ALDOT contract 20260130013 bid tabulation
CABLE GUIDERAIL REMOVAL, MEDIAN GRADING, DRAINAGE IMPROVEMENTS, AND DOUBLE-FACED GUARDRAIL INSTALLATION ON I-65 FROM THE WALNUT CREEK BRIDGE IN CLANTON TO A POINT 0.900 MILE NORTH OF THE CR-43 OVERPASS. Let by Alabama DOT on January 30, 2026, Chilton, 0504. 2 bids received; low bid $7,981,651 by Dominion Construction Company, Inc..
- Owner
- Alabama DOT
- Letting
- 30 JAN 2026
- Pay items
- 63
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dominion Construction Company, Inc. | $7,981,651 | Low |
| 2 | Chilton Contractors, Inc. | $9,292,029 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dominion Construction Company, Inc. | 2. Chilton Contractors, Inc. |
|---|---|---|---|---|---|
| 0010 | Removing concrete flumes (206C003) | SY | 2,389 | $10.93 | $9.29 |
| 0020 | Removing pipe (206D000) | LF | 75 | $105.00 | $161.43 |
| 0030 | Removing guardrail (206D001) | LF | 1,538 | $3.15 | $3.33 |
| 0040 | Removing cable guiderail (206D033) | LF | 31,088 | $3.86 | $4.08 |
| 0050 | Removing inlets (206E001) | EACH | 55 | $1,500.00 | $1,061.59 |
| 0060 | Removing guardrail end anchor (all type) (206E008) | EACH | 12 | $262.50 | $277.20 |
| 0070 | Unclassified excavation (210A000) | CY | 11,729 | $13.32 | $12.77 |
| 0080 | Borrow excavation (A4 or better) (210D011) | CY | 60,065 | $21.00 | $15.77 |
| 0090 | Structure excavation (214A000) | CY | 558 | $15.75 | $28.31 |
| 0100 | Foundation backfill, commercial (214B001) | CY | 164 | $76.13 | $102.80 |
| 0110 | Crushed aggregate, section 825, for miscellaneous use (305B077) | TON | 2,026 | $35.18 | $46.17 |
| 0125 | Aggregate surfacing (aldot#3) (430B052) | TON | 3,960 | $43.58 | $57.28 |
| 0130 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 142 | $78.75 | $59.82 |
| 0140 | 15" roadway pipe (class 3 R.C.) (extension) (530A100) | LF | 4 | $210.00 | $344.36 |
| 0150 | 24" roadway pipe (class 3 R.C.) (extension) (530A102) | LF | 3 | $210.00 | $469.87 |
| 0160 | 15" roadway pipe (14 gauge C.C.S.) (530A151) | LF | 4 | $210.00 | $1,469.66 |
| 0170 | 15" roadway pipe rehabilitation (538A002) | LF | 18 | $1,107.75 | $1,169.80 |
| 0180 | Mobilization (600A000) | LS | 1 | $430,000 | $399,000 |
| 0190 | Special underdrain outlet, type A (605B000) | EACH | 92 | $682.50 | $698.88 |
| 0200 | Filter blanket, geotextile (610D003) | SY | 21,150 | $3.40 | $3.47 |
| 0210 | Slope paving (614A000) | CY | 2,128 | $509.25 | $914.77 |
| 0220 | Minor structure concrete (620A000) | CY | 1 | $577.50 | $4,324.38 |
| 0230 | Junction boxes, type 1 or 1P (621A011) | EACH | 7 | $5,775.00 | $4,546.14 |
| 0240 | Junction boxes, type 1 or 2P (621A019) | EACH | 3 | $8,400.00 | $5,654.95 |
| 0250 | Junction box units, type 1 or 1P (621B011) | EACH | 1 | $1,207.50 | $1,219.70 |
| 0260 | Junction box units, type 1 or 2P (621B014) | EACH | 5 | $1,207.50 | $1,330.58 |
| 0270 | Inlets, type Y (621C020) | EACH | 27 | $4,987.50 | $4,878.78 |
| 0280 | Inlets, type Y (modified) (621C132) | EACH | 28 | $5,775.00 | $6,375.68 |
