ALDOT letting results, August 25, 2023

10 contracts let by Alabama DOT on August 25, 2023, $16,703,383 in low bids, a median of 2.5 bidders per contract.

Owner
Alabama DOT
Contracts
10
Low bids, total
$16,703,383
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20230825012RESURFACE (MICRO-SURFACING SEAL COAT, TYPE II & III), STRIPE ON I-59 FROM A POINT NORTH OF EXIT 1 (MP 1.690) TO A POINT SOUTH OF THE MCCAINVILLE ROAD OVERPASS (05062Wiregrass Construction Company, Inc.$6,377,249$6,705,508+5.0%ALDOT
20230825027TURN LANE ADDITIONS AND TRAFFIC SIGNAL IMPROVEMENTS ON SR-53 AT HARVEST ROAD AND ON SR-53 FROM THE INTERSECTION OF MCKEE ROAD TO THE INTERSECTION OF OLD RAILROA01024Rogers Group, Inc.$3,199,734$3,558,584+11%ALDOT
20230825028INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNAL) ON SR-7 (US-11) AT SR-174 AND CR-9 TO INCLUDE TURN LANE INSTALLATIONS AT ALL FOUR APPROACHES03024Chilton Contractors, Inc.$2,412,339$2,649,932+10%ALDOT
20230825001BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHABILITATION) ON SR-52 OVER THE CHATTAHOOCHEE RIVER07012American Contracting & Services, Inc.$1,314,578$1,314,8270.0%ALDOT
20230825029ROADWAY AND ACCESS MANAGEMENT IMPROVEMENTS ON SR-5 (US-78A) AT JONES DAIRY ROAD IN JASPER10082Dunn Construction Company, Inc.$1,033,729$1,234,580+19%ALDOT
20230825021PLANING, RESURFACING, AND TRAFFIC STRIPE ON DOSTER ROAD FROM FLEETWOOD ROAD TO SR-3 AND ON LOWER KINGSTON ROAD FROM 4TH STREET TO CR-8506013Wiregrass Construction Company, Inc.$932,573$970,958+4.0%ALDOT
20230825032MAINTENANCE BRIDGE PAINTING ON SR-54 OVER FLAT CREEK; ON SR-12 (US-84) WBR AND EBR OVER CLAYBANK CREEK; AND ON SR-10 OVER THE PEA RIVER0702, 0704,7Southern Coatings of Tarpon Springs, LLC$624,000$626,2550.0%ALDOT
20230825024PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON EULATION GATE ROAD AND OFF RAMP FROM A POINT NEAR THE ANNISTON ARMY DEPOT GATE TO BYNUM-LEATHERWOOD 04023Midsouth Paving, Inc.$434,791$438,581+1.0%ALDOT
20230825007WIDENING, RESURFACING, AND TRAFFIC STRIPE ON MOSLEY BRIDGE ROAD FROM THE JUNCTION OF SR-17 TO THE INTERSECTION OF BARRYTOWN ROAD SOUTH OF GILBERTOWN08041H. O. Weaver & Sons, Inc.$280,713ALDOT
20230825008GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATIONS ON CR-2 OVER AN UNNAMED BRANCH WEST OF YORK05062C & H Construction Services, LLC$93,677$118,935+27%ALDOT
ALDOT contracts let on August 25, 2023, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy