ALDOT letting results, February 27, 2026
23 contracts let by Alabama DOT on February 27, 2026, $46,016,851 in low bids, a median of 2 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 23
- Low bids, total
- $46,016,851
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20260227022 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE INTERSECTION OF FREEMAN ROAD TO A POINT 0.420 MILE SOUTH OF THE SR-1 | 0606 | 1 | East Alabama Paving Company, Inc. | $5,109,122 | ALDOT | ||
| 20260227025 | SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-13 (US- 43) FROM A POINT 1.860 MILES NORTH OF THE JUN | 0506 | 1 | S. T. Bunn Construction Company, Inc. | $5,059,255 | ALDOT | ||
| 20260227039 | SAFETY WIDENING, RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND TRAFFIC STRIPE ON SR-130 FROM THE JUNCTION OF SR-15 (US-29) EAST OF BANKS TO THE OF JUNCTION SR-51 | 0705 | 2 | Wiregrass Construction Company, Inc. | $4,028,712 | $4,194,321 | +4.0% | ALDOT |
| 20260227033 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-74 FROM SR-21 TO CEDARTOWN HWY (SITE 1) AND ON SR-9 FROM SOUTH OF ROUNDTREE DR TO THE CHEROKEE | 0402 | 2 | Vulcan Materials Asphalt and Construction, | $3,350,562 | $4,099,939 | +22% | ALDOT |
| 20260227001 | STREETSCAPE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, SIDEWALK INSTALLATION, TRAFFIC SIGNAL UPGRADES, AND LANDSCAPING) ON 41ST FROM THE INTERSECTION OF 1ST AVE | 0301 | 5 | Gillespie Construction, LLC | $3,289,372 | $3,771,062 | +15% | ALDOT |
| 20260227021 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-24 FROM THE INTERSECTION OF CR-83 EAST OF RUSSELLVILLE TO THE LAWRENCE COUNTY LINE | 0202 | 2 | Rogers Group, Inc. | $2,937,211 | $3,086,182 | +5.0% | ALDOT |
| 20260227020 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-21 (US-231) FROM A POINT 0.280 MILE SOUTH OF THE JUNCTION OF JONES ROAD TO THE COOSA COUNTY LINE | 0601 | 3 | Wiregrass Construction Company, Inc. | $2,684,917 | $2,800,350 | +4.0% | ALDOT |
| 20260227024 | PLANING, RESURFACING, TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENT), AND TRAFFIC STRIPE ON SR-17 (US-45) FROM THE JUNCTION OF JAINE AVENUE TO A POINT 0.250 MI | 0901 | 2 | Wiregrass Construction Company, Inc. | $2,356,258 | $2,988,354 | +27% | ALDOT |
| 20260227038 | PLANING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENT), AND STRIPE ON SR-25 FROM THE INTERSECTION OF MAIN ST | 0504 | 3 | Dunn Construction Company, Inc. | $1,980,602 | $2,119,957 | +7.0% | ALDOT |
| 20260227034 | MICRO-MILLING, RESURFACING, CENTERLINE SCORING, AND TRAFFIC STRIPE ON SR-10 FROM THE INTERSECTION OF SR-13 (US-43) IN DIXON MILLS TO THE INTERSECTION OF SR-25 | 0802 | 2 | Wiregrass Construction Company, Inc. | $1,897,827 | $2,205,091 | +16% | ALDOT |
| 20260227017 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-12 (US-84) FROM THE JUNCTION OF SR-167 IN ENTERPRISE TO THE DALE COUNTY LINE | 0702 | 2 | Wiregrass Construction Company, Inc. | $1,695,129 | $1,950,037 | +15% | ALDOT |
