STREETSCAPE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, SIDEWALK INSTALLATION, TRAFFIC SIGNAL UPGRADES, AND LANDSCAPING) ON 41ST FROM THE INTERSECTION OF 1ST AVENUE SOUTH TO THE INTERSECTION OF 5TH AVENUE SOUTH IN BIRMINGHAM. Let by Alabama DOT on February 27, 2026, Jefferson, 0301. 5 bids received; low bid $3,289,372 by Gillespie Construction, LLC.
- Owner
- Alabama DOT
- Letting
- 27 FEB 2026
- Pay items
- 137
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gillespie Construction, LLC | $3,289,372 | Low |
| 2 | Bulls Construction Group, LLC | $3,771,062 | +15% |
| 3 | Southeastern Sealcoating, Inc. | $4,346,599 | +32% |
| 4 | Taylor & Miree Construction, Inc | $4,494,119 | +37% |
| 5 | CB&A Construction, LLC. | $4,862,859 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gillespie Construction, LLC | 2. Bulls Construction Group, LLC | 3. Southeastern Sealcoating, Inc. | 4. Taylor & Miree Construction, Inc | 5. CB&A Construction, LLC. |
|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 0020 | Removing concrete sidewalk (206C000) | SY | 2,243 | $20.00 | $15.00 | $34.50 | $25.00 | $38.79 |
| 0030 | Removing concrete pavement (206C001) | SY | 1,324 | $22.00 | $15.00 | $39.25 | $30.00 | $45.79 |
| 0040 | Removing concrete slope paving (206C002) | SY | 112 | $25.00 | $30.00 | $46.50 | $40.00 | $59.05 |
| 0050 | Removing concrete driveway (206C010) | SY | 1,276 | $22.00 | $15.00 | $24.75 | $30.00 | $40.65 |
| 0060 | Removing pipe (206D000) | LF | 588 | $50.00 | $15.00 | $62.25 | $55.00 | $79.59 |
| 0070 | Removing curb (206D002) | LF | 45 | $18.00 | $30.00 | $29.75 | $25.00 | $114.77 |
| 0080 | Removing curb and gutter (206D003) | LF | 2,175 | $18.00 | $15.00 | $35.75 | $20.00 | $26.61 |
| 0090 | Removing inlets (206E001) | EACH | 29 | $750.00 | $800.00 | $2,567.00 | $750.00 | $1,794.26 |
| 0100 | Removal of water meter and box (206E073) | EACH | 16 | $100.00 | $500.00 | $1,000.00 | $250.00 | $288.18 |
| 0110 | Unclassified excavation (210A000) | CY | 586 | $40.00 | $100.00 | $111.00 | $40.00 | $62.67 |
| 0120 | Borrow excavation (loose truckbed measurement) (210D001) | CY | 585 | $45.00 | $50.00 | $73.00 | $50.00 | $73.81 |
| 0130 | Structure excavation (214A000) | CY | 368 | $55.00 | $100.00 | $87.50 | $55.00 | $76.68 |
| 0140 | Foundation backfill, commercial (214B001) | CY | 106 | $95.00 | $75.00 | $106.75 | $100.00 | $162.48 |
| 0150 | Coarse aggregate, section 801, for miscellaneous use (305B071) | TON | 700 | $50.00 | $75.00 | $72.50 | $55.00 | $84.01 |
| 0160 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 127 | $50.00 | $75.00 | $69.25 | $65.00 | $97.95 |
| 0170 | Tack coat (405A000) | GAL | 1,181 | $4.20 | $4.50 | $4.27 | $3.80 | $5.52 |
| 0180 | Planing existing pavement (approximately 1.10" thru 2.0" thick) (408A052) | SY | 13,114 | $2.95 | $3.10 | $5.00 | $2.65 | $3.85 |
| 0190 | Material remixing device (410H000) | EACH | 1 | $8,800.00 | $9,360.00 | $8,988.00 | $8,000.00 | $11,620 |
| 0200 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 1,279 | $145.20 | $155.00 | $148.50 | $132.00 | $196.29 |
| 0210 | Superpave bituminous concrete wearing surface layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424A366) | TON | 181 | $211.20 | $225.00 | $216.00 | $192.00 | $278.89 |
| 0220 | Superpave bituminous concrete upper binder layer, patching, 1/2" maximum aggregate size mix, esal range C/D (424B653) | TON | 204 | $275.00 | $400.00 | $125.00 | $110.00 | $168.40 |
