ALDOT letting results, February 24, 2023
25 contracts let by Alabama DOT on February 24, 2023, $99,924,953 in low bids, a median of 2 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 25
- Low bids, total
- $99,924,953
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20230224001 | ADDITIONAL LANES (GRADE, DRAIN, PAVE, SIGNALS, AND STRIPE) ON SR-2 (US 72/FLORENCE BOULEVARD) FROM THE JUNCTION OF CR-30 (INDIAN SPRINGS DRIVE) TO THE JUNCTION | 0201 | 3 | Grayson Carter & Son Contracting, Inc. | $23,959,358 | $28,803,149 | +20% | ALDOT |
| 20230224019 | WELCOME CENTER REPLACEMENT (BUILDING ONLY) ON I-65 NORTH OF ATHENS | 0204 | 3 | Consolidated Construction Co. of Ala. | $7,963,000 | $8,429,000 | +6.0% | ALDOT |
| 20230224040 | MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, AND STRIPE ON SR-40 FROM THE INTERSECTION OF SR-71 NORTHEAST OF DUTTON TO THE JUNCTION OF SR-117 IN HAMMONDVIL | 0103 | 3 | Wiregrass Construction Company, Inc. | $6,134,850 | $6,147,323 | 0.0% | ALDOT |
| 20230224044 | SAFETY WIDENING, RESURFACING, BRIDGE RAIL RETROFIT, & STRIPE ON SR-18 (US-43) FROM 0.260 MILE EAST OF THE JUNCTION OF 6TH AVENUE SOUTHEAST IN FAYETTE TO THE JUN | 1001 | 1 | S. T. Bunn Construction Company, Inc. | $4,898,610 | ALDOT | ||
| 20230224027 | RESURFACING, BRIDGE GUARDRAIL RETROFIT, AND TRAFFIC STRIPE ON SR-152 FROM THE I-65 INTERCHANGE TO THE SR-9 (US-231) INTERCHANGE | 06 | 3 | Asphalt Contractors, Inc. | $4,730,720 | $4,795,169 | +1.0% | ALDOT |
| 20230224037 | SAFETY WIDENING, MICRO-MILLING, RESURFACE, & STRIPE ON SR-10 FROM A POINT JUST EAST OF VANN MILL CREEK (MP 218.583) IN ABBEVILLE TO THE GEORGIA STATE LINE | 0706 | 2 | Midsouth Paving, Inc. | $4,697,525 | $5,049,778 | +7.0% | ALDOT |
| 20230224008 | BRIDGE DECK REPAIR (HYDROBLASTING AND DECK REHAB) ON I-20/I-59 (NORTHBOUND ROADWAY) FROM MP 63.721 TO MP 72.064 | 0502 | 3 | Comanche Construction of Georgia, LLC | $4,599,583 | $5,150,396 | +12% | ALDOT |
| 20230224024 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (U.S. 231/431) FROM THE JUNCTION OF CEDARAMA DRIVE NORTHWEST TO THE JUNCTION OF GRIMWOOD ROAD/WALKER LANE | 0102 | 4 | Rogers Group, Inc. | $4,587,238 | $4,606,919 | 0.0% | ALDOT |
| 20230224029 | MICRO-MILL, RESURFACING, BRIDGE GUARDRAIL RETRO, AND STRIPE ON SR-1 (US-431) FROM THE JUNCTION OF SR-144 TO A POINT 0.280 MILE SOUTH OF THE JUNCTION OF SR-204 ( | 0402 | 3 | Vulcan Materials Asphalt and Construction, | $4,523,379 | $4,751,170 | +5.0% | ALDOT |
| 20230224020 | MICRO-MILLING, OGFC SAFETY TREATMENT, AND TRAFFIC STRIPE ON I-459 FROM THE GRANTS MILL ROAD OVERPASS TO A POINT 0.270 MILE SOUTH OF THE SR-7 (US-11) INTERCHANGE | 0301 | 3 | Wiregrass Construction Company, Inc. | $4,186,069 | $4,278,226 | +2.0% | ALDOT |
| 20230224014 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-8 (US-80) FROM 0.700 MILE WEST OF THE JUNCTION OF STREETY ROAD TO 0.500 MILE EAST THE JUNCTION OF SR-97 | 0604, 0605 | 3 | Asphalt Contractors, Inc. | $3,538,963 | $3,794,926 | +7.0% | ALDOT |
| 20230224052 | RESURFACING AND TRAFFIC STRIPE ON SR-51 FROM THE JUNCTION OF SR-239 TO THE BULLOCK COUNTY LINE | 0706 | 2 | Wiregrass Construction Company, Inc. | $3,234,051 | $3,263,809 | +1.0% | ALDOT |
