ALDOT contract 20260731025 bid tabulation
INTERSECTION IMPROVEMENTS (ADDITIONAL TURN LANES AND TRAFFIC SIGNAL UPGRADES) ON SR-42 (US-98) AT CR-87 EAST OF FOLEY. Let by Alabama DOT on July 31, 2026, Baldwin, 0902. 6 bids received; low bid $861,338 by Arrington Curb & Excavation, Inc..
- Owner
- Alabama DOT
- Letting
- 31 JUL 2026
- Pay items
- 78
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Arrington Curb & Excavation, Inc. | $861,338 | Low |
| 2 | McElhenney Construction Co., LLC | $907,155 | +5.0% |
| 3 | PL Russell LLC | $949,026 | +10% |
| 4 | Wiregrass Construction Company, Inc. | $950,178 | +10% |
| 5 | Rob Middleton Construction, LLC | $955,127 | +11% |
| 6 | Gillespie Construction, LLC | $1,122,332 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Arrington Curb & Excavation, Inc. | 2. McElhenney Construction Co., LLC | 3. PL Russell LLC | 4. Wiregrass Construction Company, Inc. | 5. Rob Middleton Construction, LLC | 6. Gillespie Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Removing pipe (206D000) | LF | 147 | $9.00 | $20.63 | $26.38 | $10.83 | $13.11 | $35.00 |
| 0020 | Removing headwalls (206E000) | EACH | 2 | $450.00 | $795.41 | $329.68 | $99.55 | $214.93 | $750.00 |
| 0030 | Unclassified excavation (210A000) | CY | 925 | $17.00 | $31.19 | $31.79 | $43.08 | $11.91 | $45.00 |
| 0040 | Borrow excavation (loose truckbed measurement)(A2 or better) (210D020) | CY | 400 | $24.00 | $32.14 | $44.12 | $38.30 | $12.96 | $55.00 |
| 0050 | Structure excavation (214A000) | CY | 110 | $17.00 | $19.40 | $30.15 | $17.44 | $15.84 | $75.00 |
| 0060 | Foundation backfill, commercial (214B001) | CY | 135 | $78.00 | $119.32 | $172.73 | $138.83 | $153.37 | $75.00 |
| 0070 | Roadbed processing (230A000) | RBST | 9 | $250.00 | $870.40 | $605.06 | $1,317.36 | $230.30 | $1,200.00 |
| 0080 | Geosynthetic reinforcement for soft soil stabilization, type 2 (243A034) | SY | 750 | $4.50 | $4.63 | $5.60 | $7.53 | $4.33 | $7.00 |
| 0090 | Crushed aggregate base course, type B, plant mixed, 6" compacted thickness (301A012) | SY | 1,500 | $32.00 | $35.77 | $37.67 | $43.98 | $26.99 | $45.00 |
| 0100 | Bituminous treatment A (401A000) | SY | 1,500 | $1.30 | $2.09 | $0.01 | $1.39 | $2.05 | $3.06 |
| 0110 | Tack coat (405A000) | GAL | 750 | $5.50 | $9.54 | $7.18 | $4.15 | $6.33 | $6.00 |
| 0120 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 4,700 | $4.25 | $5.03 | $7.18 | $4.06 | $2.11 | $6.84 |
| 0130 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 550 | $170.00 | $153.21 | $168.67 | $170.78 | $202.42 | $240.00 |
| 0140 | Superpave bituminous concrete upper binder layer, 1" maximum aggregate size mix, esal range C/D (424B651) | TON | 180 | $145.00 | $166.33 | $197.38 | $231.45 | $197.94 | $269.46 |
| 0150 | Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424B657) | TON | 75 | $145.00 | $168.36 | $197.38 | $189.35 | $193.59 | $284.82 |
| 0160 | Superpave bituminous concrete lower binder layer, 1" maximum aggregate size mix, esal range C/D (424B681) | TON | 200 | $145.00 | $160.02 | $197.38 | $217.86 | $236.86 | $282.18 |
| 0170 | Scoring bituminous pavement surface (428A001) | MI | 1 | $312.00 | $4,172.69 | $358.87 | $1,095.29 | $383.75 | $360.00 |
| 0180 | Aggregate surfacing (crushed aggregate base, type B) (430B040) | TON | 50 | $89.00 | $86.06 | $108.50 | $99.01 | $71.92 | $65.00 |
| 0190 | 22" span, 14" rise side drain pipe (535B011) | LF | 160 | $135.00 | $102.48 | $73.67 | $95.82 | $55.69 | $150.00 |
| 0200 | Mobilization (600A000) | LS | 1 | $128,950 | $60,307 | $61,461 | $90,323 | $63,570 | $76,150 |
