ALDOT contract 20260227028 bid tabulation
ROADWAY SAFETY IMPROVEMENTS (DRAINAGE IMPROVEMENTS) ON SR-12 (US-84) AT THE JUNCTION OF CR-502 EAST OF ELBA. Let by Alabama DOT on February 27, 2026, Coffee, 0702. 5 bids received; low bid $579,353 by S. A. Graham Company, Inc..
- Owner
- Alabama DOT
- Letting
- 27 FEB 2026
- Pay items
- 52
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S. A. Graham Company, Inc. | $579,353 | Low |
| 2 | Grady Ralls & Sons, Inc. | $663,443 | +15% |
| 3 | Wiregrass Construction Company, Inc. | $694,296 | +20% |
| 4 | PL Russell LLC | $850,735 | +47% |
| 5 | Gibson Construction Services, LLC | $889,373 | +54% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S. A. Graham Company, Inc. | 2. Grady Ralls & Sons, Inc. | 3. Wiregrass Construction Company, Inc. | 4. PL Russell LLC | 5. Gibson Construction Services, LLC |
|---|---|---|---|---|---|---|---|---|
| 0010 | Removing concrete flumes (206C003) | SY | 21 | $13.50 | $12.00 | $63.70 | $24.35 | $25.00 |
| 0020 | Removing pipe (206D000) | LF | 87 | $10.00 | $10.00 | $20.94 | $24.35 | $20.00 |
| 0030 | Removing inlets (206E001) | EACH | 2 | $500.00 | $375.00 | $728.18 | $1,217.73 | $850.00 |
| 0040 | Removing slope paved headwall (206E050) | EACH | 7 | $500.00 | $250.00 | $520.90 | $304.61 | $750.00 |
| 0050 | Unclassified excavation (210A000) | CY | 4,240 | $11.00 | $25.00 | $23.81 | $19.09 | $24.50 |
| 0060 | Structure excavation (214A000) | CY | 166 | $10.00 | $10.00 | $41.71 | $34.81 | $50.00 |
| 0070 | Foundation backfill, commercial (214B001) | CY | 61 | $83.25 | $72.00 | $137.26 | $173.06 | $150.00 |
| 0080 | Cement mortar flowable backfill, mix 4 (260A003) | CY | 13 | $500.00 | $810.00 | $378.68 | $804.49 | $950.00 |
| 0090 | Steel reinforcement (502A000) | LB | 1,110 | $2.10 | $2.75 | $5.36 | $8.67 | $4.00 |
| 0100 | 24" roadway pipe, jacked installation (smooth steel) (530C002) | LF | 110 | $745.00 | $495.00 | $689.52 | $912.10 | $833.75 |
| 0110 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 49 | $75.00 | $75.00 | $56.20 | $56.68 | $135.00 |
| 0120 | 30" storm sewer pipe (class 3 R.C.) (533A100) | LF | 96 | $105.00 | $91.00 | $86.51 | $93.76 | $150.00 |
| 0130 | 29" span, 18" rise storm sewer pipe (class 3 R.C.) (533B099) | LF | 22 | $106.00 | $110.00 | $111.27 | $109.42 | $166.00 |
| 0140 | 6" side drain pipe (PVC) (535A239) | LF | 4 | $70.00 | $150.00 | $75.26 | $179.16 | $200.00 |
| 0150 | Mobilization (600A000) | LS | 1 | $54,500 | $35,000 | $95,967 | $107,438 | $39,000 |
| 0160 | Loose riprap, class 1 (610C000) | TON | 71 | $65.00 | $100.00 | $94.29 | $103.19 | $120.00 |
| 0170 | Loose riprap, class 2 (610C001) | TON | 1,587 | $62.50 | $72.00 | $78.67 | $100.13 | $120.00 |
| 0180 | Filter blanket, geotextile (610D003) | SY | 9,004 | $1.95 | $2.50 | $1.85 | $4.87 | $6.50 |
| 0190 | 30" side drain pipe end treatment, class 1 (double line) (619A273) | EACH | 2 | $4,740.00 | $6,000.00 | $3,236.68 | $1,549.57 | $3,000.00 |
| 0200 | Minor structure concrete (620A000) | CY | 15 | $1,580.00 | $1,800.00 | $1,523.06 | $1,491.05 | $2,500.00 |
| 0210 | Manholes, type L or M (storm) (621E004) | EACH | 1 | $4,053.00 | $3,900.00 | $4,080.74 | $2,971.80 | $6,500.00 |
