ALDOT contract 20251107057 bid tabulation
INTERSECTION IMPROVEMENTS TO INCLUDE LEFT TURN LANE ADDITION ON SR-57 (US-45) AT CR-1 TO INCLUDE LEFT TURN LANES ON SR-57 (US-45) IN FRUITDALE. Let by Alabama DOT on November 7, 2025, Washington, 0804. 8 bids received; low bid $1,206,325 by Pine City Contracting, LLC.
- Owner
- Alabama DOT
- Letting
- 07 NOV 2025
- Pay items
- 68
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pine City Contracting, LLC | $1,206,325 | Low |
| 2 | J. Hunt Enterprises General Contractors, LLC | $1,356,508 | +12% |
| 3 | Harwell and Company, LLC | $1,382,735 | +15% |
| 4 | Wiregrass Construction Company, Inc. | $1,489,892 | +24% |
| 5 | McElhenney Construction Co., LLC | $1,510,107 | +25% |
| 6 | PL Russell LLC | $1,515,000 | +26% |
| 7 | C. Thornton, Inc. | $1,677,211 | +39% |
| 8 | Cornerstone Civil Contractors, LLC | $1,823,191 | +51% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pine City Contracting, LLC | 2. J. Hunt Enterprises General Contractors, LLC | 3. Harwell and Company, LLC | 4. Wiregrass Construction Company, Inc. | 5. McElhenney Construction Co., LLC | 6. PL Russell LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 1 acre) (201A002) | LS | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $5,625.34 |
| 0020 | Removing pipe (206D000) | LF | 76 | $20.00 | $25.00 | $22.00 | $16.91 | $26.41 | $25.31 |
| 0030 | Removing headwalls (206E000) | EACH | 2 | $250.00 | $350.00 | $750.00 | $141.44 | $713.32 | $421.90 |
| 0040 | Unclassified excavation (210A000) | CY | 1,787 | $12.00 | $15.00 | $18.00 | $45.31 | $39.94 | $30.51 |
| 0050 | Borrow excavation (loose truckbed measurement)(A4 or better) (210D021) | CY | 2,165 | $18.00 | $18.50 | $23.50 | $30.58 | $38.48 | $34.02 |
| 0060 | Structure excavation (214A000) | CY | 31 | $50.00 | $20.00 | $58.00 | $27.86 | $16.56 | $36.20 |
| 0070 | Foundation backfill, commercial (214B001) | CY | 21 | $150.00 | $100.00 | $150.00 | $130.73 | $154.21 | $187.89 |
| 0085 | Roadbed processing (230A000) | RBST | 42 | $275.00 | $250.00 | $1,200.00 | $1,444.15 | $891.59 | $483.93 |
| 0090 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 5,360 | $26.00 | $23.47 | $50.00 | $41.00 | $37.15 | $34.56 |
| 0100 | Bituminous treatment A (401A000) | SY | 5,360 | $1.50 | $2.30 | $1.25 | $1.50 | $1.22 | $1.50 |
| 0110 | Tack coat (405A000) | GAL | 2,587 | $5.25 | $6.90 | $4.50 | $4.07 | $8.55 | $5.76 |
| 0120 | Planing existing pavement (approximately 1.10" thru 2.0" thick) (408A052) | SY | 7,270 | $3.00 | $4.03 | $1.75 | $3.76 | $4.16 | $5.76 |
| 0130 | Superpave bituminous concrete wearing surface layer, 3/4" maximum aggregate size mix, esal range C/D (424A361) | TON | 1,142 | $137.00 | $170.20 | $122.50 | $133.90 | $157.25 | $167.17 |
| 0140 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 602 | $130.00 | $164.45 | $175.00 | $166.19 | $161.22 | $201.75 |
| 0150 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 150 | $225.00 | $164.45 | $250.00 | $255.08 | $188.71 | $201.75 |
| 0160 | Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424B657) | TON | 150 | $148.50 | $170.20 | $250.00 | $156.99 | $161.22 | $184.46 |