| 0210 | Right of way markers (602A000) | EACH | 6 | $300.00 | $397.40 | $445.83 | $518.14 | $486.26 | $1,100.00 |
| 0220 | Slope paving (614A000) | CY | 40 | $498.00 | $834.54 | $729.04 | $905.24 | $1,094.99 | $450.00 |
| 0230 | 22" span, 14" rise roadway pipe end treatment, class 1 (619B016) | EACH | 4 | $109.00 | $2,026.74 | $1,364.24 | $1,294.15 | $1,565.41 | $2,500.00 |
| 0240 | Topsoil (650A000) | CY | 350 | $28.00 | $48.02 | $42.19 | $45.31 | $25.19 | $50.00 |
| 0250 | Solid sodding (bermuda) (654A001) | SY | 2,520 | $6.00 | $6.08 | $8.37 | $5.39 | $7.67 | $12.00 |
| 0260 | Mulching (656A010) | ACRE | 1 | $2,800.00 | $2,145.95 | $897.18 | $1,903.50 | $1,534.99 | $2,000.00 |
| 0270 | Temporary seeding (665A000) | ACRE | 1 | $500.00 | $476.88 | $358.87 | $423.00 | $1,279.16 | $1,000.00 |
| 0280 | Temporary mulching (665B001) | TON | 3 | $500.00 | $953.76 | $358.87 | $846.00 | $767.50 | $1,500.00 |
| 0290 | Polyethylene (665E000) | SY | 1,000 | $2.50 | $2.98 | $3.59 | $2.64 | $1.28 | $6.00 |
| 0300 | Sand bags (665G000) | EACH | 200 | $8.00 | $5.00 | $9.57 | $10.84 | $17.91 | $9.00 |
| 0310 | Silt fence (665J002) | LF | 850 | $5.25 | $3.58 | $5.98 | $3.17 | $7.67 | $6.00 |
| 0320 | Silt fence removal (665O001) | LF | 850 | $1.00 | $1.79 | $1.20 | $1.59 | $1.92 | $2.00 |
| 0330 | Wattle, 20 inch (665Q020) | LF | 500 | $10.00 | $11.62 | $11.96 | $10.31 | $15.35 | $15.00 |
| 0340 | Pest control treatment (666A001) | ACRE | 1 | $200.00 | $298.04 | $149.53 | $264.38 | $383.75 | $100.00 |
| 0350 | Geometric controls (680A001) | LS | 1 | $9,000.00 | $11,755 | $13,622 | $7,377.58 | $14,474 | $20,000 |
| 0360 | Construction fuel (maximum bid limited to $ 51,000.00) (698A000) | LS | 1 | $0.10 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0370 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 1 | $4,160.00 | $4,768.79 | $4,784.95 | $4,758.75 | $5,770.48 | $4,500.00 |
| 0380 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 1 | $4,160.00 | $4,768.79 | $4,784.95 | $4,758.75 | $5,770.48 | $4,500.00 |
| 0390 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 500 | $2.60 | $2.98 | $2.99 | $2.12 | $0.96 | $1.20 |
| 0400 | Solid temporary traffic stripe (701C001) | MI | 2 | $1,040.00 | $1,192.20 | $1,196.24 | $740.25 | $1,055.63 | $1,080.00 |
| 0410 | Dotted temporary traffic stripe (701F000) | LF | 500 | $0.52 | $0.60 | $1.20 | $0.11 | $0.35 | $0.20 |
| 0420 | Traffic control markings, class 2, type A (703A002) | SF | 1,350 | $3.12 | $3.58 | $3.59 | $5.29 | $6.56 | $6.00 |
| 0430 | Traffic control legends, class 2, type A (703B002) | SF | 200 | $3.12 | $3.58 | $3.59 | $5.29 | $7.39 | $7.20 |
| 0440 | Temporary traffic control markings (703D001) | SF | 1,150 | $0.52 | $0.60 | $0.60 | $2.12 | $1.10 | $1.20 |
| 0450 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 110 | $4.16 | $4.77 | $4.78 | $5.29 | $5.33 | $4.80 |
| 0460 | Pavement markers, class A-H, type 1-A (705A031) | EACH | 80 | $4.16 | $4.77 | $4.79 | $5.29 | $5.33 | $4.80 |
| 0470 | Pavement markers, class A-H, type 1-B (705A032) | EACH | 120 | $4.16 | $4.77 | $4.78 | $5.29 | $5.33 | $4.80 |
| 0480 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 55 | $4.16 | $4.77 | $4.78 | $5.29 | $5.33 | $4.80 |
| 0490 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 55 | $4.16 | $4.77 | $4.78 | $5.29 | $5.33 | $4.80 |
| 0500 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 39 | $23.92 | $31.59 | $31.70 | $28.02 | $29.42 | $27.60 |
| 0510 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 42 | $22.88 | $22.06 | $22.13 | $19.56 | $28.14 | $23.32 |
| 0520 | Roadway sign relocation (711A000) | LS | 1 | $936.00 | $596.10 | $598.12 | $528.75 | $1,151.24 | $1,080.00 |