| 0230 | 15" roadway pipe (class 3 R.C.) (530A000) | LF | 221 | $200.00 | $175.00 | $125.50 | $300.00 | $142.89 |
| 0240 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 71 | $200.00 | $200.00 | $118.50 | $325.00 | $179.36 |
| 0250 | 22" span, 14" rise roadway pipe (class 3 R.C.) (530B001) | LF | 11 | $250.00 | $300.00 | $304.50 | $315.00 | $703.62 |
| 0260 | 15" storm sewer pipe (class 3 R.C.) (533A097) | LF | 177 | $195.00 | $175.00 | $125.50 | $300.00 | $132.30 |
| 0270 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 29 | $215.00 | $200.00 | $118.50 | $325.00 | $297.33 |
| 0280 | 18" storm sewer pipe (class 3 R.C.) (extension) (533A348) | LF | 14 | $225.00 | $300.00 | $118.50 | $400.00 | $521.71 |
| 0290 | Mobilization (600A000) | LS | 1 | $225,000 | $172,515 | $119,314 | $761,494 | $112,661 |
| 0300 | Brick paving (613F000) | SF | 3,153 | $26.00 | $24.00 | $33.50 | $20.00 | $52.52 |
| 0310 | Concrete sidewalk, 4" thick (618A000) | SY | 3,452 | $90.00 | $100.00 | $208.00 | $115.00 | $155.89 |
| 0320 | Concrete driveway, 6" thick (includes wire mesh) (618B003) | SY | 1,033 | $98.00 | $110.00 | $225.00 | $125.00 | $190.95 |
| 0330 | Curb ramp (618D000) | SY | 299 | $350.00 | $400.00 | $500.00 | $400.00 | $400.08 |
| 0340 | Minor structure concrete (620A000) | CY | 1 | $2,500.00 | $3,000.00 | $4,620.00 | $2,500.00 | $2,951.14 |
| 0350 | Junction boxes, type 1 or 1P (621A011) | EACH | 4 | $5,000.00 | $6,500.00 | $4,936.00 | $9,000.00 | $6,504.42 |
| 0360 | Inlets, type "special" (621C030) | EACH | 7 | $6,000.00 | $8,500.00 | $10,290 | $10,000 | $11,294 |
| 0370 | Inlets, type S3 (1 wing) (modified) (621C071) | EACH | 15 | $5,500.00 | $7,500.00 | $9,685.00 | $7,500.00 | $9,761.39 |
| 0380 | Inlets, type PVC (621C170) | EACH | 12 | $5,000.00 | $8,500.00 | $4,433.00 | $2,500.00 | $10,922 |
| 0390 | Concrete curb, type A (623B002) | LF | 345 | $55.00 | $60.00 | $69.50 | $50.00 | $56.33 |
| 0400 | Combination curb & gutter, type C (modified) (623C003) | LF | 2,368 | $40.00 | $60.00 | $32.50 | $42.50 | $64.39 |
| 0410 | 1 inch pex water service line laid (641A414) | LF | 449 | $70.00 | $100.00 | $140.50 | $425.00 | $180.11 |
| 0420 | 6 inch ductile iron water main laid (641A612) | LF | 60 | $200.00 | $250.00 | $501.00 | $75.00 | $288.18 |
| 0430 | Fire hydrant (641D500) | EACH | 3 | $9,000.00 | $9,000.00 | $10,673 | $13,500 | $10,807 |
| 0440 | 6 inch gate valve with box (641J516) | EACH | 3 | $2,800.00 | $3,200.00 | $3,371.00 | $1,500.00 | $432.27 |
| 0450 | 1 inch water meter and box reset (641R515) | EACH | 16 | $500.00 | $2,600.00 | $2,809.00 | $2,000.00 | $4,322.65 |
| 0460 | Manhole frame and cover reset (645K500) | EACH | 2 | $750.00 | $2,000.00 | $3,932.00 | $10,000 | $5,043.09 |
| 0470 | Topsoil (650A000) | CY | 68 | $50.00 | $100.00 | $41.25 | $65.00 | $95.51 |
| 0480 | Solid sodding (654A000) | SY | 526 | $10.45 | $20.00 | $12.00 | $9.50 | $38.32 |
| 0490 | Shrubs, ophiopogon japonicus (mondo grass) (660C090) | EACH | 2,610 | $3.30 | $3.25 | $9.50 | $2.25 | $4.32 |
| 0500 | Shrubs, juncus effusus (soft rush) (660C208) | EACH | 823 | $14.85 | $33.00 | $28.50 | $15.00 | $54.75 |
| 0510 | Shrubs, raphiolepsis indica "snow white" (snow white dwarf indian hawthorn) (660C269) | EACH | 334 | $23.10 | $68.00 | $46.50 | $22.00 | $51.87 |