| 20230224018 | OGFC SURFACE TREATMENT AND MICRO-SURFACING ON I-65 FROM THE SR-3 (US-31) OVERPASS TO THE SR-145 OVERPASS IN CLANTON | 0504 | 2 | Dunn Construction Company, Inc. | $3,139,754 | $3,394,776 | +8.0% | ALDOT |
| 20230224051 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-6 (US-82) FROM THE BULLOCK COUNTY LINE TO THE JUNCTION OF POPLAR SPRINGS ROAD NORTHWEST OF EUFAULA | 0706 | 2 | Midsouth Paving, Inc. | $2,915,654 | $3,601,278 | +24% | ALDOT |
| 20230224045 | SAFETY WIDENING, RESURFACING (SCRUB SEAL), GUARDRAIL, STRIPE ON SR-86 FROM 0.320 MILE EAST OF THE JUNCTION OF OLD CARROLLTON ROAD TO THE JUNCTION OF LADOW CENTE | 1003 | 1 | S. T. Bunn Construction Company, Inc. | $2,840,243 | ALDOT | ||
| 20230224058 | STREETSCAPE IMPROVEMENTS 2ND AVENUE SOUTH; ON 27TH STREET SOUTH; AND ON 29TH STREET SOUTH IN BIRMINGHAM | 0301 | 5 | Taylor & Miree Construction, Inc | $2,591,758 | $3,245,537 | +25% | ALDOT |
| 20230224053 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON CR-636 FROM THE JUNCTION OF SR-87 TO THE JUNCTION OF SR-27 SOUTH OF ENTERPRISE | 0701 | 2 | Wiregrass Construction Company, Inc. | $1,798,406 | $1,930,963 | +7.0% | ALDOT |
| 20230224041 | RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON SR-136 FROM THE JUNCTION OF SR-21 SOUTHWEST OF MONROEVILLE TO THE JUNCTION OF SR-12 (US-84) | 0803 | 2 | Mobile Asphalt Company, LLC | $1,789,754 | $1,850,101 | +3.0% | ALDOT |
| 20230224004 | ROADWAY IMPROVEMENTS (CENTER TURN LANE ADDITION) ON SR-13 (US-43) FROM THE JUNCTION OF GAIL DRIVE TO THE JUNCTION OF TODDTOWN ROAD SOUTHWEST OF GROVE HILL | 0804 | 2 | Pine City Contracting, LLC | $1,715,179 | $2,040,785 | +19% | ALDOT |
| 20230224055 | RESURFACING, AND STRIPE TO INCLUDE TRAFFIC SIGNAL UPGRADES ON SR-21 FROM SR-41 TO SR-47 AND ON SR-47 FROM SR-41 TO SR-21 IN MONROEVILLE | 0803 | 2 | Mobile Asphalt Company, LLC | $1,710,515 | $1,754,432 | +3.0% | ALDOT |
| 20230224025 | PLANING, RESURFACING, GUARDRAIL REPLACEMENT, AND STRIPE ON SR-3 (US-31) FROM 0.300 MILE SOUTH OF THE RAILROAD OVERPASS TO THE SOUTH END OF THE LITTLE ESCAMBIA C | 0903 | 2 | H. O. Weaver & Sons, Inc. | $1,534,638 | $1,557,132 | +1.0% | ALDOT |
| 20230224048 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-27 FROM SR-14 TO CR-29 AND ON CR-29 FROM CR-27 TO SR-14 SOUTHWEST OF PRATTVILLE | 0601 | 3 | Asphalt Contractors, Inc. | $1,075,848 | $1,119,420 | +4.0% | ALDOT |
| 20230224062 | INTERSECTION AND ROADWAY IMPROVEMENTS (LANE RECONFIGURATION) ON SR-1 (US-278/US-431) AT SR-291 (HOOD AVENUE) IN GADSDEN | 0105 | 1 | Vulcan Materials Asphalt and Construction, | $1,069,025 | ALDOT | ||
| 20230224061 | ROADWAY IMPROVEMENTS (LEFT TURN LANE ADDITION) ON SR-75 NORTH AT CR-26 SOUTHWEST OF SUSAN MOORE | 0302 | 1 | Whitaker Contracting Corporation | $521,748 | ALDOT | ||
| 20230224011 | ROADWAY SAFETY IMPROVEMENTS ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS | 0405 | 1 | Ozark Striping Company, LLC | $169,085 | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.