ALDOT contract 20260731022 bid tabulation
ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET FROM A POINT NEAR THE BLACK CREEK BRIDGE TO THE INTERSECTION OF RANDALL STREET IN GADSDEN. Let by Alabama DOT on July 31, 2026, Etowah, 0105. 5 bids received; low bid $2,148,030 by Lambert Contracting, LLC.
- Owner
- Alabama DOT
- Letting
- 31 JUL 2026
- Pay items
- 91
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lambert Contracting, LLC | $2,148,030 | Low |
| 2 | Gillespie Construction, LLC | $2,329,764 | +8.0% |
| 3 | Alabama Grading & Excavation, LLC. | $2,341,981 | +9.0% |
| 4 | Vulcan Materials Asphalt and Construction, | $2,675,190 | +25% |
| 5 | Wiregrass Construction Company, Inc. | $3,205,153 | +49% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lambert Contracting, LLC | 2. Gillespie Construction, LLC | 3. Alabama Grading & Excavation, LLC. | 4. Vulcan Materials Asphalt and Construction, | 5. Wiregrass Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 0020 | Removal of old box culvert, station 18+82.15 (206B000) | LS | 1 | $21,517 | $55,000 | $11,410 | $16,000 | $15,157 |
| 0030 | Removing concrete sidewalk (206C000) | SY | 50 | $61.19 | $35.00 | $32.00 | $40.00 | $91.08 |
| 0040 | Removing concrete driveway (206C010) | SY | 92 | $66.51 | $35.00 | $35.00 | $35.00 | $107.67 |
| 0050 | Removing concrete steps (206C021) | SY | 41 | $74.62 | $35.00 | $258.11 | $65.00 | $156.27 |
| 0060 | Removing curb and gutter (206D003) | LF | 1,402 | $10.51 | $30.00 | $15.39 | $10.00 | $22.17 |
| 0070 | Removing inlets (partial) (206E042) | EACH | 1 | $3,059.45 | $5,000.00 | $1,250.00 | $2,000.00 | $3,399.38 |
| 0080 | Unclassified excavation (210A000) | CY | 3,162 | $18.72 | $45.00 | $27.31 | $35.00 | $51.78 |
| 0090 | Borrow excavation (loose truckbed measurement) (210D001) | CY | 10,048 | $14.32 | $28.00 | $23.50 | $35.00 | $44.33 |
| 0100 | Borrow excavation (underwater embankment) (210F001) | TON | 1,915 | $62.96 | $75.00 | $73.93 | $82.00 | $66.24 |
| 0110 | Structure excavation (214A000) | CY | 762 | $13.16 | $45.00 | $35.00 | $35.00 | $31.66 |
| 0120 | Foundation backfill, commercial (214B001) | CY | 441 | $71.04 | $75.00 | $60.00 | $90.00 | $85.16 |
| 0130 | Geosynthetic reinforcement for soft soil stabilization, type 2 (243A034) | SY | 324 | $12.32 | $25.00 | $15.65 | $7.00 | $5.56 |
| 0140 | Cement mortar flowable backfill, mix 1 (260A000) | CY | 10 | $1,161.54 | $950.00 | $650.00 | $650.00 | $1,774.71 |
| 0150 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 3,613 | $20.57 | $35.00 | $15.00 | $19.00 | $26.72 |
| 0160 | Bituminous treatment A (401A000) | SY | 2,982 | $2.00 | $1.40 | $6.09 | $1.20 | $2.11 |
| 0170 | Tack coat (405A000) | GAL | 504 | $5.00 | $5.00 | $5.09 | $4.50 | $4.96 |
| 0180 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 2,302 | $10.00 | $6.00 | $7.34 | $5.00 | $10.60 |
| 0190 | Material remixing device (410H000) | EACH | 1 | $10,000 | $12,000 | $15,000 | $20,000 | $25,000 |
| 0200 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range A/B (424A340) | TON | 516 | $174.00 | $210.00 | $120.32 | $195.00 | $181.28 |
| 0210 | Superpave bituminous concrete upper binder layer, 3/4" maximum aggregate size mix, esal range A/B (424B635) | TON | 335 | $188.00 | $192.00 | $108.40 | $165.00 | $207.96 |
| 0220 | Superpave bituminous concrete upper binder layer, patching, 3/4" maximum aggregate size mix, esal range A/B (424B639) | TON | 50 | $400.00 | $240.00 | $127.37 | $210.00 | $409.86 |
| 0230 | Superpave bituminous concrete upper binder layer, leveling, 3/4" maximum aggregate size mix, esal range A/B (424B643) | TON | 155 | $187.00 | $240.00 | $122.54 | $210.00 | $197.03 |
| 0240 | Superpave bituminous concrete upper binder layer, widening, 3/4" maximum aggregate size mix, esal range A/B (424B646) | TON | 13 | $420.00 | $450.00 | $222.73 | $400.00 | $481.21 |
| 0250 | Aggregate surfacing (1" down, crusher run) (430B043) | TON | 75 | $72.39 | $75.00 | $58.24 | $125.00 | $85.67 |
| 0260 | Steel reinforcement (502A000) | LB | 13,264 | $2.17 | $2.50 | $3.00 | $1.70 | $1.57 |
| 0270 | Culvert concrete extension (cast in place) (524B011) | CY | 80 | $4,588.54 | $1,250.00 | $5,800.00 | $3,300.00 | $3,107.17 |
| 0280 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 58 | $118.08 | $125.00 | $117.23 | $150.00 | $117.47 |
| 0290 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 524 | $85.39 | $125.00 | $63.46 | $90.00 | $84.94 |
| 0300 | 24" storm sewer pipe (class 3 R.C.) (533A099) | LF | 158 | $98.00 | $135.00 | $132.96 | $105.00 | $97.49 |
| 0310 | Mobilization (600A000) | LS | 1 | $211,500 | $199,384 | $248,659 | $304,099 | $750,931 |
| 0320 | Right of way markers (602A000) | EACH | 15 | $1,254.16 | $1,100.00 | $672.19 | $1,150.00 | $1,578.67 |
| 0330 | Separation geotextile (608A000) | SY | 1,337 | $12.53 | $15.00 | $3.52 | $14.00 | $8.04 |
| 0340 | Loose riprap, class 2 (610C001) | TON | 103 | $121.96 | $75.00 | $105.00 | $120.00 | $126.97 |
| 0350 | Filter blanket, aggregate (610D004) | SY | 451 | $12.46 | $15.00 | $4.73 | $35.00 | $12.60 |
| 0360 | Concrete sidewalk, 4" thick (618A000) | SY | 1,590 | $80.17 | $100.00 | $92.00 | $120.00 | $79.76 |
| 0370 | Concrete driveway, 6" thick (includes wire mesh) (618B003) | SY | 48 | $186.75 | $135.00 | $160.00 | $170.00 | $185.79 |
| 0380 | Detectable warning surface (618C001) | SF | 68 | $125.59 | $50.00 | $50.00 | $85.00 | $124.95 |
| 0390 | Curb ramp (618D000) | SY | 30 | $414.08 | $350.00 | $352.00 | $200.00 | $411.94 |
| 0400 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 2 | $2,772.05 | $2,250.00 | $1,947.00 | $2,300.00 | $2,714.53 |
| 0410 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 3 | $2,879.04 | $2,500.00 | $2,189.00 | $2,600.00 | $2,864.17 |
| 0420 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 8 | $5,195.09 | $4,000.00 | $6,250.00 | $10,000 | $5,387.48 |
| 0430 | Inlets, type C (621C027) | EACH | 1 | $5,091.65 | $4,500.00 | $5,000.00 | $8,500.00 | $6,335.72 |
| 0440 | Inlets, type S1 or S3 (partial) (621C094) | EACH | 1 | $2,789.78 | $4,500.00 | $5,500.00 | $8,000.00 | $2,994.60 |
| 0450 | Inlet units, type S1 or S3 (621D015) | EACH | 1 | $1,775.56 | $2,500.00 | $2,000.00 | $2,000.00 | $1,766.39 |
| 0460 | Inlet units, type C, P1 or P3 (621D022) | EACH | 1 | $1,186.46 | $2,500.00 | $2,200.00 | $1,250.00 | $1,180.33 |
| 0470 | Concrete gutter (623A000) | LF | 64 | $36.00 | $40.00 | $57.50 | $55.00 | $36.38 |
| 0480 | Combination curb & gutter, type C (623C000) | LF | 2,102 | $18.00 | $35.00 | $28.89 | $46.00 | $43.40 |
| 0490 | Steel beam guardrail, class A, type 2 (630A001) | LF | 94 | $34.50 | $41.40 | $35.20 | $44.00 | $34.86 |
| 0500 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 2 | $4,000.00 | $4,800.00 | $4,620.00 | $5,000.00 | $4,041.85 |
| 0510 | Steel beam guardrail for culvert, class A, type 2, case 3 (630G003) | LF | 44 | $200.00 | $240.00 | $319.00 | $300.00 | $202.09 |
| 0520 | 10 inch P.V.C. water main laid (641A750) | LF | 488 | $121.36 | $65.00 | $42.94 | $95.00 | $120.74 |
| 0530 | Ductile iron fittings (641C500) | LB | 605 | $17.93 | $15.00 | $12.00 | $25.00 | $17.84 |
| 0540 | 10 inch gate valve with box (641J520) | EACH | 1 | $6,329.02 | $6,000.00 | $4,487.00 | $7,500.00 | $6,296.32 |
| 0550 | Concrete for water mains (thrust blocks) (641L500) | CY | 5 | $779.44 | $300.00 | $268.64 | $1,000.00 | $775.42 |
| 0560 | 10 inch retainer gland (641M516) | EACH | 12 | $332.24 | $250.00 | $263.53 | $300.00 | $330.53 |
| 0570 | 10 inch X 10 inch tapping valve and sleeve (641O536) | EACH | 1 | $1,845.81 | $9,500.00 | $6,407.98 | $13,600 | $1,836.27 |
