | $4,881,200 | $5,511,862 | +13% | ALDOT |
| 20260130057 | SAFETY WIDEN, RESURFACE, BRIDGE GUARDRAIL RETRO, AND STRIPE ON SR-69 FROM A POINT 0.600 MILE SOUTH OF THE JUNCTION OF NORTHSIDE ROAD TO THE WALKER COUNTY LINE | 0502 | 2 | S. T. Bunn Construction Company, Inc. | $4,875,227 | $5,049,506 | +4.0% | ALDOT |
| 20260130028 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-8 (US-80) FROM THE JUNCTION OF FELDER ROAD TO THE I- 65 INTERCHANGE IN MONTGOMERY | 0603 | 3 | Asphalt Contractors, Inc. | $4,453,665 | $4,796,296 | +8.0% | ALDOT |
| 20260130056 | 0041(529) SAFETY WIDENING, RESURFACING (MICRO-SURFACING SEAL COAT, TYPE II & III), AND TRAFFIC STRIPE ON SR-41 FROM THE JUNCTION OF SR-89 TO THE JUNCTION OF SR- | 0605 | 2 | Asphalt Contractors, Inc. | $3,913,445 | $4,409,886 | +13% | ALDOT |
| 20260130052 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-102 FROM THE INTERSECTION OF SR-13 TO THE WALKER COUNTY LINE | 1001 | 1 | S. T. Bunn Construction Company, Inc. | $3,451,802 | ALDOT | ||
| 20260130036 | MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM SOUTH OF THE INTERSECTION OF SR-50 TO SOUTH OF THE JUN | 0403 | 1 | East Alabama Paving Company, Inc. | $3,152,263 | ALDOT | ||
| 20260130022 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF MILLER ROAD IN ALBERTVILLE TO THE JUNCTION OF BRAHS | 0104 | 4 | Rogers Group, Inc. | $2,967,000 | $3,652,177 | +23% | ALDOT |
| 20260130044 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND STRIPE ON SR-77 FROM A POINT 0.260 MILE NORTH OF THE JUNCTION OF CR-130 (IDAHO ROAD) TO THE TALLADEGA COUN | 0404 | 3 | Gary Ingram Grading & Paving, Inc. | $2,756,319 | $3,105,914 | +13% | ALDOT |
| 20260130037 | MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE LAKE TUSCALOOSA BRIDGE TO A POINT SOUTH OF THE INT | 0502 | 2 | S. T. Bunn Construction Company, Inc. | $2,727,854 | $2,756,659 | +1.0% | ALDOT |
| 20260130030 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF CR-135 (MCINTOSH RO | 0405 | 2 | Apac-Alabama, Inc. | $2,214,477 | $2,245,355 | +1.0% | ALDOT |
| 20260130058 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALL, AND STRIPE ON SR-195 FROM A POINT 0.720 MILE SOUTH OF THE JUNCTION OF MARIGOLD ROAD TO THE WINSTON COUNTY LINE | 1008 | 1 | Wiregrass Construction Company, Inc. | $2,157,147 | ALDOT | ||
| 20260130048 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-10 FROM A POINT 0.400 MILE WEST OF THE JUNCTION OF TIMBERLANE ROAD TO THE JUNCTION OF IDA AVENUE | 0802 | 2 | Apac-Alabama, Inc. | $2,148,289 | $2,182,727 | +2.0% | ALDOT |
| 20260130067 | ACCESS MANAGEMENT AND INTERCHANGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND ITS) ON SR- 79 (TALLAPOOSA STREET) AT THE I-20/I-59 INTERCHAGE | 0301 | 3 | McElhenney Construction Co., LLC | $2,137,727 | $2,189,679 | +2.0% | ALDOT |
| 20260130029 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 FROM SR-103 TO HEALTH SCIENCES BOULEVARD AND FROM JESTER STREET TO SOUTH BROAD STREET | 0701 | 3 | Lewis Incorporated.. | $1,765,087 | $2,083,813 | +18% | ALDOT |
| 20260130046 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND STRIPE ON OLD US HIGHWAY 411 FROM THE JUNCTION OF BROKEN ARROW ROAD TO THE JUNCTION OF CR-20 | 0105 | 2 | Vulcan Materials Asphalt and Construction, | $1,679,759 | $1,901,480 | +13% | ALDOT |