| 0530 | Removal of existing traffic control unit ( SR-42 (US-98) at CR-87 ) (730A000) | LS | 1 | $7,280.00 | $8,345.39 | $8,373.67 | $7,402.50 | $8,954.12 | $8,400.00 |
| 0540 | Removal of existing traffic control unit (temporary) ( SR-42 (US-98) at CR-87 ) (730A053) | LS | 1 | $6,760.00 | $7,749.29 | $7,775.55 | $6,873.75 | $8,314.54 | $7,800.00 |
| 0550 | Furnishing and installing traffic control unit ( SR-42 (US-98) at CR- 87 ) (730C000) | LS | 1 | $14,560 | $16,691 | $16,747 | $14,805 | $17,908 | $16,800 |
| 0560 | Furnishing and installing traffic control unit (temporary)( SR-42 (US- 98) at CR-87 ) (730C030) | LS | 1 | $10,400 | $11,922 | $11,962 | $10,575 | $12,792 | $12,000 |
| 0570 | Metal traffic signal pole foundation (730E000) | EACH | 3 | $4,160.00 | $4,768.79 | $4,784.95 | $4,230.00 | $5,116.64 | $4,800.00 |
| 0580 | Metal traffic signal pole with 50' mast arm assembly (730F000) | EACH | 1 | $28,080 | $32,189 | $32,298 | $28,553 | $34,537 | $32,400 |
| 0590 | Metal traffic signal pole with 45' and 65' mast arm assembly (730F001) | EACH | 1 | $43,680 | $50,072 | $50,242 | $44,415 | $53,725 | $50,400 |
| 0600 | Metal traffic signal pole with 45' mast arm assembly (730F002) | EACH | 1 | $23,920 | $27,421 | $27,513 | $24,323 | $29,421 | $27,600 |
| 0610 | Wood traffic signal strain pole (730G005) | EACH | 4 | $2,080.00 | $2,384.40 | $2,392.48 | $2,115.00 | $2,558.32 | $2,400.00 |
| 0620 | Traffic signal junction box type S2 (730K002) | EACH | 3 | $1,352.00 | $1,549.86 | $1,555.11 | $1,374.75 | $1,662.91 | $1,560.00 |
| 0630 | 1", non-metallic, conduit (730L003) | LF | 75 | $8.32 | $9.54 | $9.57 | $8.46 | $10.23 | $9.60 |
| 0640 | 2", metallic, conduit (730L004) | LF | 25 | $15.60 | $17.88 | $17.94 | $15.86 | $19.19 | $18.00 |
| 0650 | 2", non-metallic, conduit (730L005) | LF | 625 | $14.56 | $16.69 | $16.75 | $14.81 | $17.91 | $16.80 |
| 0660 | Luminaire extension assembly, 12' (730N000) | EACH | 4 | $2,340.00 | $2,682.45 | $2,691.54 | $2,379.38 | $2,878.11 | $2,700.00 |
| 0670 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 8 | $1,144.00 | $1,311.42 | $1,315.86 | $1,163.25 | $1,407.08 | $1,320.00 |
| 0680 | Vehicular signal head, 12 inch, 4 (730P023) | EACH | 2 | $1,456.00 | $1,669.08 | $1,674.74 | $1,480.50 | $1,790.83 | $1,680.00 |
| 0690 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 1 | $31,200 | $35,766 | $35,887 | $31,725 | $38,375 | $36,000 |
| 0700 | Electrical power service assembly with wood pole (730T010) | EACH | 1 | $31,200 | $35,766 | $35,887 | $31,725 | $38,375 | $36,000 |
| 0710 | Radar detection system ( SR-42 (US-98) at CR-87 ) (730U400) | LS | 1 | $39,520 | $45,304 | $45,457 | $40,185 | $48,608 | $45,600 |
| 0720 | Construction signs (740B000) | SF | 708 | $8.32 | $6.56 | $6.58 | $5.82 | $10.23 | $9.60 |
| 0730 | Channelizing drums (740D000) | EACH | 250 | $10.00 | $7.75 | $7.78 | $6.87 | $48.61 | $45.60 |
| 0740 | Cones (36 inches high) (740E000) | EACH | 150 | $10.00 | $1.19 | $19.14 | $38.07 | $20.47 | $19.20 |
| 0750 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $468.00 | $417.27 | $418.69 | $370.13 | $575.62 | $540.00 |
| 0760 | Portable changeable message sign, type 2 (742A001) | EACH | 4 | $1,092.00 | $655.71 | $657.93 | $634.50 | $1,343.12 | $1,260.00 |
| 0770 | Uniformed police officer (745A000) | HR | 32 | $145.00 | $59.61 | $89.72 | $68.74 | $63.32 | $75.00 |
| 0780 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 200 | $83.20 | $95.38 | $95.70 | $84.60 | $102.33 | $96.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 31, 2026. Compiled by Mirage Metrics.