| 0520 | Shrubs, iris hexagona (louisiana iris) (660C271) | EACH | 823 | $17.35 | $33.00 | $26.50 | $16.00 | $79.25 |
| 0530 | Trees, magnolia virginiana (sweetbay magnolia) (660D064) | EACH | 6 | $645.00 | $1,100.00 | $1,142.00 | $425.00 | $1,296.80 |
| 0540 | Trees, ulmus parvifolia (chinese elm) (660D140) | EACH | 23 | $462.00 | $900.00 | $744.00 | $425.00 | $1,296.80 |
| 0550 | Trees, crataegus virdis (winter king hawthorn) (660D229) | EACH | 23 | $336.00 | $900.00 | $811.50 | $415.00 | $1,296.80 |
| 0560 | Temporary seeding (665A000) | ACRE | 1 | $100.00 | $1,500.00 | $1,000.00 | $350.00 | $871.73 |
| 0570 | Temporary mulching (665B001) | TON | 1 | $100.00 | $1,500.00 | $750.00 | $450.00 | $900.55 |
| 0580 | Polyethylene (665E000) | SY | 500 | $1.00 | $5.00 | $5.00 | $6.00 | $6.75 |
| 0590 | Sand bags (665G000) | EACH | 100 | $7.00 | $10.00 | $5.00 | $10.00 | $8.72 |
| 0600 | Silt fence (665J002) | LF | 2,010 | $6.00 | $6.00 | $8.00 | $6.00 | $13.93 |
| 0610 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 25 | $50.00 | $100.00 | $100.00 | $75.00 | $77.94 |
| 0620 | Silt fence removal (665O001) | LF | 2,010 | $1.00 | $2.00 | $2.00 | $1.50 | $2.79 |
| 0630 | Inlet protection, stage 3 or 4 (665P005) | EACH | 52 | $300.00 | $200.00 | $100.00 | $400.00 | $357.24 |
| 0640 | Wattle (665Q002) | LF | 200 | $11.00 | $10.00 | $15.00 | $15.00 | $45.36 |
| 0650 | Construction safety fence (674A000) | LF | 1,500 | $4.00 | $6.00 | $5.00 | $5.00 | $5.84 |
| 0660 | Bioretention basin, #1 (676A001) | LS | 1 | $6,000.00 | $18,000 | $27,825 | $41,631 | $15,839 |
| 0670 | Bioretention basin, #2 (676A002) | LS | 1 | $6,500.00 | $18,000 | $30,385 | $42,824 | $20,694 |
| 0680 | Bioretention basin, #3 (676A003) | LS | 1 | $4,500.00 | $18,000 | $15,273 | $32,149 | $12,994 |
| 0690 | Bioretention basin, #4 (676A004) | LS | 1 | $5,500.00 | $18,000 | $17,260 | $33,650 | $13,826 |
| 0700 | Bioretention basin, #5 (676A005) | LS | 1 | $5,400.00 | $18,000 | $16,187 | $33,237 | $13,426 |
| 0710 | Bioretention basin, #6 (676A006) | LS | 1 | $5,500.00 | $18,000 | $14,743 | $31,863 | $11,966 |
| 0720 | Bioretention basin, #7 (676A007) | LS | 1 | $4,600.00 | $18,000 | $21,081 | $36,118 | $15,244 |
| 0730 | Bioretention basin, #8 (676A008) | LS | 1 | $4,900.00 | $18,000 | $15,153 | $32,342 | $11,668 |
| 0740 | Bioretention basin, #9 (676A009) | LS | 1 | $18,000 | $18,000 | $19,389 | $33,647 | $14,521 |
| 0750 | Bioretention basin, #10 (676A010) | LS | 1 | $4,700.00 | $18,000 | $16,891 | $34,177 | $13,480 |
| 0760 | Bioretention basin, #11 (676A011) | LS | 1 | $4,650.00 | $18,000 | $13,899 | $31,914 | $12,140 |
| 0770 | Geometric controls (680A001) | LS | 1 | $50,000 | $67,000 | $56,000 | $145,000 | $57,635 |
| 0780 | Construction fuel (maximum bid limited to $ 150,000.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0790 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 1 | $5,000.00 | $12,870 | $4,851.00 | $4,200.00 | $6,051.71 |
| 0800 | Dotted, class 2, type A, traffic stripe (701B205) | LF | 1,601 | $1.49 | $2.00 | $1.45 | $1.25 | $1.80 |
| 0810 | Broken temporary traffic stripe (paint) (701C002) | MI | 1 | $1,375.00 | $2,400.00 | $1,155.00 | $1,000.00 | $1,440.88 |
| 0820 | Solid temporary traffic stripe (paint) (701E001) | LF | 5,652 | $0.27 | $1.50 | $0.25 | $0.22 | $0.32 |
