Southeast Construction Company, LLC: ALDOT bid record

Southeast Construction Company, LLC submitted 20 bids on Alabama DOT contracts in the data, from 26 JAN 2024 to 27 MAR 2026, and was the low bidder on 4 of them (20%). When it was not low, its total sat a median +14% above the low bid.

Owner
Alabama DOT
Low bid volume
$4,458,662
Latest bid
27 MAR 2026
Data through
28 AUG 2026
20Bids
4Low bids
20Win rate, percent
+14%Median gap to the low bid when not low, 16 bids

By year

YearBidsLow bidsWin rate
2024900%
2025500%
20266467%
Southeast Construction Company, LLC, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
070210220%
07048225%
0703100%
0602100%
Southeast Construction Company, LLC, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Cones (36 inches high)740E000EACH189 (50%)$20.39$20.47
Tack coat405A000GAL208 (40%)$4.94$4.55
Aggregate surfacing (1" down, crusher run)430B043TON97 (78%)$100.00$70.00
Topsoil650A000CY106 (60%)$16.00$45.00
Borrow excavation (loose truckbed measurement)(A4 or better)210D021CY96 (67%)$17.00$40.00
Superpave bituminous concrete wearing surface layer, widening, 3/4" maximum aggregate size mix, esal range A/B424A350TON66 (100%)$150.00$218.10
Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D424B655TON95 (56%)$150.00$175.00
Pilot car740O000EACH154 (27%)$1,500.00$8,427.51
Special construction signs740C000SF124 (33%)$7.79$8.08
Machine grading shoulders212A000STA124 (33%)$55.00$65.00
Planing existing pavement (approximately 1.10" thru 2.0" thick)408A052SY104 (40%)$1.81$2.88
Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range A/B424B640TON84 (50%)$187.50$170.00
Southeast Construction Company, LLC, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Wiregrass Construction Company, Inc.2015 of 20
Apac-Alabama, Inc.186 of 18
McElhenney Construction Co., LLC10 of 1
PL Russell LLC10 of 1
Southeast Construction Company, LLC, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
27 MAR 2026202603270340704SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-52 FROM A POINT 0.340 MILE WEST OF THE JUNCTION OF HARVEST TIME ROAD TO THE 1 of 3$1,027,290Low, 2.0% under the second
27 MAR 2026202603270380704SAFETY WIDENING, MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-123 FROM A POINT NORTH OF THE CHOCTAWHATCHEE R2 of 3$2,555,563+16%
30 JAN 2026202601300430702PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-27 FROM THE INTERSECTION OF SR-192 TO THE INTERSECTION OF SR-12 (SR- 84) IN ENTERPRISE1 of 3$1,264,999Low, 10% under the second
30 JAN 2026202601300450702PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-196 FROM THE JUNCTION OF SR-52 TO THE JUNCTION OF SR-27 IN GENEVA1 of 3$768,987Low, 32% under the second
30 JAN 2026202601300510702SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-87 FROM THE JUNCTION OF SR-203 (US-84) IN ELBA TO A POINT SOUTH OF THE PEA C3 of 3$1,372,017+14%
30 JAN 2026202601300530704SAFETY WIDENING, PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-123 FROM THE JUNCTION OF SR-167 TO THE JUNCTION OF NICOLE LANE1 of 3$1,397,386Low, 13% under the second
05 DEC 2025202512050150702ROADWAY/INTERSECTION SAFETY IMPROVEMENTS ON SR-12- (US-84) AT SR-141 SOUTHWEST OF ELBA2 of 4$1,351,460+14%
07 NOV 2025202511070500704RESURFACE (MICRO-SURFACE SEAL COAT AND SCRUB SEAL), & STRIPE ON SR-103 FROM THE FLORIDA STATE LINE TO INTERSECTION OF SR-52 IN SLOCOMB3 of 3$1,729,899+5.0%
25 APR 2025202504250420704RESURFACING AND TRAFFIC STRIPE ON CR-68 FROM THE INTERSECTION OF CR-49 TO THE HOUSTON COUNTY LINE2 of 3$559,497+1.0%
31 JAN 2025202501310270704PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-53 (US-231) FROM THE HOUSTON COUNTY LINE TO THE INTERSECTION OF CR-63 NORTHWE3 of 3$3,162,352+20%
31 JAN 2025202501310540702RESURFACING AND TRAFFIC STRIPE ON CR-514 FROM SR-87 TO SR-12 (US-84) (SITE 1) AND ON CR-515 FROM CR-514 TO SR-302 (SITE 2)2 of 3$1,039,483+15%
06 DEC 2024202412060290602PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM A POINT 0.25 MILE WEST OF LAWRENCE DRIVE TO THE JUNCTION OF SR-1922 of 3$2,513,018+3.0%
06 DEC 2024202412060450702RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-87 FROM PEA CREEK NORTH OF ELBA TO THE PIKE COUNTY LINE3 of 3$4,035,874+16%
06 DEC 2024202412060480702PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-167 FROM THE GENEVA COUNTY LINE TO THE JUNCTION OF SR-192 IN ENTERPRISE2 of 3$3,655,413+3.0%
06 DEC 2024202412060570704SAFETY WIDENING, MICRO-MILL, RESURFACING, AND TRAFFIC STRIPE ON SR-123 FROM THE INTERSECTION OF ROY PARKER ROAD IN OZARK TO THE JUNCTION SR-3 of 3$4,026,118+8.0%
27 SEP 2024202409270100702INTERSECTION IMPROVEMENTS (ROUNDABOUT INSTALLATION) ON SR-52 AT SR-153 AND CR-5 WEST OF SAMSON2 of 3$3,149,972+6.0%
31 MAY 2024202405310230703PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-15 (US-29) FROM JUNCTION OF SR-12 (US-84) TO A POINT NORTH OF THE JUNCTION OF MAX BARTON ROAD2 of 2$1,187,576+20%
29 MAR 2024202403290320704MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, AND STRIPE ON SR-27 FROM 0.320 MILE WEST OF THE OZARK CITY LIMITS TO THE HENRY COUNTY LINE2 of 3$4,923,136+12%
23 FEB 2024202402230260702SAFETY WIDENING, RESURFACING, AND TRAFFIC STRIPE ON SR-27 FROM THE COFFEE COUNTY LINE TO A POINT NEAR MP 22.774 (4- LANE SECTION) SOUTHWEST 2 of 3$1,646,005+20%
26 JAN 2024202401260380702SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND STRIPE ON SR-52 FROM THE INTERSECTION OF LINE STREET IN SAMSON TO THE JUNCTION OF SR-196 IN2 of 3$3,347,128+21%
Southeast Construction Company, LLC: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy