Midsouth Paving, Inc.: ALDOT bid record

Midsouth Paving, Inc. submitted 124 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 29 SEP 2023, and was the low bidder on 41 of them (33%). When it was not low, its total sat a median +14% above the low bid.

Owner
Alabama DOT
Low bid volume
$155,548,465
Latest bid
29 SEP 2023
Data through
28 AUG 2026
124Bids
41Low bids
33Win rate, percent
+14%Median gap to the low bid when not low, 83 bids

By year

YearBidsLow bidsWin rate
2022752432%
2023491735%
Midsouth Paving, Inc., ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
060313215%
060112217%
03018338%
02018338%
04028450%
05028450%
07017686%
0102600%
02026233%
07046117%
0702500%
07065360%
Midsouth Paving, Inc., ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Ballast for cone740M001EACH9160 (66%)$6.00$9.00
Tack coat405A000GAL11853 (45%)$4.47$4.55
Construction signs740B000SF12451 (41%)$7.04$7.00
Solid temporary traffic stripe701C001MI11943 (36%)$1,005.00$1,064.57
Traffic control markings, class 2, type A703A002SF12041 (34%)$5.98$6.00
Broken temporary traffic stripe701C000MI10941 (38%)$957.73$1,000.00
Solid white, class 2, type A traffic stripe (5" wide)701A227MI10138 (38%)$3,850.00$4,427.98
Solid yellow, class 2, type A traffic stripe (5" wide)701A230MI10038 (38%)$3,840.50$4,432.31
Pavement markers, class A-H, type 2-C705A030EACH9136 (40%)$5.75$6.00
Temporary traffic control markings703D001SF10835 (32%)$2.22$2.35
Portable sequential arrow and chevron sign unit741C010EACH7134 (48%)$1,635.00$1,597.10
Traffic control legends, class 2, type A703B002SF9332 (34%)$6.40$6.53
Midsouth Paving, Inc., ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
29 SEP 2023202309290190301RESURFACING (OGFC) AND TRAFFIC STRIPE ON I-59 FROM THE AVIATION AVENUE UNDERPASS IN WOODLAWN TO THE SOUTHBOUND OFF RAMP OF 4TH AVENUE SOUTH 3 of 3$5,866,743+5.0%
29 SEP 2023202309290300601WIDENING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS SITES AS INDICATED IN THE PLANS3 of 3$694,896+5.0%
29 SEP 2023202309290400502MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE CITY OF NORTHPORT AND TUSCALOOSA AS INDICATED I2 of 2$5,075,438+15%
29 SEP 20232023092904506ACCESS MANAGEMENT (SERVICE ROADS AND LEFT TURN LANE INSTALL) ON VAUGHN ROAD AT SR-8 (US-231/EASTERN BOULEVARD) TO INCLUDE ADDING SERVICE ROA1 of 3$960,605Low, 14% under the second
25 AUG 2023202308250210601PLANING, RESURFACING, AND TRAFFIC STRIPE ON DOSTER ROAD FROM FLEETWOOD ROAD TO SR-3 AND ON LOWER KINGSTON ROAD FROM 4TH STREET TO CR-853 of 3$1,066,850+14%
25 AUG 2023202308250240402PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON EULATION GATE ROAD AND OFF RAMP FROM A POINT NEAR THE ANNISTON ARMY DEPOT GATE T1 of 3$434,791Low, 1.0% under the second
28 JUL 2023202307280240601PLANING, RESURFACING, AND TRAFFIC STRIPE ON WILLOW SPRINGS ROAD FROM THE JUNCTION OF JASMINE HILL ROAD TO THE JUNCTION OF REDLAND ROAD SOUTH2 of 4$297,711+7.0%
28 JUL 2023202307280250603PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-40/CR-101 FROM THE INTERSECTION OF SR-6 (US-82) TO THE JUNCTION OF CR-85 (OLD CARTER HILL ROA3 of 3$1,529,484+2.0%
28 JUL 2023202307280290602SAFETY WIDEN, PLANE, RESURFACE, GUARDRAIL INSTALL, & STRIPE ON SR-8 (US-80) FROM THE MONTGOMERY COUNTY LINE TO THE JUNCTION OF CR-40 IN SHOR2 of 3$3,422,701+2.0%
30 JUN 2023202306300110603ROADWAY IMPROVEMENTS (ADDITIONAL SOUTHBOUND AUXILIARY LANE) ON I-85 SOUTH FROM THE SR-271 (TAYLOR ROAD) INTERCHANGE TO THE SR-110 (CHANTILLY3 of 3$2,804,617+41%
30 JUN 2023202306300200601ROADWAY IMPROVEMENTS (RESURFACE, SIDEWALKS, LANDSCAPE) ON SOUTH MAIN STREET FROM THE JUNCTION OF SR-9 (US-231) TO THE JUNCTION OF EAST BRIDG3 of 3$1,647,213+25%
30 JUN 2023202306300210603PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-85 (OLD CARTER HILL/PIKE ROAD) FROM THE JUNCTION OF SR-6 (US-82) TO THE JUNCTION OF CR-83 (WA2 of 4$1,207,937+2.0%
26 MAY 2023202305260010601WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CHAPMAN ROAD FROM THE JUNCTION OF SR-143 TO COOSADA TOWN LIMITS (SITE 1) AND ON SR-143 TO CHAPM2 of 3$342,204+19%
26 MAY 2023202305260040603INTERSECTION IMPROVEMENTS (RESTRICTED CROSSING U-TURN) ON SR-9 (US-331) AT CR-61 (HOBBIE ROAD) SOUTHEAST OF HOPE HULL3 of 3$1,463,692+13%
26 MAY 2023202305260110601PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-6 FROM WEST 4TH STREET TO 0.800 MILE EAST OF SR-14; ON SR-6 FROM SR-3 TO I-651 of 3$5,978,754Low, 5.0% under the second
26 MAY 2023202305260140202MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 FROM THE JUNCTION OF PARRISH AVENUE TO A POINT 0.110 MILE NORTH OF THE JUNCTION OF C1 of 2$512,114Low, 4.0% under the second
26 MAY 2023202305260200604SAFETY WIDENING, PLANING, RESURFACING, GUARDRAIL, AND STRIPE ON SR-10 FROM THE JUNCTION OF BOLLING STREET IN GREENVILLE TO THE CRENSHAW COUN1 of 2$5,281,032Low, 16% under the second
28 APR 2023202304280040603INTERSECTION IMPROVEMENTS ON SR-53 (US-231) AT SR-6 (US-82) SOUTH OF MONTGOMERY1 of 2$1,443,238Low, 0.0% under the second
28 APR 2023202304280081008RESURFACING (MICRO-SURFACING SEAL COAT) AND TRAFFIC STRIPE ON I-22 FROM THE SR-118 UNDERPASS TO THE INDUSTRIAL PARKWAY UNDERPASS IN JASPER2 of 3$6,998,190+21%
28 APR 2023202304280090502MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-59 FROM 0.520 MILE WEST OF THE BUTTERMILK ROAD INTERCHANGE TO 1.200 MILES EAST OF THE SR1 of 2$3,315,588Low, 8.0% under the second
28 APR 2023202304280100301PAVEMENT REHABILITATION ON I-65 FROM THE SR-3 (US-31) INTERCHANGE TO A POINT 0.500 MILE SOUTH OF THE UNIVERSITY BOULEVARD INTERCHANGE1 of 3$13,899,510Low, 7.0% under the second
28 APR 2023202304280150305RESURFACING, GUARDRAIL SAFETY IMPROVEMENTS, & TRAFFIC STRIPE ON SR-38 (US-280) FROM THE JUNCTION OF NARROWS PARKWAY TO THE JUNCTION OF OLD H1 of 3$3,778,715Low, 3.0% under the second
28 APR 2023202304280160405MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-38 (US-280) FROM THE SHELBY COUNTY LINE TO THE JUNCTION OF CR-25 (MP 37.455)2 of 3$5,488,393+10%
07 APR 2023202304070180601RESURFACING WBL; RESURFACING AND WIDEN EBL; REPLACES BRIDGES ON SR-6 (US-82) FROM THE INTERSECTION OF SR-14 TO THE INTERSECTION OF SR-3 (US-4 of 4$11,520,726+9.0%
07 APR 2023202304070200301SAFETY WIDENING, RESURFACING, BRIDGE RAIL RETROFIT, & STRIPE ON SR-3 (US-31) FROM THE JUNCTION OF SNOW ROGERS ROAD TO THE JUNCTION OF THE HA1 of 4$4,842,706Low, 0.0% under the second
Midsouth Paving, Inc.: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way