| 0220 | Steel beam guardrail, class A, type 2 (8'-0" post) (630A034) | LF | 1,282 | $27.10 | $30.00 | $27.58 | $29.76 | $30.00 |
| 0230 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 2 | $1,735.00 | $5,000.00 | $1,591.19 | $1,716.96 | $1,725.00 |
| 0240 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 2 | $4,000.00 | $5,000.00 | $3,818.86 | $4,120.70 | $4,140.00 |
| 0250 | Seeding (652A100) | ACRE | 3 | $1,470.00 | $1,500.00 | $957.26 | $13.74 | $1,500.00 |
| 0260 | Mowing (652C000) | ACRE | 6 | $210.50 | $100.00 | $105.70 | $314.78 | $200.00 |
| 0270 | Solid sodding (bermuda) (654A001) | SY | 9,897 | $5.55 | $7.10 | $4.87 | $5.84 | $6.00 |
| 0280 | Mulching (656A010) | ACRE | 3 | $842.00 | $1,000.00 | $538.46 | $801.25 | $1,500.00 |
| 0290 | Erosion control product, type S3 (659C001) | SY | 3,724 | $1.50 | $2.85 | $2.39 | $2.00 | $4.00 |
| 0300 | Erosion control product, type S2 (659C002) | SY | 3,037 | $1.40 | $2.85 | $2.39 | $1.83 | $5.00 |
| 0310 | Temporary seeding (665A000) | ACRE | 2 | $84.00 | $0.01 | $1.06 | $1,144.64 | $950.00 |
| 0320 | Temporary mulching (665B001) | TON | 6 | $370.00 | $0.01 | $1.06 | $457.86 | $650.00 |
| 0330 | Temporary pipe (665C010) | LF | 30 | $37.50 | $28.00 | $85.50 | $40.09 | $85.00 |
| 0340 | Temporary pipe end treatment (665D001) | EACH | 2 | $250.00 | $250.00 | $3,236.68 | $556.80 | $1,500.00 |
| 0350 | Sand bags (665G000) | EACH | 100 | $15.80 | $0.01 | $6.38 | $13.74 | $10.00 |
| 0360 | Flow baffle (665H005) | LF | 355 | $7.45 | $9.10 | $8.63 | $13.74 | $13.00 |
| 0370 | Temporary riprap, class 2 (665I000) | TON | 60 | $68.25 | $85.00 | $94.67 | $153.43 | $120.00 |
| 0380 | Silt fence (665J002) | LF | 2,770 | $3.77 | $2.00 | $1.06 | $5.61 | $5.50 |
| 0390 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 504 | $55.25 | $72.00 | $52.10 | $91.80 | $85.00 |
| 0400 | Temporary coarse aggregate,aldot number 4 (665N001) | TON | 12 | $66.25 | $110.00 | $62.50 | $103.44 | $100.00 |
| 0410 | Silt fence removal (665O001) | LF | 2,770 | $0.80 | $0.50 | $0.01 | $1.14 | $1.50 |
| 0420 | Inlet protection, stage 3 or 4 (665P005) | EACH | 3 | $250.00 | $265.00 | $135.61 | $858.48 | $650.00 |
| 0430 | Wattle (665Q002) | LF | 100 | $7.35 | $8.00 | $1.06 | $16.02 | $10.50 |
| 0440 | Basin dewatering device (665X000) | EACH | 2 | $5,000.00 | $2,500.00 | $5,804.74 | $8,584.79 | $8,500.00 |
| 0450 | Pest control treatment (666A001) | ACRE | 3 | $1.05 | $0.01 | $0.01 | $572.32 | $0.01 |
| 0460 | Geometric controls (680A001) | LS | 1 | $4,500.00 | $10,000 | $5,610.61 | $17,616 | $5,500.00 |
| 0470 | Construction fuel (maximum bid limited to $ 33,965.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.01 |
| 0480 | Construction signs (740B000) | SF | 888 | $7.25 | $6.75 | $6.90 | $7.44 | $6.61 |
| 0490 | Channelizing drums (740D000) | EACH | 100 | $20.00 | $30.00 | $10.61 | $11.45 | $27.60 |
| 0500 | Cones (36 inches high) (740E000) | EACH | 20 | $28.00 | $22.00 | $26.70 | $11.45 | $17.25 |
| 0510 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $417.00 | $1,150.00 | $397.80 | $429.24 | $1,500.00 |
| 0520 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $725.00 | $1,950.00 | $689.52 | $744.02 | $1,725.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of February 27, 2026. Compiled by Mirage Metrics.