Southeast Construction Company, LLC: ALDOT bid record
Southeast Construction Company, LLC submitted 20 bids on Alabama DOT contracts in the data, from 26 JAN 2024 to 27 MAR 2026, and was the low bidder on 4 of them (20%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $4,458,662
- Latest bid
- 27 MAR 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 9 | 0 | 0% |
| 2025 | 5 | 0 | 0% |
| 2026 | 6 | 4 | 67% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0702 | 10 | 2 | 20% |
| 0704 | 8 | 2 | 25% |
| 0703 | 1 | 0 | 0% |
| 0602 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Cones (36 inches high) | 740E000 | EACH | 18 | 9 (50%) | $20.39 | $20.47 |
| Tack coat | 405A000 | GAL | 20 | 8 (40%) | $4.94 | $4.55 |
| Aggregate surfacing (1" down, crusher run) | 430B043 | TON | 9 | 7 (78%) | $100.00 | $70.00 |
| Topsoil | 650A000 | CY | 10 | 6 (60%) | $16.00 | $45.00 |
| Borrow excavation (loose truckbed measurement)(A4 or better) | 210D021 | CY | 9 | 6 (67%) | $17.00 | $40.00 |
| Superpave bituminous concrete wearing surface layer, widening, 3/4" maximum aggregate size mix, esal range A/B | 424A350 | TON | 6 | 6 (100%) | $150.00 | $218.10 |
| Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D | 424B655 | TON | 9 | 5 (56%) | $150.00 | $175.00 |
| Pilot car | 740O000 | EACH | 15 | 4 (27%) | $1,500.00 | $8,427.51 |
| Special construction signs | 740C000 | SF | 12 | 4 (33%) | $7.79 | $8.08 |
| Machine grading shoulders | 212A000 | STA | 12 | 4 (33%) | $55.00 | $65.00 |
| Planing existing pavement (approximately 1.10" thru 2.0" thick) | 408A052 | SY | 10 | 4 (40%) | $1.81 | $2.88 |
| Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range A/B | 424B640 | TON | 8 | 4 (50%) | $187.50 | $170.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 20 | 15 of 20 |
| Apac-Alabama, Inc. | 18 | 6 of 18 |
| McElhenney Construction Co., LLC | 1 | 0 of 1 |
| PL Russell LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 MAR 2026 | 20260327034 | 0704 | SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-52 FROM A POINT 0.340 MILE WEST OF THE JUNCTION OF HARVEST TIME ROAD TO THE | 1 of 3 | $1,027,290 | Low, 2.0% under the second |
| 27 MAR 2026 | 20260327038 | 0704 | SAFETY WIDENING, MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-123 FROM A POINT NORTH OF THE CHOCTAWHATCHEE R | 2 of 3 | $2,555,563 | +16% |
| 30 JAN 2026 | 20260130043 | 0702 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-27 FROM THE INTERSECTION OF SR-192 TO THE INTERSECTION OF SR-12 (SR- 84) IN ENTERPRISE | 1 of 3 | $1,264,999 | Low, 10% under the second |
| 30 JAN 2026 | 20260130045 | 0702 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-196 FROM THE JUNCTION OF SR-52 TO THE JUNCTION OF SR-27 IN GENEVA | 1 of 3 | $768,987 | Low, 32% under the second |
| 30 JAN 2026 | 20260130051 | 0702 | SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-87 FROM THE JUNCTION OF SR-203 (US-84) IN ELBA TO A POINT SOUTH OF THE PEA C | 3 of 3 | $1,372,017 | +14% |