| 0830 | Broken white, class 2, type A traffic stripe (5" wide) (701G242) | LF | 298 | $0.53 | $3.00 | $0.90 | $0.75 | $1.08 |
| 0840 | Solid white, class 2, type A traffic stripe (5" wide) (701G253) | LF | 5,651 | $0.94 | $3.00 | $1.25 | $1.00 | $1.44 |
| 0850 | Traffic control markings, class 1, type B (703A001) | SF | 3,103 | $12.82 | $3.50 | $7.00 | $6.00 | $8.65 |
| 0860 | Traffic control markings, class 2, type A (703A002) | SF | 1,601 | $5.50 | $8.25 | $7.00 | $6.00 | $8.65 |
| 0870 | Traffic control legends, class 2, type A (703B002) | SF | 315 | $6.05 | $12.00 | $7.00 | $6.00 | $8.65 |
| 0880 | Temporary traffic control markings (703D001) | SF | 1,601 | $2.20 | $3.00 | $3.50 | $3.00 | $4.32 |
| 0890 | Specialty traffic control markings (703H000) | SF | 267 | $41.80 | $24.00 | $64.00 | $55.00 | $79.25 |
| 0900 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 48 | $11.00 | $18.00 | $11.75 | $10.00 | $14.41 |
| 0910 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 41 | $11.00 | $18.00 | $11.75 | $10.00 | $14.41 |
| 0920 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 176 | $40.00 | $27.00 | $46.25 | $23.00 | $36.74 |
| 0930 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 8 | $90.00 | $24.00 | $100.00 | $20.00 | $36.74 |
| 0940 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 70 | $35.00 | $21.00 | $31.50 | $18.00 | $22.33 |
| 0950 | Removal of existing traffic control unit ( 41ST street south at 3RD avenue south) (730A000) | LS | 1 | $5,500.00 | $5,265.00 | $11,179 | $4,500.00 | $7,306.40 |
| 0960 | Furnishing and installing traffic control unit ( 41ST street south at 3RD avenue south) (730C000) | LS | 1 | $18,342 | $21,060 | $28,058 | $18,000 | $24,367 |
| 0970 | Metal traffic signal pole foundation (730E000) | EACH | 4 | $8,813.00 | $8,775.00 | $7,811.00 | $7,500.00 | $11,709 |
| 0980 | Metal traffic signal pole with 35' mast arm assembly (730F000) | EACH | 1 | $24,565 | $24,570 | $26,693 | $21,000 | $32,634 |
| 0990 | Metal traffic signal pole with 45' mast arm assembly (730F001) | EACH | 2 | $34,172 | $32,760 | $29,308 | $28,000 | $45,397 |
| 1000 | Metal traffic signal pole with 50' mast arm assembly (730F002) | EACH | 1 | $34,580 | $32,760 | $31,054 | $28,000 | $45,939 |
| 1010 | Traffic signal junction box type S1 (730K001) | EACH | 4 | $881.00 | $760.00 | $671.00 | $650.00 | $1,170.25 |
| 1020 | Traffic signal junction box type S2 (730K002) | EACH | 2 | $1,552.00 | $1,638.00 | $1,435.00 | $1,400.00 | $2,063.09 |
| 1030 | 1", non-metallic, conduit (730L003) | LF | 35 | $6.37 | $12.00 | $16.50 | $10.00 | $8.46 |
| 1040 | 2", non-metallic, conduit (730L005) | LF | 650 | $10.77 | $14.00 | $21.00 | $12.00 | $14.31 |
| 1050 | Luminaire extension assembly, 12' (730N000) | EACH | 4 | $4,145.00 | $4,446.00 | $2,934.00 | $3,800.00 | $4,410.36 |
| 1060 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 8 | $1,512.00 | $1,287.00 | $1,447.00 | $1,100.00 | $2,007.89 |
| 1070 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 4 | $1,955.00 | $1,638.00 | $2,045.00 | $1,400.00 | $2,596.32 |
| 1080 | Pedestrian signal head, type LED (730P100) | EACH | 8 | $3,240.00 | $936.00 | $1,807.00 | $800.00 | $4,303.49 |
| 1090 | Controller assembly, type atc, 32 channels (730R047) | EACH | 1 | $34,665 | $32,760 | $30,626 | $28,000 | $41,666 |
| 1100 | Furnishing and installing emergency vehicle preemption system( 41ST street south at 3RD avenue south) (730S002) | LS | 1 | $12,945 | $14,040 | $9,331.00 | $12,000 | $14,273 |