| 20260227036 | PLANING, RESURFACING, GUARDRAIL INSTALLATION (STEEL BLOCKOUT REPLACEMENT), AND TRAFFIC STRIPE ON SR-16 (US-90) FROM THE JUNCTION OF ST. BASIL STREET TO THE INTE | 0902 | 2 | Wiregrass Construction Company, Inc. | $1,577,500 | $1,894,799 | +20% | ALDOT |
| 20260227029 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-41 FROM THE FLORIDA STATE LINE TO THE JUNCTION OF SR-15 (US-29) IN EAST BREWTON | 0903 | 2 | Wiregrass Construction Company, Inc. | $1,509,217 | $1,935,639 | +28% | ALDOT |
| 20260227031 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-295 FROM THE JUNCTION OF CR-18 (LOVE ROAD) TO THE JUNCTION OF SR-13 (US-43) IN GROVE HILL | 0804 | 2 | Apac-Alabama, Inc. | $1,466,192 | $2,075,000 | +42% | ALDOT |
| 20260227030 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-75 FROM THE JUNCTION OF GARY ROAD TO THE INTERSECTION OF CR-1982 IN DEKALB COUNTY | 0104 | 4 | Grayson Carter & Son Contracting, Inc. | $1,346,495 | $1,449,650 | +8.0% | ALDOT |
| 20260227049 | PAVEMENT PRESERVATION TO ROADWAY APPROACHES ON CR-13, CR-55, CR-74, CR-68, AND CR-63 AT VARIOUS SITES AS INDICATED IN THE PLANS | 1009 | 1 | S. T. Bunn Construction Company, Inc. | $1,335,891 | ALDOT | ||
| 20260227004 | INTERSTATE LIGHTING INSTALLATION AND UPGRADES ON I-20 AT THE CR-207 (EXIT 165) INTERCHANGE EAST OF RIVERSIDE | 0405 | 4 | Temple J Electric, LLC | $1,171,084 | $1,484,402 | +27% | ALDOT |
| 20260227010 | ROADWAY SAFETY IMPROVEMENTS (TRAFFIC SIGN REPLACEMENT) ON I-59 FROM THE SR-77 INTERCHANGE (EXIT 181) TO THE GEORGIA STATE LINE | 0103, 0105 | 1 | Superior Traffic Control, LLC | $745,754 | ALDOT | ||
| 20260227007 | ROADWAY AND SAFETY IMPROVEMENTS (PEDESTRIAN AND BICYCLE UPGRADES/TRAFFIC SIGNALS AND TRAFFIC STRIPE) ON SR-182 FROM MP 13.750 IN GULF SHORES TO THE FLORIDA STAT | 0902 | 2 | PL Russell LLC | $623,215 | $727,242 | +17% | ALDOT |
| 20260227045 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON CR-114 FROM A POINT 0.330 MILE NORTHEAST OF THE JUNCTION OF CR- 145 TO THE JUNCTION OF CR-147 | 0702 | 2 | Wiregrass Construction Company, Inc. | $581,686 | $605,021 | +4.0% | ALDOT |
| 20260227028 | ROADWAY SAFETY IMPROVEMENTS (DRAINAGE IMPROVEMENTS) ON SR-12 (US-84) AT THE JUNCTION OF CR-502 EAST OF ELBA | 0702 | 5 | S. A. Graham Company, Inc. | $579,353 | $663,443 | +15% | ALDOT |
| 20260227042 | PLANING, RESURFACING, AND TRAFIC STRIPE ON CR-22 (TROTMAN ROAD) FROM THE JUNCTION OF CR-39 (WOODLEY ROAD) TO THE JUNCTION OF SR-6 (US-82/US-231) | 0603 | 3 | Apac-Alabama, Inc. | $509,326 | $529,575 | +4.0% | ALDOT |
| 20260227014 | GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATIONS ON CR-121 OVER LITTLE CHOCTAWHATCHEE RIVER; ON CR-445 OVER COWPEN CK; ON CR-13 OVER JUDY CK; AND ON CR-19 OVER | 0704 | 3 | H & L Construction, Inc. | $182,172 | $183,574 | +1.0% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.