Asphalt Contractors, Inc.: ALDOT bid record
Asphalt Contractors, Inc. submitted 68 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 26 JUN 2026, and was the low bidder on 38 of them (56%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $81,279,281
- Latest bid
- 26 JUN 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 11 | 4 | 36% |
| 2023 | 19 | 9 | 47% |
| 2024 | 14 | 12 | 86% |
| 2025 | 13 | 8 | 62% |
| 2026 | 11 | 5 | 45% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0601 | 27 | 15 | 56% |
| 0603 | 18 | 6 | 33% |
| 0605 | 5 | 4 | 80% |
| 0803 | 5 | 5 | 100% |
| 0505 | 2 | 2 | 100% |
| 06 | 2 | 1 | 50% |
| 0802 | 2 | 1 | 50% |
| 0602 | 2 | 1 | 50% |
| 0401 | 1 | 0 | 0% |
| 0604, 0605 | 1 | 1 | 100% |
| 08 | 1 | 1 | 100% |
| 0804 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Solid temporary traffic stripe | 701C001 | MI | 61 | 51 (84%) | $900.00 | $1,064.57 |
| Pavement markers, class A-H, type 2-D | 705A037 | EACH | 61 | 50 (82%) | $5.50 | $6.05 |
| Traffic control markings, class 2, type A | 703A002 | SF | 58 | 46 (79%) | $5.50 | $6.00 |
| Broken temporary traffic stripe | 701C000 | MI | 57 | 45 (79%) | $900.00 | $1,000.00 |
| Temporary traffic control markings | 703D001 | SF | 49 | 40 (82%) | $2.00 | $2.35 |
| Pavement markers, class A-H, type 1-B | 705A032 | EACH | 46 | 40 (87%) | $5.25 | $5.85 |
| Tack coat | 405A000 | GAL | 63 | 38 (60%) | $3.25 | $4.55 |
| Traffic control legends, class 2, type A | 703B002 | SF | 42 | 32 (76%) | $6.00 | $6.53 |
| Pavement markers, class A-H, type 2-C | 705A030 | EACH | 37 | 32 (86%) | $5.25 | $6.00 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 36 | 27 (75%) | $3,850.00 | $4,427.98 |
| Scoring bituminous pavement surface | 428A001 | MI | 30 | 27 (90%) | $270.00 | $486.51 |
| Solid yellow, class 2, type A traffic stripe (5" wide) | 701A230 | MI | 33 | 26 (79%) | $3,825.00 | $4,432.31 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 58 | 24 of 58 |
| Apac-Alabama, Inc. | 32 | 10 of 32 |
| Midsouth Paving, Inc. | 20 | 7 of 20 |
| Dubose Construction Company, LLC | 7 | 1 of 7 |
| Mobile Asphalt Company, LLC | 4 | 0 of 4 |
| H. O. Weaver & Sons, Inc. | 4 | 1 of 4 |
| McElhenney Construction Co., LLC | 3 | 1 of 3 |
| Gillespie Construction, LLC | 2 | 1 of 2 |
| Gary Ingram Grading & Paving, Inc. | 1 | 1 of 1 |
| S. T. Bunn Construction Company, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 JUN 2026 | 20260626027 | 0601 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON GARDNER ROAD FROM THE JUNCTION OF CR-59 (UPPER KINGSTON ROAD) TO THE JUNCTION OF CR-23 (MARTIN | 1 of 3 | $480,814 | Low, 1.0% under the second |
| 26 JUN 2026 | 20260626028 | 0603 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON (CR-107) MARLER ROAD FROM THE JUNCTION OF SR-110 TO THE SR-8 (US-80) INTERCHANGE | 2 of 3 | $1,225,588 | +2.0% |
| 26 JUN 2026 | 20260626029 | 0601 | ROADWAY AND SAFETY IMPROVEMENTS (PLANING, RESURFACING, SIDEWALK INSTALLATION, AND TRAFFIC STRIPE) ON WEST TALLASSEE STREET FROM THE JUNCTION | 2 of 5 | $1,139,964 | +5.0% |
| 24 APR 2026 | 20260424010 | 0803 | RESURFACING AND TRAFFIC STRIPE ON SR-5 FROM THE JUNCTION OF CHURCH STREET TO THE JUNCTION OF SANDPIT ROAD IN PINE HILL | 1 of 3 | $1,231,599 | Low, 16% under the second |
| 24 APR 2026 | 20260424038 | 0601 | PLANING, RESURFACING, AND TRAFFIC STRIPING ON CR-259 (HOGAN RD) FROM CR-143 TO SR-111 (SITE 1) AND CR-228 (CRENSHAW RD) FROM SR-111 TO CR-08 | 2 of 3 | $1,153,733 | +6.0% |
| 27 MAR 2026 | 20260327022 | 0603 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-97 FROM THE CRENSHAW COUNTY LINE TO THE JUNCTION OF SR-3 (US-31) | 3 of 3 | $912,701 | +12% |
| 27 FEB 2026 | 20260227020 | 0601 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-21 (US-231) FROM A POINT 0.280 MILE SOUTH OF THE JUNCTION OF JONES ROAD TO THE COOSA COUNTY L | 3 of 3 | $2,928,682 | +9.0% |
