East Alabama Paving Company, Inc.: ALDOT bid record
East Alabama Paving Company, Inc. submitted 36 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 26 JUN 2026, and was the low bidder on 30 of them (83%). When it was not low, its total sat a median +6.0% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $93,417,099
- Latest bid
- 26 JUN 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 8 | 100% |
| 2023 | 7 | 6 | 86% |
| 2024 | 9 | 6 | 67% |
| 2025 | 5 | 4 | 80% |
| 2026 | 7 | 6 | 86% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0606 | 22 | 19 | 86% |
| 0403 | 8 | 7 | 88% |
| 0602 | 4 | 3 | 75% |
| 0601 | 1 | 1 | 100% |
| 0401 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Material remixing device | 410H000 | EACH | 9 | 8 (89%) | $27,000 | $34,670 |
| Guardrail end anchor, type 20 series (MASH) | 630C080 | EACH | 7 | 7 (100%) | $3,369.00 | $3,785.66 |
| Traffic control markings, class 2, type A | 703A002 | SF | 14 | 6 (43%) | $5.79 | $6.00 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 14 | 6 (43%) | $4,395.00 | $4,427.98 |
| Cones (36 inches high) | 740E000 | EACH | 13 | 6 (46%) | $30.00 | $20.47 |
| Pavement markers, class A-H, type 1-B | 705A032 | EACH | 13 | 6 (46%) | $5.53 | $5.85 |
| Temporary traffic control markings | 703D001 | SF | 11 | 6 (55%) | $2.11 | $2.35 |
| Aggregate surfacing (1" down, crusher run) | 430B043 | TON | 11 | 6 (55%) | $50.00 | $70.00 |
| Tack coat | 405A000 | GAL | 8 | 6 (75%) | $5.38 | $4.55 |
| Construction signs | 740B000 | SF | 15 | 5 (33%) | $10.00 | $7.00 |
| Solid temporary traffic stripe | 701C001 | MI | 13 | 5 (38%) | $1,027.00 | $1,064.57 |
| Broken temporary traffic stripe | 701C000 | MI | 13 | 5 (38%) | $1,000.00 | $1,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| D & J Enterprises, Inc. | 6 | 3 of 6 |
| Wiregrass Construction Company, Inc. | 3 | 0 of 3 |
| Gary Ingram Grading & Paving, Inc. | 3 | 2 of 3 |
| Midsouth Paving, Inc. | 2 | 0 of 2 |
| McElhenney Construction Co., LLC | 2 | 0 of 2 |
| Asphalt Contractors, Inc. | 1 | 1 of 1 |
| Apac-Alabama, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 JUN 2026 | 20260626001 | 0403 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND GUARDRAIL INSTALLATION) ON CR-83 FROM THE JUNCTION OF CR-299 TO THE JUNCTION OF CR-292 NORT | 1 of 1 | $378,722 | Low |
| 26 JUN 2026 | 20260626008 | 0606 | ROADWAY SAFETY IMPROVEMENTS (WIDENING, RESURFACING, TRAFFIC CONTROL MARKINGS, AND TRAFFIC CONTROL LEGENDS) ON CR-188 FROM THE MACON COUNTY L | 1 of 1 | $406,568 | Low |
| 26 JUN 2026 | 20260626032 | 0606 | ROADWAY IMPROVEMENTS (MICRO-MILL, RESURFACE, CURB AND GUTTER INSTALLATION, SIDEWALK INSTALLATION, AND TRAFFIC STRIPE) ON 4TH AVE FROM 19TH S | 1 of 1 | $2,196,242 | Low |
| 27 MAR 2026 | 20260327044 | 0606 | INTERSECTION IMPROVEMENTS TO INCLUDE LEFT TURN LANE ADDITIONS AND TRAFFIC SIGNAL MODIFICATIONS ON SR-38 (US-280) AT FREDERICK ROAD IN OPELIK | 1 of 2 | $2,186,587 | Low, 2.0% under the second |
| 27 FEB 2026 | 20260227022 | 0606 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE INTERSECTION OF FREEMAN ROAD TO A POINT 0.420 MIL | 1 of 1 | $5,109,122 | Low |
| 30 JAN 2026 | 20260130036 | 0403 | MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM SOUTH OF THE INTERSECTION OF SR-50 | 1 of 1 | $3,152,263 | Low |
| 30 JAN 2026 | 20260130040 | 0602 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE BEGINNING OF THE 4-LANE UNDIVIDED SECTION TO THE END OF THE 4-LANE DIVIDED | 2 of 4 | $7,820,181 | +8.0% |
| 05 DEC 2025 | 20251205026 | 0606 | ROADWAY SAFETY IMPROVEMENTS ON CR-54 FROM THE MACON COUNTY LINE TO THE INTRERSECTION OF CR-146 (MOORE'S MILL ROAD) SOUTH EAST OF AUBURN | 1 of 1 | $352,479 | Low |
