S J & L General Contractor, LLC: ALDOT bid record
S J & L General Contractor, LLC submitted 10 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 08 DEC 2023, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $8,728,352
- Latest bid
- 08 DEC 2023
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 2 | 40% |
| 2023 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0102 | 8 | 0 | 0% |
| 0204 | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Wattle | 665Q002 | LF | 10 | 5 (50%) | $6.06 | $10.75 |
| Temporary mulching | 665B001 | TON | 6 | 4 (67%) | $474.38 | $545.62 |
| Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) | 710B021 | LF | 6 | 4 (67%) | $15.27 | $20.21 |
| Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D | 424B655 | TON | 5 | 4 (80%) | $134.49 | $175.00 |
| Filter blanket, geotextile | 610D003 | SY | 7 | 3 (43%) | $3.82 | $5.47 |
| Unclassified excavation | 210A000 | CY | 6 | 3 (50%) | $21.69 | $32.97 |
| Removing pipe | 206D000 | LF | 6 | 3 (50%) | $20.46 | $31.83 |
| Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D | 424B681 | TON | 5 | 3 (60%) | $104.40 | $127.00 |
| Curb ramp | 618D000 | SY | 5 | 3 (60%) | $121.53 | $299.60 |
| Construction signs | 740B000 | SF | 10 | 2 (20%) | $7.87 | $7.00 |
| Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D | 424A360 | TON | 7 | 2 (29%) | $121.23 | $120.00 |
| Scoring bituminous pavement surface | 428A001 | MI | 6 | 2 (33%) | $811.62 | $486.51 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 10 | 6 of 10 |
| Rogers Group, Inc. | 9 | 6 of 9 |
| Midsouth Paving, Inc. | 3 | 1 of 3 |
| Grayson Carter & Son Contracting, Inc. | 3 | 1 of 3 |
| Gregory Construction Services, Inc. | 1 | 0 of 1 |
| Cornerstone Civil Contractors, LLC | 1 | 0 of 1 |
| MLMD, LLC | 1 | 0 of 1 |
| Whitaker Contracting Corporation | 1 | 1 of 1 |
| Apac-Alabama, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 DEC 2023 | 20231208015 | 0102 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-231/US-431) FROM THE JUNCTION OF WALKER LANE IN HAZEL GREEN TO THE TENNESSEE STAT | 4 of 5 | $3,911,663 | +9.0% |
| 29 SEP 2023 | 20230929006 | 0102 | ADDITIONAL LANES (GRADE, DRAIN PAVE, BRIDGE, SIGNALS) ON JAMES RECORD RD/CR-11 MARTIN RD FROM THE JUNCTION OF LARCY DR TO THE JUNCTION OF CR | 5 of 5 | $22,533,333 | +19% |
| 25 AUG 2023 | 20230825027 | 0102 | TURN LANE ADDITIONS AND TRAFFIC SIGNAL IMPROVEMENTS ON SR-53 AT HARVEST ROAD AND ON SR-53 FROM THE INTERSECTION OF MCKEE ROAD TO THE INTERSE | 2 of 4 | $3,558,584 | +11% |
| 07 APR 2023 | 20230407008 | 0102 | ADDITIONAL LANES ON SR-1 FROM 0.310 MILE SOUTH OF CR-75 TO CR-65 TO INCLUDE THE CR-75 OVERPASS AND ACCESS IMPROVEMENTS TO CR-65 | 3 of 3 | $42,458,621 | +26% |
| 24 FEB 2023 | 20230224024 | 0102 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (U.S. 231/431) FROM THE JUNCTION OF CEDARAMA DRIVE NORTHWEST TO THE JUNCTION OF GRIMW | 2 of 4 | $4,606,919 | 0.0% |
| 26 AUG 2022 | 20220826014 | 0204 | WELCOME CENTER REPLACEMENT (SITE CONSTRUCTION) ON I-65 NORTH OF ATHENS | 1 of 3 | $6,612,039 | Low, 18% under the second |
| 24 JUN 2022 | 20220624032 | 0204 | ADDING/EXTENDING LEFT AND RIGHT TURN LANES ON SR-2 (US-72) AT MOORESVILLE ROAD IN ATHENS | 1 of 5 | $2,116,312 | Low, 24% under the second |
| 25 MAR 2022 | 20220325011 | 0102 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON I-565 FROM 0.260 MILE EAST OF THE TRIANA BOULEVARD OVERPASS TO 0.450 MILE EAST OF THE SR-2 (US-7 | 4 of 4 | $7,604,991 | +41% |
| 25 FEB 2022 | 20220225061 | 0102 | WIDENING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS SITES AS INDICATED IN THE PLANS | 2 of 3 | $1,275,167 | +2.0% |
| 28 JAN 2022 | 20220128021 | 0102 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) IN MADISON FROM THE JUNCTION OF COUNTY LINE ROAD TO THE JUNCTION OF PERIMETER | 2 of 4 | $5,274,944 | +12% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.