| 0170 | Superpave bituminous concrete upper binder layer, leveling, 3/4" maximum aggregate size mix, esal range C/D (424B658) | TON | 250 | $148.50 | $166.75 | $185.00 | $151.84 | $161.22 | $184.46 |
| 0180 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 1,153 | $130.00 | $164.46 | $120.00 | $134.51 | $133.73 | $161.40 |
| 0190 | Scoring bituminous pavement surface (428A001) | MI | 1 | $14,000 | $16,675 | $4,080.00 | $1,867.45 | $488.49 | $8,646.59 |
| 0200 | Aggregate surfacing (1" down, crusher run) (430B043) | TON | 500 | $80.00 | $88.00 | $85.00 | $93.68 | $91.10 | $115.08 |
| 0210 | Steel reinforcement (502A000) | LB | 1,480 | $2.50 | $4.00 | $1.70 | $2.71 | $6.11 | $7.87 |
| 0220 | Culvert concrete extension (cast in place) (524B011) | CY | 17 | $3,921.76 | $3,000.00 | $750.00 | $4,255.11 | $3,663.68 | $1,625.25 |
| 0230 | 24" roadway pipe (class 3 R.C.) (extension) (530A102) | LF | 21 | $150.00 | $150.00 | $150.00 | $403.87 | $157.40 | $134.63 |
| 0240 | 24" side drain pipe (class 3 R.C.) (535A085) | LF | 76 | $75.00 | $125.00 | $150.00 | $115.16 | $160.81 | $73.11 |
| 0250 | Mobilization (600A000) | LS | 1 | $100,000 | $75,000 | $100,000 | $101,800 | $107,795 | $120,988 |
| 0260 | Filter blanket, geotextile (610D003) | SY | 500 | $5.00 | $3.50 | $10.00 | $8.25 | $4.74 | $5.49 |
| 0270 | Slope paving (614A000) | CY | 30 | $585.00 | $1,200.00 | $750.00 | $634.73 | $1,038.04 | $648.23 |
| 0280 | 24" roadway pipe end treatment, class 1 (619A003) | EACH | 2 | $1,800.00 | $2,000.00 | $1,250.00 | $1,953.00 | $1,953.97 | $1,527.25 |
| 0290 | 24" side drain pipe end treatment, class 1 (619A102) | EACH | 2 | $2,300.00 | $2,000.00 | $1,250.00 | $2,495.50 | $1,892.90 | $1,583.17 |
| 0300 | Minor structure concrete (620A000) | CY | 1 | $1,500.00 | $1,500.00 | $750.00 | $1,627.50 | $2,076.09 | $3,618.30 |
| 0310 | Steel beam guardrail, class A, type 2 (630A001) | LF | 838 | $23.00 | $26.45 | $27.60 | $24.96 | $28.09 | $26.52 |
| 0320 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 4 | $1,350.00 | $1,553.00 | $1,620.00 | $1,464.75 | $1,648.66 | $1,556.39 |
| 0330 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 4 | $2,800.00 | $3,220.00 | $3,360.00 | $3,038.00 | $3,419.44 | $3,228.06 |
| 0340 | Steel beam guardrail for culvert, class A, type 2, case 4 (630G004) | LF | 150 | $45.00 | $51.75 | $54.00 | $48.83 | $54.96 | $51.88 |
| 0350 | Topsoil (650A000) | CY | 725 | $28.00 | $25.00 | $32.00 | $41.33 | $41.86 | $50.67 |
| 0360 | Mowing (652C000) | ACRE | 4 | $300.00 | $250.00 | $360.00 | $325.50 | $519.02 | $489.97 |
| 0370 | Solid sodding (654A000) | SY | 7,000 | $5.00 | $9.00 | $5.40 | $5.43 | $6.23 | $5.88 |
| 0380 | Temporary seeding (665A000) | ACRE | 3 | $1,000.00 | $2,000.00 | $3,960.00 | $1,085.00 | $519.02 | $489.97 |
| 0390 | Temporary mulching (665B001) | TON | 9 | $375.00 | $2,000.00 | $1,400.00 | $406.88 | $702.21 | $662.90 |
| 0400 | Polyethylene (665E000) | SY | 500 | $3.00 | $3.50 | $1.00 | $3.66 | $2.56 | $2.42 |
| 0410 | Sand bags (665G000) | EACH | 100 | $12.00 | $5.00 | $18.75 | $13.02 | $10.38 | $9.80 |
| 0420 | Silt fence (665J002) | LF | 1,521 | $5.00 | $6.50 | $5.40 | $12.83 | $5.01 | $4.73 |
