ALDOT contract 20251107012 bid tabulation
ROADWAY IMPROVEMENTS (ACCESS MANAGEMENT) ON SR-9 (US-231) FROM THE INTERSECTION OF CHARLES AVENUE TO THE JUNCTION OF MAIN STREET IN WETUMPKA. Let by Alabama DOT on November 7, 2025, Elmore, 0601. 5 bids received; low bid $1,151,403 by Wiregrass Construction Company, Inc..
- Owner
- Alabama DOT
- Letting
- 07 NOV 2025
- Pay items
- 63
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wiregrass Construction Company, Inc. | $1,151,403 | Low |
| 2 | Apac-Alabama, Inc. | $1,173,042 | +2.0% |
| 3 | McElhenney Construction Co., LLC | $1,251,634 | +9.0% |
| 4 | Gillespie Construction, LLC | $1,252,073 | +9.0% |
| 5 | Asphalt Contractors, Inc. | $1,460,064 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wiregrass Construction Company, Inc. | 2. Apac-Alabama, Inc. | 3. McElhenney Construction Co., LLC | 4. Gillespie Construction, LLC | 5. Asphalt Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0010 | Removing concrete slope paving (206C002) | SY | 96 | $185.84 | $450.00 | $82.98 | $125.00 | $125.00 |
| 0020 | Removing curb and gutter (206D003) | LF | 54 | $82.62 | $156.24 | $33.08 | $50.00 | $100.00 |
| 0030 | Removing trees (206E006) | EACH | 1 | $4,211.37 | $154.90 | $2,258.46 | $6,500.00 | $12,500 |
| 0040 | Mailbox reset, single (209A000) | EACH | 1 | $375.72 | $774.44 | $887.24 | $3,500.00 | $500.00 |
| 0050 | Unclassified excavation (210A000) | CY | 586 | $83.75 | $92.50 | $62.53 | $80.00 | $70.00 |
| 0060 | Borrow excavation (loose truckbed measurement)(A4 or better) (210D021) | CY | 200 | $85.17 | $71.84 | $48.13 | $65.00 | $80.00 |
| 0070 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 450 | $107.82 | $133.43 | $78.20 | $95.00 | $175.00 |
| 0080 | Bituminous treatment A (401A000) | SY | 1,851 | $1.15 | $0.01 | $1.86 | $1.50 | $5.00 |
| 0090 | Tack coat (405A000) | GAL | 371 | $39.03 | $0.01 | $8.70 | $43.00 | $5.00 |
| 0100 | Planing existing pavement (approximately 0.00" thru 1.0" thick) (408A051) | SY | 702 | $25.47 | $18.16 | $43.63 | $28.00 | $45.00 |
| 0110 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range E (424A280) | TON | 143 | $295.35 | $259.77 | $259.18 | $325.00 | $300.00 |
| 0120 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range E (424B280) | TON | 216 | $214.37 | $185.94 | $234.33 | $236.00 | $295.00 |
| 0130 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range E (424B581) | TON | 777 | $177.50 | $145.23 | $208.13 | $195.25 | $285.00 |
| 0140 | Mobilization (600A000) | LS | 1 | $135,000 | $117,240 | $305,355 | $110,000 | $275,500 |
| 0150 | Filter blanket, geotextile (610D003) | SY | 300 | $3.32 | $9.29 | $4.82 | $10.00 | $7.20 |
| 0160 | Slope paving (614A000) | CY | 205 | $779.87 | $1,200.00 | $994.26 | $1,850.00 | $750.00 |
| 0170 | Concrete sidewalk, 4" thick (618A000) | SY | 24 | $129.98 | $138.76 | $124.28 | $200.00 | $125.00 |
| 0180 | Combination curb & gutter, type C (623C000) | LF | 87 | $77.99 | $64.54 | $74.57 | $125.00 | $75.00 |
| 0190 | Topsoil (650A000) | CY | 100 | $108.18 | $83.90 | $46.33 | $40.00 | $65.00 |
| 0200 | Solid sodding (bermuda) (654A001) | SY | 500 | $9.96 | $23.23 | $8.09 | $15.00 | $18.00 |
| 0210 | Temporary seeding (665A000) | ACRE | 1 | $1,797.58 | $735.74 | $1,475.23 | $1,000.00 | $570.00 |
| 0220 | Temporary mulching (665B001) | TON | 3 | $1,603.99 | $697.01 | $1,285.62 | $500.00 | $540.00 |
| 0230 | Polyethylene (665E000) | SY | 500 | $3.97 | $6.20 | $4.94 | $2.00 | $4.80 |
| 0240 | Sand bags (665G000) | EACH | 250 | $8.57 | $15.49 | $18.19 | $10.00 | $12.00 |
| 0250 | Silt fence (665J002) | LF | 700 | $2.87 | $9.29 | $6.26 | $8.00 | $7.20 |
| 0260 | Silt fence removal (665O001) | LF | 700 | $1.16 | $1.55 | $3.30 | $2.00 | $1.20 |
| 0270 | Wattle (665Q002) | LF | 200 | $12.22 | $15.49 | $12.67 | $15.00 | $12.00 |
| 0280 | Geometric controls (680A001) | LS | 1 | $25,000 | $12,130 | $79,927 | $55,000 | $200,000 |
| 0290 | Construction fuel (maximum bid limited to $ 50,000.00) (698A000) | LS | 1 | $50,000 | $0.00 | $0.00 | $0.00 | $50,000 |
| 0300 | Solid white, class 2, type A traffic stripe (701A231) | MI | 1 | $4,977.90 | $5,808.42 | $5,592.72 | $4,950.00 | $4,500.00 |