| 0580 | 60 inch manhole unit (645I505) | EACH | 1 | $3,780.66 | $3,000.00 | $3,730.78 | $3,000.00 | $3,761.13 |
| 0590 | Manhole frame and cover reset (645K500) | EACH | 1 | $1,713.11 | $750.00 | $1,554.14 | $2,900.00 | $1,704.26 |
| 0600 | 20 inch steel encasement pipe, type 1 installation (649A555) | LF | 10 | $128.16 | $250.00 | $476.67 | $260.00 | $127.49 |
| 0610 | Topsoil (650A000) | CY | 1,915 | $33.92 | $50.00 | $50.64 | $52.00 | $55.58 |
| 0620 | Seeding (652A100) | ACRE | 1 | $1,750.00 | $2,100.00 | $1,672.71 | $2,400.00 | $1,151.93 |
| 0630 | Solid sodding (654A000) | SY | 2,675 | $8.50 | $10.20 | $7.00 | $12.00 | $9.12 |
| 0640 | Mulching (656A010) | ACRE | 1 | $1,650.00 | $1,980.00 | $2,827.71 | $2,050.00 | $1,343.91 |
| 0650 | Erosion control product, type C4 (659C005) | SY | 105 | $1.59 | $6.30 | $29.39 | $4.00 | $3.94 |
| 0660 | Erosion control product, type C8 (659C007) | SY | 105 | $5.25 | $6.30 | $30.95 | $10.00 | $6.84 |
| 0670 | Temporary seeding (665A000) | ACRE | 4 | $812.50 | $975.00 | $1,448.31 | $420.00 | $580.76 |
| 0680 | Temporary mulching (665B001) | TON | 12 | $800.00 | $960.00 | $750.00 | $370.00 | $599.96 |
| 0690 | Sand bags (665G000) | EACH | 50 | $13.90 | $9.30 | $9.00 | $12.00 | $5.81 |
| 0700 | Silt fence (665J002) | LF | 2,610 | $2.59 | $3.11 | $6.00 | $5.00 | $4.75 |
| 0710 | Floating basin boom (665L000) | LF | 225 | $59.02 | $28.43 | $85.00 | $50.00 | $20.98 |
| 0720 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 100 | $111.30 | $75.00 | $47.93 | $85.00 | $134.95 |
| 0730 | Silt fence removal (665O001) | LF | 2,610 | $1.05 | $1.26 | $1.65 | $0.60 | $1.92 |
| 0740 | Inlet protection, stage 3 or 4 (665P005) | EACH | 12 | $166.00 | $199.20 | $260.65 | $420.00 | $72.00 |
| 0750 | Wattle, 20 inch (665Q020) | LF | 730 | $11.05 | $13.26 | $10.00 | $12.00 | $8.64 |
| 0760 | Geometric controls (680A001) | LS | 1 | $63,600 | $40,000 | $30,000 | $110,000 | $97,306 |
| 0770 | Construction fuel (maximum bid limited to $ 160,000.00) (698A000) | LS | 1 | $1.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0780 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 1 | $6,600.00 | $7,920.00 | $5,665.00 | $4,100.00 | $6,669.05 |
| 0790 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 1 | $6,600.00 | $7,920.00 | $5,665.00 | $4,100.00 | $6,669.05 |
| 0800 | Solid temporary traffic stripe (701C001) | MI | 2 | $3,500.00 | $4,200.00 | $2,035.00 | $1,300.00 | $3,536.62 |
| 0810 | Traffic control markings, class 2, type A (703A002) | SF | 242 | $6.25 | $7.50 | $9.90 | $12.00 | $6.32 |
| 0820 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 47 | $6.50 | $7.80 | $7.70 | $12.00 | $6.57 |
| 0830 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 18 | $22.00 | $36.00 | $33.00 | $30.00 | $30.31 |
| 0840 | Class 10 aluminum flat sign panels (type XI background, fluorescent) (710A164) | SF | 22 | $23.00 | $36.00 | $38.50 | $31.00 | $35.37 |
| 0850 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 52 | $19.00 | $28.80 | $22.00 | $22.00 | $20.21 |
| 0860 | Construction signs (740B000) | SF | 486 | $6.00 | $7.20 | $6.60 | $10.00 | $6.06 |
| 0870 | Channelizing drums (740D000) | EACH | 50 | $23.00 | $36.00 | $60.50 | $40.00 | $55.58 |
| 0880 | Cones (36 inches high) (740E000) | EACH | 50 | $27.97 | $28.80 | $39.60 | $30.00 | $50.40 |
| 0890 | Barricades, type III (740F002) | EACH | 8 | $215.00 | $222.00 | $385.00 | $130.00 | $353.66 |
| 0900 | Pilot car (740O000) | EACH | 1 | $17,078 | $10,712 | $10,000 | $500.00 | $16,268 |
| 0910 | Portable changeable message sign, type 2 (742A001) | EACH | 3 | $4,350.00 | $5,400.00 | $6,875.00 | $2,300.00 | $6,315.39 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 31, 2026. Compiled by Mirage Metrics.