| 0430 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 56 | $80.00 | $88.00 | $75.00 | $101.59 | $91.09 | $115.59 |
| 0440 | Silt fence removal (665O001) | LF | 1,521 | $1.50 | $1.00 | $1.25 | $1.63 | $1.83 | $1.73 |
| 0450 | Inlet protection, stage 3 or 4 (665P005) | EACH | 2 | $350.00 | $650.00 | $1,000.00 | $651.00 | $549.55 | $518.80 |
| 0460 | Wattle (665Q002) | LF | 420 | $11.00 | $8.00 | $8.00 | $11.94 | $11.60 | $10.95 |
| 0470 | Pest control treatment (666A001) | ACRE | 2 | $1,000.00 | $900.00 | $600.00 | $298.02 | $305.31 | $288.22 |
| 0480 | Geometric controls (680A001) | LS | 1 | $20,000 | $7,500.00 | $5,000.00 | $8,031.30 | $20,345 | $17,675 |
| 0490 | Construction fuel (maximum bid limited to $ 33,000.00) (698A000) | LS | 1 | $0.01 | $0.00 | $1.00 | $0.00 | $0.00 | $0.00 |
| 0500 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 1 | $4,200.00 | $5,750.00 | $5,820.00 | $4,557.00 | $5,129.15 | $5,591.46 |
| 0510 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,200.00 | $5,750.00 | $5,820.00 | $4,557.00 | $5,129.16 | $5,591.46 |
| 0520 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 360 | $2.00 | $0.46 | $1.20 | $2.17 | $2.44 | $1.15 |
| 0530 | Solid temporary traffic stripe (701C001) | MI | 8 | $1,050.00 | $2,300.00 | $9.60 | $1,139.25 | $1,282.29 | $461.15 |
| 0540 | Broken temporary traffic stripe (701E010) | LF | 1,522 | $0.20 | $0.58 | $1.20 | $0.22 | $0.24 | $1.15 |
| 0550 | Broken yellow, class 2, type A traffic stripe (5" wide) (701G256) | LF | 508 | $0.50 | $1.44 | $3.60 | $0.54 | $0.61 | $3.46 |
| 0560 | Traffic control markings, class 2, type A (703A002) | SF | 611 | $5.00 | $6.04 | $9.60 | $5.43 | $6.11 | $9.22 |
| 0570 | Traffic control legends, class 2, type A (703B002) | SF | 68 | $10.00 | $2.01 | $9.60 | $10.85 | $12.21 | $9.22 |
| 0580 | Temporary traffic control markings (703D001) | SF | 201 | $2.00 | $6.61 | $3.60 | $2.17 | $2.44 | $3.46 |
| 0590 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 22 | $5.50 | $6.61 | $8.40 | $5.97 | $6.72 | $8.07 |
| 0600 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 185 | $5.50 | $6.61 | $8.40 | $5.97 | $6.72 | $8.07 |
| 0610 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 41 | $5.50 | $6.61 | $8.40 | $5.97 | $6.72 | $8.07 |
| 0620 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 103 | $5.50 | $6.61 | $8.40 | $5.97 | $6.72 | $8.07 |
| 0630 | Roadway sign relocation (711A000) | LS | 1 | $1,800.00 | $2,070.00 | $2,160.00 | $1,085.00 | $2,198.21 | $2,075.18 |
| 0640 | Construction signs (740B000) | SF | 748 | $8.00 | $9.20 | $9.60 | $6.51 | $9.77 | $9.22 |
| 0650 | Channelizing drums (740D000) | EACH | 100 | $38.00 | $43.70 | $45.60 | $13.56 | $46.41 | $43.81 |
| 0660 | Cones (36 inches high) (740E000) | EACH | 100 | $16.00 | $18.40 | $19.20 | $28.75 | $19.54 | $18.45 |
| 0670 | Barricades, type III (740F002) | EACH | 4 | $215.00 | $250.00 | $258.00 | $108.50 | $262.57 | $247.87 |
| 0680 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $1,925.00 | $2,214.00 | $2,310.00 | $4,017.38 | $2,350.87 | $2,219.29 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.