| 1110 | Electrical power service assembly without wood pole (730T011) | EACH | 1 | $2,950.00 | $5,616.00 | $1,040.00 | $4,800.00 | $3,916.86 |
| 1120 | Video detection system ( 41ST street south at 3RD avenue south) (730U015) | LS | 1 | $50,219 | $40,950 | $45,516 | $35,000 | $59,406 |
| 1130 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y000) | LS | 1 | $7,290.00 | $15,210 | $18,679 | $13,000 | $9,683.92 |
| 1140 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y001) | LS | 1 | $7,290.00 | $15,210 | $18,679 | $13,000 | $9,683.92 |
| 1143 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y002) | LS | 1 | $7,290.00 | $15,210 | $18,679 | $13,000 | $9,683.92 |
| 1147 | Furnishing and installing pedestal pole and foundation with flashing beacon (730Y003) | LS | 1 | $7,290.00 | $15,210 | $18,679 | $13,000 | $9,683.92 |
| 1150 | Construction signs (740B000) | SF | 678 | $10.00 | $7.00 | $9.00 | $15.00 | $18.20 |
| 1160 | Channelizing drums (740D000) | EACH | 500 | $50.00 | $50.00 | $51.00 | $75.00 | $99.40 |
| 1170 | Cones (36 inches high) (740E000) | EACH | 50 | $30.00 | $50.00 | $27.00 | $50.00 | $129.61 |
| 1180 | Barricades, type II (740F001) | EACH | 4 | $175.00 | $150.00 | $168.50 | $150.00 | $1,195.12 |
| 1190 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $3,000.00 | $3,200.00 | $2,809.00 | $3,500.00 | $3,674.25 |
| 1200 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $7,000.00 | $9,000.00 | $7,022.00 | $5,000.00 | $6,411.93 |
| 1205 | Roadway luminaire assembly with one, decorative LED, 80 watt equivalent luminaire (750B650) | EACH | 28 | $11,900 | $10,179 | $9,989.00 | $8,700.00 | $14,505 |
| 1210 | Electrical junction box,type 1 (750D200) | EACH | 11 | $1,394.00 | $760.00 | $711.00 | $650.00 | $1,851.34 |
| 1220 | Conduit, 2 inch, rigid metallic (750E127) | LF | 50 | $21.75 | $12.00 | $14.75 | $10.00 | $28.89 |
| 1230 | Conductor, #6 AWG (750F024) | LF | 50 | $2.70 | $6.00 | $9.50 | $5.00 | $3.58 |
| 1240 | Conductor, #2 AWG (750F026) | LF | 100 | $5.40 | $6.00 | $17.50 | $5.00 | $7.17 |
| 1250 | Combined duct and cable,2 #6 AWG/ 1 #6 AWG GND (750G010) | LF | 2,849 | $11.92 | $14.00 | $13.50 | $12.00 | $15.83 |
| 1260 | Combined duct and cable, 4 #6 AWG/ 1 #6 AWG GND (750G012) | LF | 65 | $16.65 | $14.00 | $27.25 | $12.00 | $22.09 |
| 1270 | Service pole (750H005) | EACH | 1 | $3,388.00 | $3,276.00 | $3,315.50 | $2,800.00 | $4,501.53 |
| 1275 | Lighting control center (750I015) | EACH | 1 | $47,402 | $42,120 | $41,558 | $36,000 | $57,127 |
| 1280 | Remove roadway luminaire (751L022) | EACH | 9 | $209.00 | $585.00 | $230.00 | $500.00 | $276.47 |
| 1290 | 4" electrical conduit, 1 line, type 5 installation (756A022) | LF | 560 | $53.95 | $87.75 | $41.00 | $75.00 | $71.68 |
| 1300 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 205 | $92.90 | $111.00 | $50.75 | $95.00 | $123.42 |
| 1310 | Site furnishings ( bike rack) (792A000) | EACH | 6 | $1,500.00 | $2,000.00 | $1,633.00 | $600.00 | $2,079.03 |
| 1320 | Site furnishings ( park bench) (792A001) | EACH | 4 | $1,600.00 | $3,500.00 | $1,941.00 | $1,750.00 | $3,697.12 |
| 1330 | Site furnishings ( trash receptacle) (792A002) | EACH | 8 | $2,000.00 | $2,350.00 | $2,322.00 | $2,250.00 | $4,168.83 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.