| 0290 | Inlet units, type Y (621D019) | EACH | 52 | $1,155.00 | $1,219.70 |
| 0300 | Inlet units, type Y (modified) (621D055) | EACH | 59 | $1,155.00 | $1,441.46 |
| 0305 | Cable guiderail anchor (MASH) (624B001) | EACH | 5 | $8,400.00 | $8,870.52 |
| 0310 | Concrete median or safety barrier, type CSF-42 (FO) (629A097) | LF | 292 | $635.37 | $731.82 |
| 0320 | Steel beam guardrail, class A, type 2 (630A001) | LF | 300 | $23.10 | $24.39 |
| 0330 | Steel beam guardrail, class A, type 2 (double faced median barrier) (630A018) | LF | 28,463 | $71.40 | $75.40 |
| 0340 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 4 | $1,470.00 | $1,552.34 |
| 0350 | Guardrail end anchor, type 13 (MASH) (630C079) | EACH | 6 | $3,570.00 | $3,769.97 |
| 0360 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 4 | $3,465.00 | $3,659.09 |
| 0370 | Topsoil (650A000) | CY | 16,501 | $13.32 | $16.75 |
| 0380 | Seeding (652A100) | ACRE | 29 | $1,575.00 | $1,663.22 |
| 0390 | Solid sodding (bermuda) (654A001) | SY | 17,368 | $7.35 | $7.76 |
| 0400 | Mulching (656A010) | ACRE | 29 | $1,942.50 | $2,051.31 |
| 0410 | Temporary seeding (665A000) | ACRE | 29 | $446.25 | $471.25 |
| 0420 | Temporary mulching (665B001) | TON | 174 | $467.25 | $493.42 |
| 0430 | Polyethylene (665E000) | SY | 1,000 | $4.20 | $4.44 |
| 0440 | Sand bags (665G000) | EACH | 6,700 | $10.50 | $11.09 |
| 0450 | Silt fence (665J002) | LF | 500 | $4.20 | $5.54 |
| 0460 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 500 | $40.43 | $70.82 |
| 0470 | Silt fence removal (665O001) | LF | 500 | $1.05 | $1.11 |
| 0480 | Inlet protection, stage 3 or 4 (665P005) | EACH | 57 | $393.75 | $415.81 |
| 0490 | Wattle (665Q002) | LF | 6,100 | $10.50 | $11.09 |
| 0500 | Pest control treatment (666A001) | ACRE | 30 | $42.00 | $44.35 |
| 0510 | Geometric controls (680A001) | LS | 1 | $100,000 | $130,907 |
| 0520 | Construction fuel (maximum bid limited to $ 349,000.00) (698A000) | LS | 1 | $500.00 | $111,086 |
| 0530 | Portable concrete safety barriers, type 6 (726A000) | LF | 10,560 | $57.23 | $81.12 |
| 0540 | Portable concrete safety barriers, type 6-A (726A001) | LF | 20 | $10.50 | $81.12 |
| 0550 | Portable impact attenuator assembly (unidirectional,TL-3) (726D025) | EACH | 2 | $13,125 | $11,009 |
| 0560 | Truck mounted impact attenuator unit (728A000) | EACH | 2 | $15,490 | $37,256 |
| 0570 | Pole for mounting traffic detection equipment (731B000) | EACH | 1 | $28,098 | $29,672 |
| 0580 | Construction signs (740B000) | SF | 1,344 | $6.05 | $6.65 |
| 0590 | Channelizing drums (740D000) | EACH | 250 | $55.00 | $28.83 |
| 0600 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $2,800.00 | $3,304.27 |
| 0610 | Portable changeable message sign, type 2 (742A001) | EACH | 4 | $4,800.00 | $9,813.01 |
| 0620 | Trainee hours at 80 cents per hour (999 000) | HR | 1,040 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of January 30, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.