S J & L General Contractor, LLC: ALDOT bid record

S J & L General Contractor, LLC submitted 10 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 08 DEC 2023, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +12% above the low bid.

Owner
Alabama DOT
Low bid volume
$8,728,352
Latest bid
08 DEC 2023
Data through
28 AUG 2026
10Bids
2Low bids
20Win rate, percent
+12%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
20225240%
2023500%
S J & L General Contractor, LLC, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
0102800%
020422100%
S J & L General Contractor, LLC, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Wattle665Q002LF105 (50%)$6.06$10.75
Temporary mulching665B001TON64 (67%)$474.38$545.62
Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel)710B021LF64 (67%)$15.27$20.21
Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D424B655TON54 (80%)$134.49$175.00
Filter blanket, geotextile610D003SY73 (43%)$3.82$5.47
Unclassified excavation210A000CY63 (50%)$21.69$32.97
Removing pipe206D000LF63 (50%)$20.46$31.83
Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D424B681TON53 (60%)$104.40$127.00
Curb ramp618D000SY53 (60%)$121.53$299.60
Construction signs740B000SF102 (20%)$7.87$7.00
Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D424A360TON72 (29%)$121.23$120.00
Scoring bituminous pavement surface428A001MI62 (33%)$811.62$486.51
S J & L General Contractor, LLC, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Wiregrass Construction Company, Inc.106 of 10
Rogers Group, Inc.96 of 9
Midsouth Paving, Inc.31 of 3
Grayson Carter & Son Contracting, Inc.31 of 3
Gregory Construction Services, Inc.10 of 1
Cornerstone Civil Contractors, LLC10 of 1
MLMD, LLC10 of 1
Whitaker Contracting Corporation11 of 1
Apac-Alabama, Inc.11 of 1
S J & L General Contractor, LLC, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
08 DEC 2023202312080150102MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-231/US-431) FROM THE JUNCTION OF WALKER LANE IN HAZEL GREEN TO THE TENNESSEE STAT4 of 5$3,911,663+9.0%
29 SEP 2023202309290060102ADDITIONAL LANES (GRADE, DRAIN PAVE, BRIDGE, SIGNALS) ON JAMES RECORD RD/CR-11 MARTIN RD FROM THE JUNCTION OF LARCY DR TO THE JUNCTION OF CR5 of 5$22,533,333+19%
25 AUG 2023202308250270102TURN LANE ADDITIONS AND TRAFFIC SIGNAL IMPROVEMENTS ON SR-53 AT HARVEST ROAD AND ON SR-53 FROM THE INTERSECTION OF MCKEE ROAD TO THE INTERSE2 of 4$3,558,584+11%
07 APR 2023202304070080102ADDITIONAL LANES ON SR-1 FROM 0.310 MILE SOUTH OF CR-75 TO CR-65 TO INCLUDE THE CR-75 OVERPASS AND ACCESS IMPROVEMENTS TO CR-653 of 3$42,458,621+26%
24 FEB 2023202302240240102MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (U.S. 231/431) FROM THE JUNCTION OF CEDARAMA DRIVE NORTHWEST TO THE JUNCTION OF GRIMW2 of 4$4,606,9190.0%
26 AUG 2022202208260140204WELCOME CENTER REPLACEMENT (SITE CONSTRUCTION) ON I-65 NORTH OF ATHENS1 of 3$6,612,039Low, 18% under the second
24 JUN 2022202206240320204ADDING/EXTENDING LEFT AND RIGHT TURN LANES ON SR-2 (US-72) AT MOORESVILLE ROAD IN ATHENS1 of 5$2,116,312Low, 24% under the second
25 MAR 2022202203250110102PLANING, RESURFACING, AND TRAFFIC STRIPE ON I-565 FROM 0.260 MILE EAST OF THE TRIANA BOULEVARD OVERPASS TO 0.450 MILE EAST OF THE SR-2 (US-74 of 4$7,604,991+41%
25 FEB 2022202202250610102WIDENING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON VARIOUS ROUTES AT VARIOUS SITES AS INDICATED IN THE PLANS2 of 3$1,275,167+2.0%
28 JAN 2022202201280210102MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-2 (US-72) IN MADISON FROM THE JUNCTION OF COUNTY LINE ROAD TO THE JUNCTION OF PERIMETER2 of 4$5,274,944+12%
S J & L General Contractor, LLC: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way