| 05 DEC 2025 | 20251205044 | 0606 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-14 FROM THE MACON COUNTY LINE TO THE SR-147 (SHUG JORDAN PARKWAY) INTERCHAGNE IN AUBURN | 1 of 1 | $4,461,197 | Low |
| 26 SEP 2025 | 20250926032 | 0606 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-246/CR-298 (MULLIN ROAD) FROM THE JUNCTION OF CR-430 TO THE JUNCTION OF CR-430 | 1 of 1 | $996,528 | Low |
| 30 MAY 2025 | 20250530007 | 0606 | INTERSECTION IMPROVEMENTS (GRADING, DRAINAGE, AND PAVEMENT) ON SR-1 (US-431) AT SR-26 IN SEALE | 1 of 2 | $1,352,651 | Low, 11% under the second |
| 28 FEB 2025 | 20250228012 | 0401 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND SCORING) ON CR-15 FROM THE JUNCTION OF SR-49 NORTHEAST OF REELTOWN TO THE JUNCTION OF SR-50 | 2 of 2 | $903,745 | +18% |
| 06 DEC 2024 | 20241206027 | 0403 | TRUCK PASSING LANES ADDITIONS AND RESURFACING ON SR-1 (US-431) FROM 0.548 MILE SOUTH OF THE JUNCTION OF CR-93 NORTH OF LAFAYETTE TO MP 175.9 | 2 of 2 | $8,727,357 | +7.0% |
| 08 NOV 2024 | 20241108033 | 0602 | RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-186 FROM THE I-85 OVERPASS TO THE JUNCTION OF SR-8 (US-80) NORTHEAST OF TUSK | 1 of 2 | $2,191,234 | Low, 13% under the second |
| 08 NOV 2024 | 20241108053 | 0403 | SAFETY WIDENING, RESURFACING (SCRUB SEAL), AND STRIPE ON SR-50 FROM THE JUNCTION OF AVENUE A (MP 42.925) IN LAFAYETTE TO THE JUNCTION OF CR- | 1 of 1 | $4,460,950 | Low |
| 27 SEP 2024 | 20240927034 | 0606 | WIDENING, RESURFACING (SCRUB SEAL), TRAFFIC STRIPE ON CR-212 FROM THE RUSSELL COUNTY LINE TO THE JUNCTION OF CR- 240 SOUTH OF SMITHS STATION | 2 of 2 | $476,642 | +5.0% |
| 31 MAY 2024 | 20240531028 | 0403 | RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-50 FROM THE INTERSECTION OF SR-1 (US-431) TO THE JUNCTION OF AVENUE A IN LA | 1 of 2 | $1,003,876 | Low, 29% under the second |
| 31 MAY 2024 | 20240531032 | 0606 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-235 FROM THE JUNCTION OF CR-240 TO THE JUNCTION OF CR-246 SOUTHWEST OF SMITHS STATION | 1 of 2 | $570,421 | Low, 8.0% under the second |
| 26 APR 2024 | 20240426013 | 0606 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-85 FROM A POINT SOUTH OF EXIT 57 (MP 56.720) TO A POINT NORTH OF EXIT 64 (MP 65.271) IN | 1 of 1 | $5,294,792 | Low |
| 26 APR 2024 | 20240426038 | 0606 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-240 FROM A POINT NEAR THE HOSPILIKA CREEK BRIDGE TO THE JUNCTION OF COUNTY LIN | 2 of 2 | $1,160,959 | +3.0% |
| 29 MAR 2024 | 20240329021 | 0601 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-147 FROM THE I-85 INTERCHANGE TO THE JUNCTION OF NORTH COLLEGE STREET IN AUBURN | 1 of 2 | $5,636,203 | Low, 5.0% under the second |
| 29 SEP 2023 | 20230929026 | 0403 | SAFETY WIDENING, RESURFACE, AND BRIDGE GUARDRAIL RETRO ON SR-15 (US-29) FROM A POINT SOUTH OF THE JUNCTION OF JUDGE BROWN ROAD TO A POINT SO | 1 of 1 | $6,884,084 | Low |
| 28 JUL 2023 | 20230728009 | 0606 | RESURFACING AND TRAFFIC STRIPE ON CR-18 FROM CR-38 TO CR-56 (SITE 1) AND ON CR-56 FROM CR-18 TO FREEDOM WALK (SITE 2) | 1 of 1 | $614,616 | Low |
| 28 JUL 2023 | 20230728011 | 0606 | SAFETY IMPROVEMENTS (SAFETY WIDENING, GUARDRAIL, AND STRIPE) ON CR-379 FROM THE JUNCTION OF CR-798 TO THE JUNCTION OF CR-372 | 1 of 1 | $266,897 | Low |
| 30 JUN 2023 | 20230630027 | 0606 | WIDENING, RESURFACING (SCRUB SEAL), GUARDRAIL, AND STRIPE ON CR-137 (WIRE ROAD) FROM THE MACON COUNTY LINE TO THE JUNCTION OF CHADWICK LANE | 2 of 2 | $780,036 | +5.0% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.