| 27 FEB 2026 | 20260227042 | 0603 | PLANING, RESURFACING, AND TRAFIC STRIPE ON CR-22 (TROTMAN ROAD) FROM THE JUNCTION OF CR-39 (WOODLEY ROAD) TO THE JUNCTION OF SR-6 (US-82/US- | 3 of 3 | $615,102 | +21% |
| 30 JAN 2026 | 20260130028 | 0603 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-8 (US-80) FROM THE JUNCTION OF FELDER ROAD TO THE I- 65 INTERCHANGE IN MONTGO | 1 of 3 | $4,453,665 | Low, 8.0% under the second |
| 30 JAN 2026 | 20260130040 | 0602 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE BEGINNING OF THE 4-LANE UNDIVIDED SECTION TO THE END OF THE 4-LANE DIVIDED | 1 of 4 | $7,244,679 | Low, 8.0% under the second |
| 30 JAN 2026 | 20260130056 | 0605 | 0041(529) SAFETY WIDENING, RESURFACING (MICRO-SURFACING SEAL COAT, TYPE II & III), AND TRAFFIC STRIPE ON SR-41 FROM THE JUNCTION OF SR-89 TO | 1 of 2 | $3,913,445 | Low, 13% under the second |
| 07 NOV 2025 | 20251107012 | 0601 | ROADWAY IMPROVEMENTS (ACCESS MANAGEMENT) ON SR-9 (US-231) FROM THE INTERSECTION OF CHARLES AVENUE TO THE JUNCTION OF MAIN STREET IN WETUMPKA | 5 of 5 | $1,460,064 | +27% |
| 07 NOV 2025 | 20251107049 | 0505 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-219 FROM THE DALLAS COUNTY LINE TO A POINT 0.300 MILE NORTH OF THE JUNCTION OF CR-32 | 1 of 1 | $1,790,995 | Low |
| 26 SEP 2025 | 20250926029 | 0601 | RESURFACING AND TRAFFIC STRIPE ON CR-81 FROM THE JUNCTION OF CR-10 TO THE JUNCTION OF CR-6 NORTHWEST OF PRATTVILLE | 2 of 3 | $464,136 | +1.0% |
| 26 SEP 2025 | 20250926030 | 0601 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-74 (FITZPATRICK ROAD) FROM THE JUNCTION OF SR-143 TO THE JUNCTION OF SR-14 | 1 of 3 | $352,461 | Low, 15% under the second |
| 27 JUN 2025 | 20250627012 | 0605 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND STRIPE ON SR-8 (US-80) FROM THE EDMUND PETTIS BRIDGE (MP 85.409) IN SELMA TO A POINT 0.300 | 1 of 2 | $5,436,361 | Low, 29% under the second |
| 30 MAY 2025 | 20250530027 | 0803 | RESURFACE, GUARDRAIL INSTALL, CENTERLINE SCORING, AND STRIPE ON SR-10 FROM THE JUNCTION OF SR-41 TO A POINT 0.750 MILE EAST OF THE JUNCTION | 1 of 3 | $2,854,374 | Low, 2.0% under the second |
| 25 APR 2025 | 20250425038 | 0601 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON ROSE HILL RD FROM GRANDVIEW RD TO CR-23 AND ON AIRPORT RD FROM CR-23 TO SR-14 | 1 of 3 | $712,479 | Low, 6.0% under the second |
| 25 APR 2025 | 20250425039 | 0603 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-83 (WALLAHATCHIE ROAD) FROM THE JUNCTION OF CR-85 (PIKE ROAD) TO THE JUNCTION OF SR-110 IN PI | 3 of 4 | $904,930 | +4.0% |
| 28 FEB 2025 | 20250228010 | 0601 | SAFETY WIDENING, RESURFACING, SCORING, AND TRAFFIC STRIPE ON CR-68 FROM THE JUNCTION OF CR-57 TO THE JUNCTION OF SR-3 (US-31) NORTHWEST OF P | 1 of 3 | $569,533 | Low, 1.0% under the second |
| 28 FEB 2025 | 20250228031 | 0603 | RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND TRAFFIC STRIPE ON SR-8 (US-80) FROM THE JUNCTION OF SR-126 IN WAUGH TO THE MACON COUNTY LINE | 1 of 3 | $1,832,889 | Low, 0.0% under the second |
| 28 FEB 2025 | 20250228037 | 0603 | PLANING, WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-103 (FELDER ROAD) FROM THE JUNCTION OF CR-15 (WASDEN ROAD) TO THE JUNCTION OF SR-8 | 2 of 3 | $784,610 | +7.0% |
| 31 JAN 2025 | 20250131040 | 0604 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE PINEY CREEK WOODS BRIDGE TO A POINT 0.500 MILE SOUTH OF THE JUNCTION OF JU | 2 of 3 | $4,347,788 | +1.0% |
| 31 JAN 2025 | 20250131051 | 0601 | RESURFACING AND TRAFFIC STRIPE ON CR-23 (LIGHTWOOD ROAD) FROM THE JUNCTION OF SR-111 TO THE JUNCTION OF LAKE HAVEN DRIVE | 1 of 3 | $521,134 | Low, 20% under the second |
| 06 DEC 2024 | 20241206015 | 0601 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-3 (US-31) FROM A POINT NORTH OF THE ALABAMA RIVER BRIDGE (MP 186.300) TO THE | 1 of 3 | $3,939,446 | Low, 1.0% under the second |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.