Midsouth Paving, Inc.: ALDOT bid record
Midsouth Paving, Inc. submitted 124 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 29 SEP 2023, and was the low bidder on 41 of them (33%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $155,548,465
- Latest bid
- 29 SEP 2023
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 75 | 24 | 32% |
| 2023 | 49 | 17 | 35% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0603 | 13 | 2 | 15% |
| 0601 | 12 | 2 | 17% |
| 0301 | 8 | 3 | 38% |
| 0201 | 8 | 3 | 38% |
| 0402 | 8 | 4 | 50% |
| 0502 | 8 | 4 | 50% |
| 0701 | 7 | 6 | 86% |
| 0102 | 6 | 0 | 0% |
| 0202 | 6 | 2 | 33% |
| 0704 | 6 | 1 | 17% |
| 0702 | 5 | 0 | 0% |
| 0706 | 5 | 3 | 60% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Ballast for cone | 740M001 | EACH | 91 | 60 (66%) | $6.00 | $9.00 |
| Tack coat | 405A000 | GAL | 118 | 53 (45%) | $4.47 | $4.55 |
| Construction signs | 740B000 | SF | 124 | 51 (41%) | $7.04 | $7.00 |
| Solid temporary traffic stripe | 701C001 | MI | 119 | 43 (36%) | $1,005.00 | $1,064.57 |
| Traffic control markings, class 2, type A | 703A002 | SF | 120 | 41 (34%) | $5.98 | $6.00 |
| Broken temporary traffic stripe | 701C000 | MI | 109 | 41 (38%) | $957.73 | $1,000.00 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 101 | 38 (38%) | $3,850.00 | $4,427.98 |
| Solid yellow, class 2, type A traffic stripe (5" wide) | 701A230 | MI | 100 | 38 (38%) | $3,840.50 | $4,432.31 |
| Pavement markers, class A-H, type 2-C | 705A030 | EACH | 91 | 36 (40%) | $5.75 | $6.00 |
| Temporary traffic control markings | 703D001 | SF | 108 | 35 (32%) | $2.22 | $2.35 |
| Portable sequential arrow and chevron sign unit | 741C010 | EACH | 71 | 34 (48%) | $1,635.00 | $1,597.10 |
| Traffic control legends, class 2, type A | 703B002 | SF | 93 | 32 (34%) | $6.40 | $6.53 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 91 | 56 of 91 |
| Rogers Group, Inc. | 23 | 17 of 23 |
| Asphalt Contractors, Inc. | 20 | 13 of 20 |
| Dunn Construction Company, Inc. | 14 | 7 of 14 |
| Vulcan Materials Asphalt and Construction, | 12 | 6 of 12 |
| S. T. Bunn Construction Company, Inc. | 10 | 6 of 10 |
| Dubose Construction Company, LLC | 8 | 5 of 8 |
| S J & L General Contractor, LLC | 3 | 2 of 3 |
| McElhenney Construction Co., LLC | 3 | 0 of 3 |
| East Alabama Paving Company, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 SEP 2023 | 20230929019 | 0301 | RESURFACING (OGFC) AND TRAFFIC STRIPE ON I-59 FROM THE AVIATION AVENUE UNDERPASS IN WOODLAWN TO THE SOUTHBOUND OFF RAMP OF 4TH AVENUE SOUTH | 3 of 3 | $5,866,743 | +5.0% |
| 29 SEP 2023 | 20230929030 | 0601 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS SITES AS INDICATED IN THE PLANS | 3 of 3 | $694,896 | +5.0% |
| 29 SEP 2023 | 20230929040 | 0502 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE CITY OF NORTHPORT AND TUSCALOOSA AS INDICATED I | 2 of 2 | $5,075,438 | +15% |
| 29 SEP 2023 | 20230929045 | 06 | ACCESS MANAGEMENT (SERVICE ROADS AND LEFT TURN LANE INSTALL) ON VAUGHN ROAD AT SR-8 (US-231/EASTERN BOULEVARD) TO INCLUDE ADDING SERVICE ROA | 1 of 3 | $960,605 | Low, 14% under the second |
| 25 AUG 2023 | 20230825021 | 0601 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON DOSTER ROAD FROM FLEETWOOD ROAD TO SR-3 AND ON LOWER KINGSTON ROAD FROM 4TH STREET TO CR-85 | 3 of 3 | $1,066,850 | +14% |
| 25 AUG 2023 | 20230825024 | 0402 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON EULATION GATE ROAD AND OFF RAMP FROM A POINT NEAR THE ANNISTON ARMY DEPOT GATE T | 1 of 3 | $434,791 | Low, 1.0% under the second |
| 28 JUL 2023 | 20230728024 | 0601 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON WILLOW SPRINGS ROAD FROM THE JUNCTION OF JASMINE HILL ROAD TO THE JUNCTION OF REDLAND ROAD SOUTH | 2 of 4 | $297,711 | +7.0% |