| 30 JAN 2026 | 20260130053 | 0704 | SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-123 FROM THE JUNCTION OF SR-167 TO THE JUNCTION OF NICOLE LANE | 1 of 3 | $1,397,386 | Low, 13% under the second |
| 05 DEC 2025 | 20251205015 | 0702 | ROADWAY/INTERSECTION SAFETY IMPROVEMENTS ON SR-12- (US-84) AT SR-141 SOUTHWEST OF ELBA | 2 of 4 | $1,351,460 | +14% |
| 07 NOV 2025 | 20251107050 | 0704 | RESURFACE (MICRO-SURFACE SEAL COAT AND SCRUB SEAL), & STRIPE ON SR-103 FROM THE FLORIDA STATE LINE TO INTERSECTION OF SR-52 IN SLOCOMB | 3 of 3 | $1,729,899 | +5.0% |
| 25 APR 2025 | 20250425042 | 0704 | RESURFACING AND TRAFFIC STRIPE ON CR-68 FROM THE INTERSECTION OF CR-49 TO THE HOUSTON COUNTY LINE | 2 of 3 | $559,497 | +1.0% |
| 31 JAN 2025 | 20250131027 | 0704 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-53 (US-231) FROM THE HOUSTON COUNTY LINE TO THE INTERSECTION OF CR-63 NORTHWE | 3 of 3 | $3,162,352 | +20% |
| 31 JAN 2025 | 20250131054 | 0702 | RESURFACING AND TRAFFIC STRIPE ON CR-514 FROM SR-87 TO SR-12 (US-84) (SITE 1) AND ON CR-515 FROM CR-514 TO SR-302 (SITE 2) | 2 of 3 | $1,039,483 | +15% |
| 06 DEC 2024 | 20241206029 | 0602 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM A POINT 0.25 MILE WEST OF LAWRENCE DRIVE TO THE JUNCTION OF SR-192 | 2 of 3 | $2,513,018 | +3.0% |
| 06 DEC 2024 | 20241206045 | 0702 | RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-87 FROM PEA CREEK NORTH OF ELBA TO THE PIKE COUNTY LINE | 3 of 3 | $4,035,874 | +16% |
| 06 DEC 2024 | 20241206048 | 0702 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-167 FROM THE GENEVA COUNTY LINE TO THE JUNCTION OF SR-192 IN ENTERPRISE | 2 of 3 | $3,655,413 | +3.0% |
| 06 DEC 2024 | 20241206057 | 0704 | SAFETY WIDENING, MICRO-MILL, RESURFACING, AND TRAFFIC STRIPE ON SR-123 FROM THE INTERSECTION OF ROY PARKER ROAD IN OZARK TO THE JUNCTION SR- | 3 of 3 | $4,026,118 | +8.0% |
| 27 SEP 2024 | 20240927010 | 0702 | INTERSECTION IMPROVEMENTS (ROUNDABOUT INSTALLATION) ON SR-52 AT SR-153 AND CR-5 WEST OF SAMSON | 2 of 3 | $3,149,972 | +6.0% |
| 31 MAY 2024 | 20240531023 | 0703 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-15 (US-29) FROM JUNCTION OF SR-12 (US-84) TO A POINT NORTH OF THE JUNCTION OF MAX BARTON ROAD | 2 of 2 | $1,187,576 | +20% |
| 29 MAR 2024 | 20240329032 | 0704 | MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, AND STRIPE ON SR-27 FROM 0.320 MILE WEST OF THE OZARK CITY LIMITS TO THE HENRY COUNTY LINE | 2 of 3 | $4,923,136 | +12% |
| 23 FEB 2024 | 20240223026 | 0702 | SAFETY WIDENING, RESURFACING, AND TRAFFIC STRIPE ON SR-27 FROM THE COFFEE COUNTY LINE TO A POINT NEAR MP 22.774 (4- LANE SECTION) SOUTHWEST | 2 of 3 | $1,646,005 | +20% |
| 26 JAN 2024 | 20240126038 | 0702 | SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND STRIPE ON SR-52 FROM THE INTERSECTION OF LINE STREET IN SAMSON TO THE JUNCTION OF SR-196 IN | 2 of 3 | $3,347,128 | +21% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.