| 0310 | Solid yellow, class 2, type A traffic stripe (701A235) | MI | 1 | $4,977.90 | $5,808.42 | $5,592.72 | $4,950.00 | $4,500.00 |
| 0320 | Dotted, class 2, type A, traffic stripe (701B205) | LF | 2,039 | $2.21 | $2.58 | $2.49 | $2.25 | $2.00 |
| 0330 | Solid traffic stripe removed (paint) (701D007) | MI | 1 | $110.62 | $129.08 | $124.28 | $110.00 | $100.00 |
| 0340 | Solid traffic stripe removed (plastic) (701D008) | MI | 2 | $2,765.50 | $3,226.90 | $3,107.07 | $2,750.00 | $2,500.00 |
| 0350 | Broken traffic stripe removed (paint) (701D014) | MI | 1 | $110.62 | $129.08 | $124.28 | $110.00 | $100.00 |
| 0360 | Broken traffic stripe removed (plastic) (701D015) | MI | 1 | $2,488.95 | $2,904.21 | $2,796.36 | $2,475.00 | $2,250.00 |
| 0370 | Solid temporary traffic stripe (701E000) | LF | 1,000 | $1.11 | $1.29 | $1.24 | $1.10 | $1.00 |
| 0380 | Broken white, class 2, type A traffic stripe (701G240) | LF | 400 | $1.66 | $1.94 | $1.86 | $1.65 | $1.50 |
| 0390 | Solid white, class 2, type A traffic stripe (5" wide) (rumble strip) (701G252) | LF | 240 | $8.30 | $9.68 | $9.32 | $8.25 | $7.50 |
| 0400 | Dotted traffic stripe removed (plastic) (701H011) | LF | 2,105 | $0.55 | $0.65 | $0.62 | $0.60 | $0.50 |
| 0410 | Traffic control markings, class 2, type A (703A002) | SF | 1,478 | $5.53 | $6.45 | $6.21 | $5.50 | $5.00 |
| 0420 | Traffic control legends, class 2, type A (703B002) | SF | 462 | $6.08 | $7.10 | $6.84 | $6.05 | $5.50 |
| 0430 | Removal of existing traffic control markings or legends (plastic) (703C001) | SF | 5,570 | $3.32 | $3.87 | $3.73 | $3.30 | $3.00 |
| 0440 | Temporary traffic control markings (703D001) | SF | 400 | $2.21 | $2.58 | $2.49 | $2.20 | $2.00 |
| 0450 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 412 | $8.85 | $10.33 | $9.94 | $8.80 | $8.00 |
| 0460 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 19 | $8.85 | $10.33 | $9.94 | $8.80 | $8.00 |
| 0470 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 212 | $8.85 | $10.33 | $9.94 | $8.80 | $8.00 |
| 0480 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 35 | $29.31 | $38.72 | $32.94 | $35.00 | $22.00 |
| 0490 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 98 | $20.46 | $20.65 | $22.99 | $30.00 | $19.00 |
| 0500 | Removal of existing traffic control unit (partial) ( SR-9 (US-231) at charles avenue) (730A012) | LS | 1 | $7,500.00 | $1,903.87 | $1,833.17 | $1,625.00 | $1,475.00 |
| 0510 | Removal of existing traffic control unit (partial) ( SR-9 (US-231) at south main street and breezehill boulevard) (730A013) | LS | 1 | $7,500.00 | $1,748.98 | $1,684.03 | $1,500.00 | $1,355.00 |
| 0520 | Furnishing and installing traffic control unit ( SR-9 (US-231) at charles avenue) (730C000) | LS | 1 | $22,500 | $15,000 | $9,140.99 | $8,090.00 | $7,355.00 |
| 0530 | Furnishing and installing traffic control unit ( SR-9 (US-231) at river oaks boulevard and old montgomery highway) (730C001) | LS | 1 | $22,500 | $15,000 | $5,437.37 | $4,813.00 | $4,375.00 |
| 0540 | Furnishing and installing traffic control unit ( SR-9 (US-231) at south main street and breezehill boulevard) (730C002) | LS | 1 | $22,500 | $15,000 | $4,971.31 | $4,400.00 | $4,000.00 |
| 0550 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 3 | $2,500.00 | $5,000.00 | $1,988.52 | $1,760.00 | $1,600.00 |
| 0560 | Radar detection system ( SR-9 (US- 231) at charles avenue) (730U400) | LS | 1 | $68,000 | $80,000 | $57,170 | $50,600 | $46,000 |
| 0570 | Radar detection system ( SR-9 (US- 231) at south main street and breezehill boulevard) (730U401) | LS | 1 | $68,000 | $80,000 | $57,170 | $50,600 | $46,000 |
| 0580 | Construction signs (740B000) | SF | 791 | $6.36 | $7.42 | $7.15 | $20.00 | $6.00 |
| 0590 | Channelizing drums (740D000) | EACH | 250 | $38.00 | $24.52 | $23.61 | $50.00 | $24.00 |
| 0600 | Cones (36 inches high) (740E000) | EACH | 100 | $19.89 | $83.90 | $33.56 | $50.00 | $21.00 |
| 0610 | Barricades, type III (740F002) | EACH | 6 | $189.60 | $104.55 | $100.67 | $300.00 | $210.00 |
| 0620 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $5,500.00 | $4,500.00 | $1,180.69 | $2,475.00 | $1,620.00 |
| 0630 | Portable changeable message sign, type 3 (742A003) | EACH | 2 | $7,500.00 | $15,000 | $2,050.67 | $6,050.00 | $3,960.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.