| 28 JUL 2023 | 20230728025 | 0603 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-40/CR-101 FROM THE INTERSECTION OF SR-6 (US-82) TO THE JUNCTION OF CR-85 (OLD CARTER HILL ROA | 3 of 3 | $1,529,484 | +2.0% |
| 28 JUL 2023 | 20230728029 | 0602 | SAFETY WIDEN, PLANE, RESURFACE, GUARDRAIL INSTALL, & STRIPE ON SR-8 (US-80) FROM THE MONTGOMERY COUNTY LINE TO THE JUNCTION OF CR-40 IN SHOR | 2 of 3 | $3,422,701 | +2.0% |
| 30 JUN 2023 | 20230630011 | 0603 | ROADWAY IMPROVEMENTS (ADDITIONAL SOUTHBOUND AUXILIARY LANE) ON I-85 SOUTH FROM THE SR-271 (TAYLOR ROAD) INTERCHANGE TO THE SR-110 (CHANTILLY | 3 of 3 | $2,804,617 | +41% |
| 30 JUN 2023 | 20230630020 | 0601 | ROADWAY IMPROVEMENTS (RESURFACE, SIDEWALKS, LANDSCAPE) ON SOUTH MAIN STREET FROM THE JUNCTION OF SR-9 (US-231) TO THE JUNCTION OF EAST BRIDG | 3 of 3 | $1,647,213 | +25% |
| 30 JUN 2023 | 20230630021 | 0603 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-85 (OLD CARTER HILL/PIKE ROAD) FROM THE JUNCTION OF SR-6 (US-82) TO THE JUNCTION OF CR-83 (WA | 2 of 4 | $1,207,937 | +2.0% |
| 26 MAY 2023 | 20230526001 | 0601 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CHAPMAN ROAD FROM THE JUNCTION OF SR-143 TO COOSADA TOWN LIMITS (SITE 1) AND ON SR-143 TO CHAPM | 2 of 3 | $342,204 | +19% |
| 26 MAY 2023 | 20230526004 | 0603 | INTERSECTION IMPROVEMENTS (RESTRICTED CROSSING U-TURN) ON SR-9 (US-331) AT CR-61 (HOBBIE ROAD) SOUTHEAST OF HOPE HULL | 3 of 3 | $1,463,692 | +13% |
| 26 MAY 2023 | 20230526011 | 0601 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-6 FROM WEST 4TH STREET TO 0.800 MILE EAST OF SR-14; ON SR-6 FROM SR-3 TO I-65 | 1 of 3 | $5,978,754 | Low, 5.0% under the second |
| 26 MAY 2023 | 20230526014 | 0202 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 FROM THE JUNCTION OF PARRISH AVENUE TO A POINT 0.110 MILE NORTH OF THE JUNCTION OF C | 1 of 2 | $512,114 | Low, 4.0% under the second |
| 26 MAY 2023 | 20230526020 | 0604 | SAFETY WIDENING, PLANING, RESURFACING, GUARDRAIL, AND STRIPE ON SR-10 FROM THE JUNCTION OF BOLLING STREET IN GREENVILLE TO THE CRENSHAW COUN | 1 of 2 | $5,281,032 | Low, 16% under the second |
| 28 APR 2023 | 20230428004 | 0603 | INTERSECTION IMPROVEMENTS ON SR-53 (US-231) AT SR-6 (US-82) SOUTH OF MONTGOMERY | 1 of 2 | $1,443,238 | Low, 0.0% under the second |
| 28 APR 2023 | 20230428008 | 1008 | RESURFACING (MICRO-SURFACING SEAL COAT) AND TRAFFIC STRIPE ON I-22 FROM THE SR-118 UNDERPASS TO THE INDUSTRIAL PARKWAY UNDERPASS IN JASPER | 2 of 3 | $6,998,190 | +21% |
| 28 APR 2023 | 20230428009 | 0502 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-59 FROM 0.520 MILE WEST OF THE BUTTERMILK ROAD INTERCHANGE TO 1.200 MILES EAST OF THE SR | 1 of 2 | $3,315,588 | Low, 8.0% under the second |
| 28 APR 2023 | 20230428010 | 0301 | PAVEMENT REHABILITATION ON I-65 FROM THE SR-3 (US-31) INTERCHANGE TO A POINT 0.500 MILE SOUTH OF THE UNIVERSITY BOULEVARD INTERCHANGE | 1 of 3 | $13,899,510 | Low, 7.0% under the second |
| 28 APR 2023 | 20230428015 | 0305 | RESURFACING, GUARDRAIL SAFETY IMPROVEMENTS, & TRAFFIC STRIPE ON SR-38 (US-280) FROM THE JUNCTION OF NARROWS PARKWAY TO THE JUNCTION OF OLD H | 1 of 3 | $3,778,715 | Low, 3.0% under the second |
| 28 APR 2023 | 20230428016 | 0405 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-38 (US-280) FROM THE SHELBY COUNTY LINE TO THE JUNCTION OF CR-25 (MP 37.455) | 2 of 3 | $5,488,393 | +10% |
| 07 APR 2023 | 20230407018 | 0601 | RESURFACING WBL; RESURFACING AND WIDEN EBL; REPLACES BRIDGES ON SR-6 (US-82) FROM THE INTERSECTION OF SR-14 TO THE INTERSECTION OF SR-3 (US- | 4 of 4 | $11,520,726 | +9.0% |
| 07 APR 2023 | 20230407020 | 0301 | SAFETY WIDENING, RESURFACING, BRIDGE RAIL RETROFIT, & STRIPE ON SR-3 (US-31) FROM THE JUNCTION OF SNOW ROGERS ROAD TO THE JUNCTION OF THE HA | 1 of 4 | $4,842,706 | Low, 0.0% under the second |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.