| 20260130061 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-77 FROM THE JUNCTION OF CR-41 TO THE JUNCTION OF CR- 22 SOUTHEAST OF DOUBLE SPRINGS | 1001 | 2 | Wiregrass Construction Company, Inc. | $1,480,589 | $1,499,999 | +1.0% | ALDOT |
| 20260130049 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-64 FROM THE INTERSECTION OF SR-101 IN LEXINGTON TO THE JUNCTION OF SR-207 | 0201 | 3 | Asphalt Paving Systems Inc | $1,430,590 | $1,667,527 | +17% | ALDOT |
| 20260130023 | PLANING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) FROM A POINT 0.470 MILE EAST OF CANE CREEK (MP 16.240) TO THE JUNCTION OF OLD LEE HIGHWA | 0201 | 3 | Rogers Group, Inc. | $1,423,000 | $1,534,378 | +8.0% | ALDOT |
| 20260130053 | SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-123 FROM THE JUNCTION OF SR-167 TO THE JUNCTION OF NICOLE LANE | 0704 | 3 | Southeast Construction Company, LLC | $1,397,386 | $1,584,406 | +13% | ALDOT |
| 20260130043 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-27 FROM THE INTERSECTION OF SR-192 TO THE INTERSECTION OF SR-12 (SR- 84) IN ENTERPRISE | 0702 | 3 | Southeast Construction Company, LLC | $1,264,999 | $1,393,055 | +10% | ALDOT |
| 20260130054 | RESURFACING, TRAFFIC SIGNAL BACKPLATE UPGRADES, AND STRIPE ON SR-287 FROM THE INTERSECTION OF EAST 3RD STREET TO THE JUNCTION OF SR-59 IN BAY MINETTE | 0902 | 2 | Wiregrass Construction Company, Inc. | $1,240,577 | $1,385,577 | +12% | ALDOT |
| 20260130051 | SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-87 FROM THE JUNCTION OF SR-203 (US-84) IN ELBA TO A POINT SOUTH OF THE PEA CREEK BRIDGE | 0702 | 3 | Wiregrass Construction Company, Inc. | $1,200,263 | $1,250,142 | +4.0% | ALDOT |
| 20260130026 | MICRO-MILL, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-67 FROM A POINT 0.380 MILE SOUTH OF THE JUNCTION OF PINES ROAD TO THE INTERSECTION OF SR-36 | 0204 | 3 | Grayson Carter & Son Contracting, Inc. | $999,660 | $1,054,000 | +5.0% | ALDOT |
| 20260130035 | SAFETY WIDENING, PLANNING, RESURFACING, AND TRAFFIC STRIPE ON THE SR-193 SERVICE ROADS FROM RABBIT CREEK TO THE I- 10 INTERCHANGE NORTHEAST OF THEODORE | 0901 | 2 | Apac-Alabama, Inc. | $959,091 | $1,097,977 | +14% | ALDOT |
| 20260130033 | SAFETY WIDENING, MICRO-MILLING, RESURFACE, AND STRIPE ON SR-2 (US-72) FROM THE I-565 INTERCHANGE (MP 100.284) TO THE INTERSECTION OF MOORES MILL ROAD (MP 102.51 | 0102 | 4 | Rogers Group, Inc. | $942,750 | $1,077,348 | +14% | ALDOT |
| 20260130064 | RESURFACING, SIDEWALK IMPROVEMENTS, AND TRAFFIC STRIPE ON WALNUT STREET FROM SOUTH 8TH STREET TO SOUTH 5TH STREET IN GADSDEN. | 0105 | 7 | Alabama Grading & Excavation, LLC. | $852,496 | $1,196,103 | +40% | ALDOT |
| 20260130045 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-196 FROM THE JUNCTION OF SR-52 TO THE JUNCTION OF SR-27 IN GENEVA | 0702 | 3 | Southeast Construction Company, LLC | $768,987 | $1,012,609 | +32% | ALDOT |
| 20260130019 | GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATION ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE EAST CENTRAL REGION (BIRMINGHAM AREA) AS INDICATED IN THE PLANS | 0301 | 2 | C & H Construction Services, LLC | $434,784 | $436,932 | 0.0% | ALDOT |
| 20260130010 | TRAFFIC SIGNAL UPGRADES (TRAFFIC SIGNAL BACKPLATE INSTALL) ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE SOUTHWEST REGION (GROVE HILL AREA) AS INDICATED IN THE | 08, 0802, | 2 | Inline, LLC | $256,045 | $270,975 | +6.0% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.